Ship: |
Neil Armstrong |
Schedule Status: |
Final |
Schedule ID: |
13054 |
Schedule Year: |
2016 |
Schedule Name: |
Version 14 |
Notes: |
11/4: Charleston nominated for drydock. Amended transit time. 10/20: 9 Oct was a charged weather day and 17 Oct a special charged demobe day due to extended gap between legs 1 & 2 per agreement with OOI 18 Oct 2016. 10/3: SVC VII Cancelled 8/16: Shifted OOI Pioneer 4 days earlier to start 9/27. 8/3/16: G. Tupper OOI Irminger early arrival Reykjavik July 26. 6/1: OOI Pioneer arrival one day early. No change in charge days. 5/31: Added 1 SVC days for SVC VI - Lawson and 2 SVC days for SVC VIII (tbd). 4/13: Updated departure for SVC III to April 2 - April 6. and changed Ch Sci to Y.T. Lin 3/2/16: 1) Reconfigured OOI Pioneer spring cruise legs. (2) Swapped number of sea days for SVC V and SVC VI. (3) SVC VII Nov 4 - Nov 14. Added Ch Scientists to SVC V & VI. 2/12/16: 1) Changed SVC V to June 10 - 16. (2) Changed SVC VI to June 20 - 24. (3) Shifted OOI Irminger back to June 30 - July 28. (4) Shifted Pickart / OSNAP back to Aug 3 to Sept 8. 2/9/16: Moved DC port call to November. Added Norfolk Va port call ending SVC II. SVC IV moved after UNOLS inspection. Added 1 sci day to SVC IV. Added non op transit to warranty shipyard / period into 2017. We have 12 shakedown days not used or rescheduled yet 2/9/16). 1/27: 1) Feb 9 - 17 is now NAVY/WHOI acceptance trials - Non Op. 2)Removed "Shakedown 3". Shakedown 2 is now for AUTEC. 3) Added Washingont D.C. (Alexandria VA) port call March 29 - 31 4) Shifted SVC III to April 4/2 - 4/7. 5) SVC IV moved after UNOLS inspection w/ ROV component testing 6) OOI "Pioneer 6" moved to May 13 - June 7 (3 legs). 7) OOI Irminger Sea moved to July 8 - Aug 5 8) ONSAP/Pickart moved to Aug 11 -Sept 16. 9) OOI "Pioneer 7" moved earlier to Oct 10 - Oct 23 (3 legs). 10) Added SVC VIII from old shakedown 2 that was taken up by acceptance trials. 1/5/16: 1) Added AUTEC range into Shakedown 2 2) Scheduled March 27-31 Washington DC port call. 3) Swapped Maintenance period ahead of NSF/NAVSEA/UNOLS inspection 4) SVC IV after inspection w/ ROV test prior to funded OOI cruise 12/22: Corrected SVC III to 10 charge days (not 9). Corrected OOI May 7 - 16 charge days to 10 (not 8). 12/9/15: Removed 2015 portion. 10/8: San Fransisco departure moved ahead 1 day to Nov 10, 2015. 2016 Operating days 204. 9/23/15: Published schedule - Charleston SC used as a placeholder only. Location for Phase III yard TBD. |
|
Operator Cruise ID: |
|
Chief Scientist: |
None /transit, NoneTBD |
Activity Type: |
At Sea for Science |
Created By: |
Kerry Strom |
|
|
Dates To Be Determined
|
Load Non-charge Days: |
0 |
Load Charge Days: |
5 |
|
Load Date: |
2/19/2016 |
Activity Days: |
2 |
Adjustment Days |
Start Date: |
2/24/2016 |
Transit Days: |
5 |
0 |
End Date: |
3/1/2016 |
Unload Charge Days: |
1 |
|
Unload Date: |
3/2/2016 |
Unload Non-charge Days: |
0 |
|
Mob Days: |
|
|
Science Days: |
|
Optimum Start Date: |
|
Transit Estimate: |
|
Earliest Start Date: |
|
Demob Days: |
|
Latest Start Date: |
|
Repeating Cruise: |
|
Dates To Avoid: |
|
Number of Repeating Cruises: |
|
Repeating Interval: |
|
Repeating Cruise Comments: |
|
Justification/Comments: |
|
|
PI |
|
Project/Purpose |
|
Agency |
|
Funding Status |
|
Op Days |
|
|
Shakedown 2 |
|
NAVY/ONR |
|
Funded |
|
13 |
|
|
AUTEC RANGE |
|
OTHER |
|
Pending |
|
0 |
|
|
Requested Start Port: |
|
Intermediate Port(s): |
|
Requested End Port: |
|
Port Comments: |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Op Area Description: |
Bahamas |
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
|
Op Area Description: |
|
|
Coastal States Requiring Clearance:
|
NONE(A)
|
|
Foreign Clearance Required: |
|
|
Foreign Clearance Comments: |
|
|
|
Instrumentation Requested: |
|
Instrumentation Comments: |
|
Ancil Facilities Requested: |
|
Ancil Facility Comments: |
|
|
External Cruise Webpage: |
|
Cruise Notes: |
2/2/16: Navy scheduled Feb 27 for Armstrong.
This would be a sonar acoustic test. 2 days on site. 490nm Char to Autec range = 3 days transit (6 RT) + 2 sci = 8 days at sea
During transits the following may be tested and checked, but not limited to: Multibeam ADCP Lab van and Rad van set up. Lab set ups and flow through systems Computer systems |
|