Ship: |
Atlantis |
Schedule Status: |
Final |
Schedule ID: |
11597 |
Schedule Year: |
2012 |
Schedule Name: |
Atlantis 2012 Final |
Notes: |
Jan 15 Made Final. 11/5: Scheduled Transit to shipyard Nov 5 - 8 and dry dock period Nov 8 - Dec 31 2012. 8/15: Changed Armstrong Departure to Aug 15 and arrival Sept 10. Still 27 op days. 8/10/12: Added NAVY INSURV inspection Oct 22 - 26, Woods Hole Ma. 7/25/12: Removed "Hickey" Alvin Eng Sea Trial. Added 7 days to Forbes / Armstrong cruise. Changed Dep. to Aug 14 and arrival port to Woods Hole Sept 9. 7/9/12: Added 2 days onto this transit for NOAA Dart buoy service on buoy #41424 @ 32.922N, 72.466W . New ETA Aug 9 into WHOI. 6/19/12: Added NOAA/Canada joint collaboration cruise Aug 11 - 31, plus 8 day transit from Barbados to WHOI. Total of 29 days added. Boston still being used as a place holder until a shipyard is chosen for A Frame Modification in September. 6/11/12: May 28 Sea Trial for Traction / Markey winch. Used 1 mob day from Van Dover (NSF/OCE/BIO). Van Dover cruise end 1 day early June 17. D. Smith begin 1 day early June 21. 2/3/12: Removed German Alvin Sci Verification cruise. Shifted Hickey to Dec 1. Added Debbie Smith cruise June 22 - * 20 days total . Shifted Yager to July 12 sailing. Shifted Swift mid cruise port stop to April 17 - 19 in Barbados. 12/21/11: a} Added 2 days to Feb transit to WHOI for multibeam training (Konsburg). b} Added Yager cruise June 23 - July 9. c} Boston added as port place holder for A Frame work. d} Shifted A Frame modifications to July 19 - Sep 16. e} Added Oct 1 dock trails. f} Shifted Hickey / Alvin Engineering sea trials to Nov 1. 10/27/11: Transit days from Barbados to US east coast port (7) now NON OP days (per nsf). Added maintenance periods (2) at WHOI. 10/20/11: Added 1 transit day Jan 1st & Shifted German, NSF inspection and transit PE to WHOI 3 days later. 10/17/11: Recalculated Van Dover sea days. Cruise ends June 18. 10/11/11: Updated transit dates from WHOI to Barbados. Added 1 Jason engineering dive day to Van Dover cruise. Added one mob day for Van Dover. Adjusted Transit dates Bridgetown to JAX June 21 - June 27. Added 1 demob day for Hickey. 10/4/11: Added two day NSF inspection schedule Jan 27 - 28 2012. Port Everglades to Port Everglades. 10/3/11: Published AT 2012 schedule. |
|
Operator Cruise ID: |
|
Chief Scientist: |
None |
Activity Type: |
Null |
Created By: |
Eric Benway |
|
|
Dates To Be Determined
|
Load Non-charge Days: |
0 |
Load Charge Days: |
0 |
|
Load Date: |
11/5/2012 |
Activity Days: |
0 |
Adjustment Days |
Start Date: |
11/5/2012 |
Transit Days: |
4 |
0 |
End Date: |
11/8/2012 |
Unload Charge Days: |
0 |
|
Unload Date: |
11/8/2012 |
Unload Non-charge Days: |
0 |
|
Mob Days: |
|
|
Science Days: |
|
Optimum Start Date: |
|
Transit Estimate: |
|
Earliest Start Date: |
|
Demob Days: |
|
Latest Start Date: |
|
Repeating Cruise: |
|
Dates To Avoid: |
|
Number of Repeating Cruises: |
|
Repeating Interval: |
|
Repeating Cruise Comments: |
|
Justification/Comments: |
|
|
PI |
|
Project/Purpose |
|
Agency |
|
Funding Status |
|
Op Days |
|
|
Transit to Shipyard |
|
OTHER |
|
Funded |
|
0 |
|
|
Requested Start Port: |
|
Intermediate Port(s): |
|
Requested End Port: |
|
Port Comments: |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
|
Op Area Description: |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
|
Op Area Description: |
|
|
Coastal States Requiring Clearance:
|
|
|
Foreign Clearance Required: |
|
|
Foreign Clearance Comments: |
|
|
|
Instrumentation Requested: |
|
Instrumentation Comments: |
|
Ancil Facilities Requested: |
|
Ancil Facility Comments: |
|
|
External Cruise Webpage: |
|
Cruise Notes: |
Deytens Shipyard is Atlantis dry dock location Nov 8 - mid Jan 2013. |
|