Ship: |
Atlantis |
Schedule Status: |
Final |
Schedule ID: |
13726 |
Schedule Year: |
2018 |
Schedule Name: |
Version 13 |
Notes: |
11/19: Atlantis arrived 1 day early to San Diego (19th instead of the 20th) will use the extra day for demobe. 11/16: 1 day early departure d/t berth availability 11/8: Departed for Guaymas on the 7th instead of the 8th to make up for transit mistake (7 days were allocated when 8 were needed). 11/1: 1 day later arrival into Puntarenas (Oct 14th), 1 day added to NSF-OCE-BIO" on the transit and 1 day removed from the same on the load. 10/8: Departing San Juan 1 day later d/t thruster issue. ETA Costa Rica holding. (In port charged 1 more day to BIO, removed 1 transit day from BIO (breakeven). 8/8: "Alvin/LARS NAVSEA Survey has been officially rescheduled from July 2018 to the week of 07 January 2019 (in the shipyard)." 5/15: Take 1 of Cordes' mobe days & Sentry's eng dive days (to MGG) over to San Juan for 2 additional PREmobe days for PAC cruises. Added 1 outreach days in San Diego. Hopefully will get to San Diego in time for the Outreach event. 3/22: Gregg cruise awarded 1 more day for Alvin dives. 1/12: Return from OOI AB Jan 20th (not the 21st) Made Jan 24th a load day for the deadhead transit until we know what happens in Monte w/ the USCG inspection. 1/8: Departed Monte 2 days early. Hope to catch USCG inspection on the 21st. 12/20: Navy releases AT from search/ demobe on Jan 1st. 3 day shift to the right. 12/14: Additional delay w/ Sub Search 11/30: Koppers deferred OOI AB back on after CURV ops 11/22: Gregg funded 3 additional days and dmobe in San Diego, ADDED 1 more day of transit to get to 9N (Station 2). 10/13: Adams cruise will be planned as 15 days until the 5 remaining days are funded to make it 20. 9/26: Lyle requests 2 mobe days instead of the 1 originally requested on STR. 9/14: Add Sentry 3 Eng Dives to Alvin Cruise, minus 1 day from Kurz, + 1 day to Cordes 9/8: End Hutchins in San Juan 5 days total in port for demobe/ mobe Behrenfeld 8/30: No deadhead to WHOI $ 9/5: Shift Koppers 3 days to the left for the OOI AB -3 days. 7/28: Eason "W" (34 days) 7/17: Demobe Lang in PR to save on deadhead transit (3 days overall savings) 6/30: Moved Lang to the left 1 week to get Jason 2 weeks to transit from Bermuda to WA (Tivey on Ride) 5/31: Orcutt w/ Jason on Ride 4/6: Need to add time at WHOI for ABS and in Astoria for Navsea??? 4/3: End Hutchins in Barbados 2/21: June NAVSEA Ext. Cert. Survey (5 days) WHOI 2/20: Hutchin's IN/ Saito & Hodgekiss OUT (Armstrong) 1/31: Corrected Johns voyage from 2015-18 -Cordes wants his 2017 cruise 14 months before the 2018 cruise. 12/29: S. Lang Cayman DECLINED, Karson & Wanless "W" |
|
Operator Cruise ID: |
AT42-06 |
Chief Scientist: |
Patricia Gregg, UIUC |
Activity Type: |
At Sea for Science |
Created By: |
Kerry Strom |
|
|
Dates To Be Determined
|
Load Non-charge Days: |
0 |
Load Charge Days: |
2 |
|
Load Date: |
12/1/2018 |
Activity Days: |
8 |
Adjustment Days |
Start Date: |
12/3/2018 |
Transit Days: |
9 |
0 |
End Date: |
12/19/2018 |
Unload Charge Days: |
2 |
|
Unload Date: |
12/21/2018 |
Unload Non-charge Days: |
0 |
|
Mob Days: |
2 |
|
Science Days: |
4 |
Optimum Start Date: |
1/1/2018 |
Transit Estimate: |
3 |
Earliest Start Date: |
1/1/2018 |
Demob Days: |
1 |
Latest Start Date: |
6/1/2017 |
Repeating Cruise: |
No |
Dates To Avoid: |
June - October is hurricane season. |
Number of Repeating Cruises: |
0 |
Repeating Interval: |
|
Repeating Cruise Comments: |
n/a |
Justification/Comments: |
n/a |
|
PI |
|
Project/Purpose |
|
Agency |
|
Funding Status |
|
Op Days |
Patricia Gregg, UIUC |
|
OASIS |
|
NSF/OCE/MGG |
|
Funded |
|
11 |
Patricia Gregg, UIUC |
|
EPR ECS Cruise |
|
NSF/OCE/IPS |
|
Funded |
|
10 |
|
|
Alvin/ Sentry |
|
OTHER |
|
Funded |
|
0 |
|
|
Requested Start Port: |
Manzanillo, Mexico |
Intermediate Port(s): |
None |
Requested End Port: |
Manzanillo, Mexico |
Port Comments: |
Manzanillo, Mexico is the closest port and will minimize transit time. |
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Op Area Description: |
8 20N EPR |
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Op Area Description: |
8°20'N Seamount |
|
Coastal States Requiring Clearance:
|
NONE(T)
|
|
Foreign Clearance Required: |
No |
|
Foreign Clearance Comments: |
n/a |
|
|
Instrumentation Requested: |
Multibeam Dredging/Coring/Large Dia. Trawl Wire SCUBA Diving
|
Instrumentation Comments: |
We will have 4 Alvin Dives, 8 dredges, and fill in the remaining multibeam for our survey area. |
Ancil Facilities Requested: |
Sentry Alvin
|
Ancil Facility Comments: |
n/a |
|
External Cruise Webpage: |
|
Cruise Notes: |
11/13 email: 9° 50N for 4 days of work following the Gregg et al. 8° 20'N seamount dives, and then transiting directly to San Diego Manz to 1st station = 3 days Last station to San Diego is 1575nm/ 11/ 24 = 6 days |
|