View Cruise

  Schedule Information  
Ship: Atlantis Schedule Status: Final Schedule ID: 12089
Schedule Year: 2013 Schedule Name: VERSION 10_Nov 27
Notes: 1/6/13: Final 2013 Sched.
11/27: Hickey Part II arrived Nov 19. No change in # op days.
10/25: Extended HICKEY Alvin Cert Trials Pt. II, 7 days to Nov 21. Changed Transit to CR to Nov 24 - Dec 3. G.WHEAT cruise changed to Dec 7 - Dec 23.
10/2: Extended HIckey Part II cruise (HOV Cert trials) to Nov 14. Girguis will be postponed until 2014. Changed Sievert NDSF vehicle to ROV JASON. Removed Alvin engineering dive from Sievert cruise.
7/17: (1) Added 1 day to Sept HICKEY cruise. (2) Moved Valentine 1 day to the right. (3) Filled time between VALENTINE and GIRGUIS with more HICKEY / ALVIN CERT TRIALS II. (4) Move Wheat back to Nov 30 so that demob can occur on Dec 24 crane ops.
7/15: Updated Toomey cruise end date July 8.
6/21: Shifted Alvin SVC Girguis cruise later to Oct 30 - Nov 14. Shifted Jason/Sentry mob day to Nov 17. Shifted transit to Costa Rica to Nov 18 - 27. Shift Wheat cruise to Dec 1 - 24 and Stefan Sievert cruise to Dec 29 - Jan 28 with NEW END PORT of Balboa Panama.
5/6: 1) Added 4 day Hydro Winch cruise May 3 -6 (2) Changed ETD WHOI to May 25 for transit direct to Astoria (27 days). (3) Differed Tim Crone, Kang Ding, Maurice Tivey, Norm Farr, cruise to 2014. (4) Added Jason Eng Dive to Johnson cruise (5) Shifted HICKEY Alvin Cert cruise to 8/31 - 9/16. (6) Valentine Shifts to Sept 25 - Oct 16 (7) Griguis moved to Oct 21 - Nov 5. (8) Wheat and Sievert shifted 2 weeks later (9) Added 3 days onto WHEAT cruise
2/27: Shifted P.Hickey cruise (Cert Trials) to May 1 - 25. Cancelled P.Girguis cruise (SVC Alvin). New transit Bermuda to Astoria May 28 - June 20. Operational days decrease to 244 (-30).
2/8/13: Girguis cruise, added mid cruise stop ONE day only MAY 19.
1/29/13: Added 1 Sentry Engineering dive day on Geoff Wheat cruise. Shifted Sievert one day to the right - Start Dec 1.
1/23/13: Confirmed transit dates from Charleston SC to WHOI. Jan 24 - 27.
11/8/12: Published 2013 Atlantis schedule Version #1.
  Cruise Information  
Ship Request Information
Operator Cruise ID:
Chief Scientist: Harlan P. Johnson, UW
Activity Type: At Sea for Science
Created By: Eric Benway
Compare Request:
Project Short Title: Cascadia Heat Flow
Requested Year: 2013
Requested Ship: Thomas G. Thompson  
Request Type: Primary  
Created By: Harlan P. Johnson  
Load Non-charge Days: 0
Load Charge Days: 2   Load Date: 7/29/2013
Activity Days: 25 Adjustment Days Start Date: 7/31/2013
Transit Days: 2 0 End Date: 8/26/2013
Unload Charge Days: 2   Unload Date: 8/28/2013
Unload Non-charge Days: 0
Mob Days: 2  
Science Days: 24 Optimum Start Date: 6/15/2013
Transit Estimate: 2 Earliest Start Date: 6/15/2013
Demob Days: 1 Latest Start Date: 9/19/2013
Repeating Cruise: No Dates To Avoid: Weather-dependent, acceptable window mid-June to mid-October. Not to conflict with OBSIP operations in same area. ====== This experiment would be the sole use of the vessel and the ROV during this 24-day period.
Number of Repeating Cruises: 0 Repeating Interval:
Repeating Cruise Comments:
Justification/Comments:
PI   Project/Purpose   Agency   Funding Status   Op Days
Harlan P. Johnson, UW   Cascadia Heat Flow   NSF/OCE/MGG   Funded   30
  Jason Eng Dive   NSF/OCE/IPS   Funded   1
  ROV JASON   OTHER   Pending   0
  Start Port: Astoria, OR, USA
  End Port: Astoria, OR, USA
Requested Start Port: Seattle, WA, USA
Intermediate Port(s): None
Requested End Port: Seattle, WA, USA
Port Comments: Requested start/end port Seattle, WA, or Astoria, OR
  Lat/Long Marsden Grid Navy Op Area
Beginning
NP09 map
Ending
NP09 map
 
Op Area Description: NP9
  Lat/Long Marsden Grid Navy Op Area
Beginning
Ending
 
Op Area Description: NP9
Coastal States Requiring Clearance:
Foreign Clearance Required: No
Foreign Clearance Comments:
Ancil Facilities: OSU Coring Facility (MARSSAM)
Jason
Instrumentation Requested: Dynamic Positioning
Multibeam
Instrumentation Comments: EM302 swath bathymetry system required. 3.5 kHz and 12 kHz seismic profilers, 24 Niskin bottle rosette and CTDs wiht oxygen and particle sensors.
Ancil Facilities Requested: OSU Coring Facility (MARSSAM)
Jason
Ancil Facility Comments: JASON II is required plus their instrument vans, crane, and winch. Two "elevators" are requested for transport of instrumentation to/from seafloor. OSU multi-corer is required and will be modified with thermistors mounted on one core barrel.
External Cruise Webpage:
Cruise Notes: San Fran to station = 3 days transit + 1 to transit into Astoria