Ship: |
Atlantis |
Schedule Status: |
Final |
Schedule ID: |
12660 |
Schedule Year: |
2015 |
Schedule Name: |
Final 2015 Sched (ver 10) |
Notes: |
1/7/16: Published final schedule
12/2: Moved final departure for Charleston SC to Dec 6. New ETA Charleston Sc Dec 10. 11/17: OOI leg C (Oct 27 - Nov1) added 1 day onto leg. 9/9: Shifted OOI Pioneer fall cruise dates. Oct 11 - Oct 31st, 3 legs, still 20 days total. 5/14: Added OOI Pioneer port call May 2nd. 4/27: Adjusted A.Plueddemann OOI Pioneer mid cruise port call to May 4 - May 6 (1 day earlier). Op days remain the same. 4/1/15: Changed Uwe Send OOI arrival date to March 25. 3/12:(1) Reduced April OOI Pioneer cruise by 4 days. And made only 2 legs A & B. Departure will be April 28. (2) Updated Weller 55S cruise arrival date to March 4th. 2/3/15: Adjusted early arrival for Mulholland 1/22, 2 demobe days 1/23, 1/24. 11/3: (1) Added 4 days to each OOI Pioneer April spring and October fall cruises and separated into short voyages for mid cruise port stops. (2) moved the maintenance period to May 15, 22 days. (3) Shifted JMS inspection to June 5 - 6. (4) Moved Reddy and Van Dover start dates after to June 15 and July 8. Rest of year schedule shifted to the right to end on Dec 1. 10/17: Published 2015 schedule |
|
Operator Cruise ID: |
|
Chief Scientist: |
Weller OOI Project Team, WHOI |
Activity Type: |
At Sea for Science |
Created By: |
Eric Benway |
|
|
Dates To Be Determined
|
Load Non-charge Days: |
0 |
Load Charge Days: |
3 |
|
Load Date: |
8/2/2015 |
Activity Days: |
12 |
Adjustment Days |
Start Date: |
8/5/2015 |
Transit Days: |
16 |
0 |
End Date: |
9/1/2015 |
Unload Charge Days: |
1 |
|
Unload Date: |
9/2/2015 |
Unload Non-charge Days: |
0 |
|
Mob Days: |
3 |
|
Science Days: |
12 |
Optimum Start Date: |
7/15/2015 |
Transit Estimate: |
16 |
Earliest Start Date: |
6/1/2015 |
Demob Days: |
2 |
Latest Start Date: |
8/15/2015 |
Repeating Cruise: |
Yes |
Dates To Avoid: |
seek lowest sea states and winds, June-Aug are climatologically the best |
Number of Repeating Cruises: |
7 |
Repeating Interval: |
12 months |
Repeating Cruise Comments: |
annual service required, driven by power systems and by instrument degradation (biofouling and calibration) |
Justification/Comments: |
capable, global class ship needed that can carry 4 moorings and anchors; summer months required to optimize chance of success at mooring deployments and improve safety |
|
PI |
|
Project/Purpose |
|
Agency |
|
Funding Status |
|
Op Days |
Weller OOI Project Team, WHOI |
|
OOI Irminger Sea |
|
NSF-OOI/OOI |
|
Funded |
|
29 |
Weller OOI Project Team, WHOI |
|
NON ALVIN CRUISE |
|
OTHER |
|
Pending |
|
0 |
|
|
Requested Start Port: |
Woods Hole, MA, USA |
Intermediate Port(s): |
None |
Requested End Port: |
Woods Hole, MA, USA |
Port Comments: |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Op Area Description: |
IrmingerSea |
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
|
Op Area Description: |
Irminger Sea |
|
Coastal States Requiring Clearance:
|
Greenland(A)
|
|
Foreign Clearance Required: |
Yes |
Greenland
|
Foreign Clearance Comments: |
|
|
|
Instrumentation Requested: |
Dynamic Positioning Multibeam Dredging/Coring/Large Dia. Trawl Wire
|
Instrumentation Comments: |
trawl wire against need to drag for mooring |
Ancil Facilities Requested: |
|
Ancil Facility Comments: |
Global class, rigged for mooring operations, Sea Beam desired, 7000 lb crane, dynamic positioning, 10000 lb A-frame, 100,000 deck load, trawl winch with 9000 m 9/16 inch wire, 30 berths, 30 day endurance, experience with mooring operations. |
|
External Cruise Webpage: |
|
Cruise Notes: |
1900nm up to OOI station = 8 days 565 nm from OOI station to Nuuk = 3 days 11 transit days total |
|