Ship: |
Neil Armstrong |
Schedule Status: |
Final |
Schedule ID: |
13727 |
Schedule Year: |
2018 |
Schedule Name: |
Version 16 |
Notes: |
11/28: Arrives 1 day early for Savidge d/t bad wx (was 11/29) 11/17: Departs 1 day later for Savidge d/t bad wx (was 11/16) 10/27-28: Pioneer Pit stop to pick up critical spare parts for science mission 10/24: Vessel returned from 1st Pioneer leg 1 day later d/t wx 10/19: Deadhead allocation correction from Iceland to WHOI (from Global to Ocean class policy) 10/15: Arrive WHOI 1 day late d/t wx. Removed 1 of the 3 demobe days to compensate for delayed arrival. 1 day added to OOI account on the transit. 1 day added to the overall schedule (248 to 249). 10/2: Armstrong's Pickart cruise returns a day earlier. 9/4: Hodgkiss returns 2 days earlier (day count stays the same) 8/1: Vsl arrives Reykjavik 1 day earlier d/t wx 7/25: Fall Pioneer legs updated 5/15: 1 day late in Reykjavik d/t wx 4/6: Main crane failure, emergency port stop 4/ 6th-8th. 2/12: 1 day shift to the left starting on Spring Pioneer to add 1 day into deadhead transit up to Reykjavik/ Removed 1 day from the 4 day demobe at WHOI after the deadhead transit from Reykjavik (scheduling oversight). Remove March WHOI Inst Days place holder. Changed 57 days alongside to "Laydays" not "Available" Add 3 days before PEACH for WHOI Inst Days. 1/6: Non-paid day at sea for maintenance and testing on Jan 24th. Jan 23rd USCG COI 12/15: MacKinnon (Harper) will use 2 days at WHOI to mobe before transit 11/25: Spring Pioneer in 2 legs 11/22: Shift deadhead from WHOI 1 day to the left...Give Hodgkiss 1 more mobe day & adjust spring OOI into 2 legs (not 3). 11/13: INSURV scheduled for week of 12/17/18 10/4: ONR granted 4 additional days of funding to accommodate Hodgkiss swap 9/15: Shifted everything fm MacKinnon 2 days to the right to give the ship 5 days prep at WHOI 9/7: Thanksgiving 2018 is Nov. 22nd 8/30: Peters not funded 6/28: Evans & Garwakawicz "W" 6/27: Martens & Duda "W" 6/16: Send not funded 6/13: Mak Saito on Atlantic Explorer? (Clio already in Bermuda) 6/13: Lyle changed his STR to a 1 month later start date (Endeavor or AE?) 6/13: Bucklin "W" D'Hont, Miksis-Olds & Toole on Endeavor 6/2: Johns & Bower updated STR's 4/3: Toole deferring his spring mission to 2019 (not ready) 3/27: Updated OOI Pioneer & Irminger science days 3/2: Toole may have to go on Atlantic Explorer/ Endeavor. He may delay 1st of 2 voyages TBD. 2/20: Hutchin's OUT (on Atlantis)/ Saito & Hodgekiss IN 2/1: Hutchins in, half of Herbert in (remainder on Endeavor), Savidge out (2 voyages), Miksis out (1 of 2 voyages), D'Hont Out...SAVIDGE #1 back in |
|
Operator Cruise ID: |
AR33 |
Chief Scientist: |
Harvey Seim, UNC_CH |
Activity Type: |
At Sea for Science |
Created By: |
Kerry Strom |
|
|
Dates To Be Determined
|
Load Non-charge Days: |
2 |
Load Charge Days: |
0 |
|
Load Date: |
11/15/2018 |
Activity Days: |
7 |
Adjustment Days |
Start Date: |
11/17/2018 |
Transit Days: |
5 |
0 |
End Date: |
11/28/2018 |
Unload Charge Days: |
0 |
|
Unload Date: |
11/29/2018 |
Unload Non-charge Days: |
1 |
|
Mob Days: |
1 |
|
Science Days: |
9 |
Optimum Start Date: |
10/15/2018 |
Transit Estimate: |
0 |
Earliest Start Date: |
10/10/2018 |
Demob Days: |
0 |
Latest Start Date: |
10/20/2018 |
Repeating Cruise: |
No |
Dates To Avoid: |
Can't go much earlier because we wish to wait until after the fall transition in September, and can't go much later because instruments will be programmed for 9 month deployments. |
Number of Repeating Cruises: |
0 |
Repeating Interval: |
|
Repeating Cruise Comments: |
|
Justification/Comments: |
|
|
PI |
|
Project/Purpose |
|
Agency |
|
Funding Status |
|
Op Days |
Dana K. Savidge, Skidaway |
|
PEACH |
|
NSF/OCE/PO |
|
Funded |
|
14 |
|
|
Requested Start Port: |
Norfolk, VA, USA |
Intermediate Port(s): |
None |
Requested End Port: |
Norfolk, VA, USA |
Port Comments: |
Norfolk is nearest major port, easy access for science parties from North Carolina and Massachusetts, colleagues at ODU are available to provide local logistical support. With the number and size of moored instruments to be retrieved, it may be necessary to visit Norfolk once during the cruise to offload before recovering the remaining deployments. |
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Op Area Description: |
Hatteras |
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Op Area Description: |
Hatteras |
|
Coastal States Requiring Clearance:
|
NONE(T)
|
|
Foreign Clearance Required: |
No |
|
Foreign Clearance Comments: |
|
|
|
Instrumentation Requested: |
Dynamic Positioning ADCP
|
Instrumentation Comments: |
Total deck or lab space needed to gear to be retrieved and re-deployed is approximately 55m^2 plus free space to retrieve with A-frame. |
Ancil Facilities Requested: |
|
Ancil Facility Comments: |
|
|
External Cruise Webpage: |
|
Cruise Notes: |
1 day later departure d/t bad wx. No change in charge days. Vessel came in 1 day early d/t bad wx. No change in charge days. |
|