Ship: |
Neil Armstrong |
Schedule Status: |
Final |
Schedule ID: |
13492 |
Schedule Year: |
2017 |
Schedule Name: |
FOY |
Notes: |
12/14: Arrived one day earlier d/t WX. ONR funds the lost day so day count stays the same. 11/17: Miksis-Olds cruise will depart 1 day later d/t wx, ONR kindly funding the lost day. 11/2: OOI Pioneer (Fall) Leg A, arrived a day early d/t wx, & departed a day early (Same day count) 10/3: Captain updates WHOI arrival to Oct 12th for Behn transit 9/28: Keigwin arriving a day early 9/25: Reduce the last cruise of the year, ADEON by 2 days as per the PI. 9/18: Corrected drydock departure from Feb 16th to 15th (was double billed [47-46 days]) 9/18: Also corrected Keigwin arrival departure dates as UNOLS will not accept the 2nd of Oct to be an arrival & departure day. 8/24: 6 day earlier arrival d/t good wx & operations. OOI will pay for 3 of the 6 lost days. 1 crew member/ medical evacuation. 7/25: Shift WHOI days 1 day to left 7/1: Added 1 funded day to Geyer as per email 6/28. 5/23: Add 3/25 as an operational day. 5/22: Keigwin will arrive/ depart on the same day. Transit will be 10 funded days. 5/19: 1 day added to Azores transit for magnatometer tow work. 5/17: Extra port day in 3rd leg of OOI, ONR "In Port Days" for NYC Event. 4/24: Added 3 legs to Fall OOI Pioneer, Corrected Keigwin's days from 25 to 22. 4/21: Added 2 WHOI Inst. Days before Keigwin & removed 1 day in Azores 4/5: Added 4 mobe days to Keigwin and 1 demobe in Azores for replenishment. ...Put WHOI Inst. Days to "Non-Op" ...Vessel arrived 1730/4 d/t wx, keeping operational days the same to maintain annual funded day count in schedule. 4/3: Corrected March 3 (wx day) to count, so departed 3/2 to get proper 9 days. 3/22: Depart 1 day earlier for NYC PR (5/23) 3/22: Demobe only 1 day so Geyer can depart earlier (6/23) 3/20: Becker unplanned returned to WHOI to pick up winch (3/16-17)-added a voyage/ port call (no Voyage number). 3/3: Becker departure was delayed 1 day d/t wx 2/17: Departed ship yard 2 days later than planned (was 2/15) 2/7: 2nd leg of Becker changed from March 16th to the 17th. 2/2: Split out OOI legs as per email 2/2 1/27: Added a 4th leg to Becker 1/23: OOI Pioneer (Fall) keep Oct.22-Nov.11. 1/23: Add Newport, RI pitstop to Becker (3/16) 1/18: Remove SVC coring from Keigwin until further notice. 1/9: Geyer asks to deduct 1 science day d/t vessel traffic holiday weekend. Left 4th of July open at WHOI. 1/5: Agreed to shorten the PR event by 2 days 11/7: SVC7 for coring will be done at the front of the Keigwin voyage. 11/3: Savidge and Geyer need to go back to original schedule due to personnel/ vsl traffic respectively. 10/25: PR Event after Becker, VanMooy & Savidge... 10/24: Coring arm install, SVC, WHOI Days, PR 9/01: SVC7 2016 pushed into 2017 (Coring), maybe during WHOI institutional days in Block Isl. Sound w/ Donnelly & Kegwin...TBD 8/30: Savidge transit removed 2017 schedule adjusted for 10 knots as per Port Ops. Becker is a 3 ship operation. Armstrong + Endeavor + Sharp. March 31st was the agreed start date in March 2016 scheduling meeting.
Adjusted Navy dates 6/23 (Jon's email 6/23)
7/25: A. Bower & Saito deleted d/t denied funding |
|
Operator Cruise ID: |
|
Chief Scientist: |
Kyle M. Becker, ONR |
Activity Type: |
At Sea for Science |
Created By: |
Kerry Strom |
|
|
Dates To Be Determined
|
Load Non-charge Days: |
6 |
Load Charge Days: |
0 |
|
Load Date: |
11/14/2017 |
Activity Days: |
21 |
Adjustment Days |
Start Date: |
11/20/2017 |
Transit Days: |
4 |
0 |
End Date: |
12/14/2017 |
Unload Charge Days: |
0 |
|
Unload Date: |
12/16/2017 |
Unload Non-charge Days: |
2 |
|
Mob Days: |
5 |
|
Science Days: |
25 |
Optimum Start Date: |
9/1/2017 |
Transit Estimate: |
10 |
Earliest Start Date: |
8/1/2017 |
Demob Days: |
2 |
Latest Start Date: |
12/1/2017 |
Repeating Cruise: |
Yes |
Dates To Avoid: |
n/a |
Number of Repeating Cruises: |
4 |
Repeating Interval: |
6 months |
Repeating Cruise Comments: |
This request is to deploy moorings. It is anticipated they moorings will need to be revisited for servicing every 3 months by a combination of NOAA and/or UNOLS ships. It may not be R/V Armstrong. |
Justification/Comments: |
Need a large ship for initial mooring deployments. |
|
PI |
|
Project/Purpose |
|
Agency |
|
Funding Status |
|
Op Days |
Jennifer Miksis-Olds, UNH |
|
ADEON |
|
NAVY/ONR |
|
Funded |
|
27 |
|
|
Requested Start Port: |
Charleston, SC, USA |
Intermediate Port(s): |
None, |
Requested End Port: |
Charleston, SC, USA |
Port Comments: |
selected as central to experiment site. not a requirement |
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
35.517° N
/
74.363° W
map
35° 31.02' N
/
74° 21.78' W
map
|
|
|
Ending
|
32° 55.2' N
/
75° 24.3' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Op Area Description: |
OCS - Atlantic |
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
35.517° N
/
74.363° W
map
35° 31.02' N
/
74° 21.78' W
map
|
|
|
Ending
|
32° 55.2' N
/
75° 24.3' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Op Area Description: |
OCS - Atlantic |
|
Coastal States Requiring Clearance:
|
NONE(T)
|
|
Foreign Clearance Required: |
No |
|
Foreign Clearance Comments: |
n/a |
|
|
Instrumentation Requested: |
Dynamic Positioning
|
Instrumentation Comments: |
TBD |
Ancil Facilities Requested: |
|
Ancil Facility Comments: |
TBD |
|
External Cruise Webpage: |
|
Cruise Notes: |
12/14: Arrived 1 day earlier d/t WX. ONR funds the lost day so the days count stays the same. 11/17: "The science party on Armstrong decided to delay sailing from Sunday to Monday 20 Nov at 1130 to avoid some weather. Tim has graciously agreed to keep Sunday 19 Nov as a paid day in port at WHOI so the number of paid days on Armstrong will remain the same. " |
|