View Cruise

  Schedule Information  
Ship: Atlantis Schedule Status: Final Schedule ID: 11597
Schedule Year: 2012 Schedule Name: Atlantis 2012 Final
Notes: Jan 15 Made Final.
11/5: Scheduled Transit to shipyard Nov 5 - 8 and dry dock period Nov 8 - Dec 31 2012.
8/15: Changed Armstrong Departure to Aug 15 and arrival Sept 10. Still 27 op days.
8/10/12: Added NAVY INSURV inspection Oct 22 - 26, Woods Hole Ma.
7/25/12: Removed "Hickey" Alvin Eng Sea Trial. Added 7 days to Forbes / Armstrong cruise. Changed Dep. to Aug 14 and arrival port to Woods Hole Sept 9.
7/9/12: Added 2 days onto this transit for NOAA Dart buoy service on buoy #41424 @ 32.922N, 72.466W . New ETA Aug 9 into WHOI.
6/19/12: Added NOAA/Canada joint collaboration cruise Aug 11 - 31, plus 8 day transit from Barbados to WHOI. Total of 29 days added. Boston still being used as a place holder until a shipyard is chosen for A Frame Modification in September.
6/11/12: May 28 Sea Trial for Traction / Markey winch. Used 1 mob day from Van Dover (NSF/OCE/BIO). Van Dover cruise end 1 day early June 17. D. Smith begin 1 day early June 21.
2/3/12: Removed German Alvin Sci Verification cruise. Shifted Hickey to Dec 1.
Added Debbie Smith cruise June 22 - * 20 days total . Shifted Yager to July 12 sailing. Shifted Swift mid cruise port stop to April 17 - 19 in Barbados.
12/21/11: a} Added 2 days to Feb transit to WHOI for multibeam training (Konsburg). b} Added Yager cruise June 23 - July 9. c} Boston added as port place holder for A Frame work. d} Shifted A Frame modifications to July 19 - Sep 16. e} Added Oct 1 dock trails. f} Shifted Hickey / Alvin Engineering sea trials to Nov 1.
10/27/11: Transit days from Barbados to US east coast port (7) now NON OP days (per nsf). Added maintenance periods (2) at WHOI.
10/20/11: Added 1 transit day Jan 1st & Shifted German, NSF inspection and transit PE to WHOI 3 days later.
10/17/11: Recalculated Van Dover sea days. Cruise ends June 18.
10/11/11: Updated transit dates from WHOI to Barbados. Added 1 Jason engineering dive day to Van Dover cruise. Added one mob day for Van Dover. Adjusted Transit dates Bridgetown to JAX June 21 - June 27. Added 1 demob day for Hickey.
10/4/11: Added two day NSF inspection schedule Jan 27 - 28 2012. Port Everglades to Port Everglades.
10/3/11: Published AT 2012 schedule.
  Cruise Information  
Ship Request Information
Operator Cruise ID:
Chief Scientist: Jody Klymak, UVic
Activity Type: At Sea for Science
Created By: Eric Benway
Compare Request:
Project Short Title: LATMIX2012
Requested Year: 2012
Requested Ship: Global  
Request Type: Primary  
Created By: Craig M. Lee  
Load Non-charge Days: 0
Load Charge Days: 3   Load Date: 2/19/2012
Activity Days: 21 Adjustment Days Start Date: 2/22/2012
Transit Days: 4 0 End Date: 3/17/2012
Unload Charge Days: 1   Unload Date: 3/18/2012
Unload Non-charge Days: 0
Mob Days: 3  
Science Days: 21 Optimum Start Date: 3/1/2012
Transit Estimate: 1 Earliest Start Date: 2/15/2012
Demob Days: 1 Latest Start Date: 3/15/2012
Repeating Cruise: No Dates To Avoid:
Number of Repeating Cruises: 0 Repeating Interval:
Repeating Cruise Comments:
Justification/Comments:
PI   Project/Purpose   Agency   Funding Status   Op Days
Craig M. Lee, UW_APL   LATMIX2012   NAVY/ONR/OAS   Funded   25
  Start Port: Woods Hole, MA, USA
  End Port: Woods Hole, MA, USA
Requested Start Port: Beaufort, NC, USA
Intermediate Port(s): None
Requested End Port: Beaufort, NC, USA
Port Comments:
  Lat/Long Marsden Grid Navy Op Area
Beginning
116 map
NA06 map
Ending
116 map
NA06 map
 
Op Area Description: Off N.Carolina
  Lat/Long Marsden Grid Navy Op Area
Beginning
34° N / 74° W map
116 map
NA06 map
Ending
34° N / 74° W map
116 map
NA06 map
  Show Degrees Minutes    
 
Op Area Description: Gulf Stream
Coastal States Requiring Clearance:
Foreign Clearance Required: No
Foreign Clearance Comments:
Ancil Facilities:
Instrumentation Requested:
Instrumentation Comments:
Ancil Facilities Requested:
Ancil Facility Comments:
External Cruise Webpage:
Cruise Notes: 8/31: Made this WHOI to WHOI. Have to add 2 days transit to station and 2 days transit back to WHOI (4 total) = 25 op days.