| Ship: |
Oceanus |
Schedule Status: |
Final |
Schedule ID: |
10875 |
| Schedule Year: |
2010 |
Schedule Name: |
2010 Oceanus Schedule |
| Notes: |
12/4: added Bernhard cruise in May 01/07: changed transit and Baringer cruise ports and dates 04/09: added two days onto Bernhard for USGS 04/13: added cruise for Lee Freitag 06/3: added cruise for J. Chaytor and shifted following cruise dates 7/27: changed Gulf of Mex ports to Gulfport 9/14: added Gulfport port stop 9/14: added one day for NOAA DART mooring on transit 9/23:added a DART mooring recovery, Bridgetown to San Juan, ETD Oct 23 10/01: Oceanus delayed departure until 10/2 due to weather **Note Chaytor cruise was added to schedule to facilitate Endeavor Rapid cruise in GOM. 12/28: Published Final version 2010 schedule |
|
| Operator Cruise ID: |
|
| Chief Scientist: |
None |
| Activity Type: |
At Sea for Science |
| Created By: |
Elizabeth Caporelli |
|
|
Dates To Be Determined
|
| Load Non-charge Days: |
0 |
| Load Charge Days: |
0 |
|
Load Date: |
4/6/2010 |
| Activity Days: |
12 |
Adjustment Days |
Start Date: |
4/6/2010 |
| Transit Days: |
0 |
0 |
End Date: |
4/17/2010 |
| Unload Charge Days: |
1 |
|
Unload Date: |
4/18/2010 |
| Unload Non-charge Days: |
0 |
|
| Mob Days: |
2 |
|
| Science Days: |
22 |
Optimum Start Date: |
4/1/2010 |
| Transit Estimate: |
0 |
Earliest Start Date: |
2/1/2010 |
| Demob Days: |
1 |
Latest Start Date: |
4/10/2010 |
| Repeating Cruise: |
No |
Dates To Avoid: |
Dates to avoid are any start time after April 10, 2010. Foreign colleagues will be unavailable and this will be too close to the next scheduled cruise. |
| Number of Repeating Cruises: |
0 |
Repeating Interval: |
|
| Repeating Cruise Comments: |
|
| Justification/Comments: |
Seward Johnson or large vessel required as volume of mooring equipment cannot be supported by smaller vessels (i.e. Endeavor/Oceanus class are too small). Also Seward Johnson is capable of doing 50-60 full-ocean-depth CTD casts (i.e. to 6000 m) and it has a climate-controlled van for salinity/Autosal processing.
Latest start date limitation is due to conflict with later cruise for one participant group. |
|
| PI |
|
Project/Purpose |
|
Agency |
|
Funding Status |
|
Op Days |
| Molly Baringer, NOAA_AOML |
|
WBTS |
|
NOAA/OAR |
|
Funded |
|
13 |
|
|
|
| Requested Start Port: |
Fort Pierce, FL, USA |
| Intermediate Port(s): |
None |
| Requested End Port: |
Fort Pierce, FL, USA |
| Port Comments: |
Fort Pierce, home port for the Seward Johnson, is quite close to the working area. If different ship is used, any port near Florida east coast would be acceptable - Miami would be preferred. |
|
| |
Lat/Long |
Marsden Grid |
Navy Op Area |
|
Beginning
|
|
|
|
|
Ending
|
|
|
|
|
| |
| Op Area Description: |
|
|
| |
Lat/Long |
Marsden Grid |
Navy Op Area |
|
Beginning
|
|
|
|
|
Ending
|
|
|
|
|
| |
| Op Area Description: |
East of Bahamas |
|
|
Coastal States Requiring Clearance:
|
|
|
| Foreign Clearance Required: |
Yes |
|
Bahamas
|
| Foreign Clearance Comments: |
|
|
|
|
| Instrumentation Requested: |
|
| Instrumentation Comments: |
No science party vans planned, however if Seward Johnson is the vessel provided, we would want them to bring their climate-controlled van with Autosals for salinity processing. |
| Ancil Facilities Requested: |
|
| Ancil Facility Comments: |
|
|
| External Cruise Webpage: |
|
| Cruise Notes: |
|
|