Ship: |
Atlantis |
Schedule Status: |
Final |
Schedule ID: |
11329 |
Schedule Year: |
2011 |
Schedule Name: |
2011 Final |
Notes: |
1/3/12: Updated arrival Port Everglades to Dec 31. End 2011 12/12/11: Update arrival into Piraeus Greece Dec 8. 11/22/11: Update RV Atlantis arrival Piraeus Greece Nov 21 10/19/11: Added 3 days onto Nooner/Webb cruise. Shifted all subsequent transits and cruises 3 days later. Oct 29 will be Panama Canal transit. Sept 29: Changed German mob / demob port to Port Everglades. Added 2 days onto German cruise, 1 for Jason Engineering dive and 1 for transit (this will show in 2012 schedule). Aug 31: Johnson / Tivey cruise arrived 2 days early = 8/24. Added two Demob days onto their schedule 8/25 & 8/26. Aug 11: Edited Chadwick charge days between all co-Pi's. Aug 9: reconciled 2 op days on Fisher cruise from 21 to 23 = 219 total op days for 2011. August 2: Changed FISHER departure date to June 29. June 10: M.Zumberge droped out 2011 CHADWICK cruise. 1 dive day reduced = able to add in the 2nd mob day as originally scheduled. NO Change to NSF charge days. New Departure July 19. May 25: Changed June 13 - 17 San Diego port call. Added multibeam test and transit days to Astoria. Change of mob port for Fisher/Cowen/Becker in Astoria June 24- 27. May 24: Added one extra mobilization day that was lost due to A.Devol cruise being postponed to 2012. (we were using his 2nd demob day due to short turn around time in port). May 19: Jax ETD May 25. Sea trial May 24. Fuel and Final departure May 25 for San Diego. ETA SD June 13 May 3: Added 3 days for multibeam test (separated out from transit) - dates tbd. May 2, 2011: Canceled DEVOL cruise & removed 3 days for multibeam transit. New op days 213. Shifted Nooner to Oct 4 2011 / added Edgcomb and transit to C.German cruise. rescheduled Geotraces onto Knorr 3/30: Changed transit dates from Jax to San Digeo April 23 2011 - 23 days for multibeam testing. 3/17: May 4 -16 port call identified as Maintenance/A Frame mods 2/16/11: Added NSF Inspection May 3 -4 2/9/11: Changed departure date for Chadwick cruise to July 18. 1/4/11: Combined 4 day transit from GLFPT to JAX with SY period, combined Geotraces MOB with Transit to CV 1/4/11: Removed Schopfel cruise / 16 days ONR 11/24: Jenkins/Geotraces cruise added 11/04/10: Added Manzanillio Mx port stop to chng out science June 1 -2 / DEVOL 10/29/10: Removed HROV days, ports & dates after Valentine TBD 10/29/10: Added transit days to Jason JdF cruises for transit from station to port NOTE: A-FRAME MOD PORT TBD |
|
Operator Cruise ID: |
|
Chief Scientist: |
None |
Activity Type: |
Transit Cruise |
Created By: |
Eric Benway |
|
|
Dates To Be Determined
|
Load Non-charge Days: |
0 |
Load Charge Days: |
0 |
|
Load Date: |
10/30/2011 |
Activity Days: |
0 |
Adjustment Days |
Start Date: |
10/30/2011 |
Transit Days: |
23 |
0 |
End Date: |
11/21/2011 |
Unload Charge Days: |
0 |
|
Unload Date: |
11/21/2011 |
Unload Non-charge Days: |
0 |
|
Mob Days: |
|
|
Science Days: |
|
Optimum Start Date: |
|
Transit Estimate: |
|
Earliest Start Date: |
|
Demob Days: |
|
Latest Start Date: |
|
Repeating Cruise: |
|
Dates To Avoid: |
|
Number of Repeating Cruises: |
|
Repeating Interval: |
|
Repeating Cruise Comments: |
|
Justification/Comments: |
|
|
PI |
|
Project/Purpose |
|
Agency |
|
Funding Status |
|
Op Days |
|
|
Transit to Edgcomb |
|
NSF/OCE/EDU |
|
Funded |
|
23 |
|
|
Requested Start Port: |
|
Intermediate Port(s): |
|
Requested End Port: |
|
Port Comments: |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
|
Op Area Description: |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
|
Op Area Description: |
|
|
Coastal States Requiring Clearance:
|
|
|
Foreign Clearance Required: |
|
|
Foreign Clearance Comments: |
|
|
|
Instrumentation Requested: |
|
Instrumentation Comments: |
|
Ancil Facilities Requested: |
|
Ancil Facility Comments: |
|
|
External Cruise Webpage: |
|
Cruise Notes: |
11/22: Updated Atlantis arrival into Greece on Nov 21 (23 days transit)
10/27 = Canal transit - Cristobal to Piraeus = 5886nm = 22.3/22d + 1d = 23 days + 1 P Canal = 24 days |
|