Ship: |
Neil Armstrong |
Schedule Status: |
Final |
Schedule ID: |
13727 |
Schedule Year: |
2018 |
Schedule Name: |
Version 16 |
Notes: |
11/28: Arrives 1 day early for Savidge d/t bad wx (was 11/29) 11/17: Departs 1 day later for Savidge d/t bad wx (was 11/16) 10/27-28: Pioneer Pit stop to pick up critical spare parts for science mission 10/24: Vessel returned from 1st Pioneer leg 1 day later d/t wx 10/19: Deadhead allocation correction from Iceland to WHOI (from Global to Ocean class policy) 10/15: Arrive WHOI 1 day late d/t wx. Removed 1 of the 3 demobe days to compensate for delayed arrival. 1 day added to OOI account on the transit. 1 day added to the overall schedule (248 to 249). 10/2: Armstrong's Pickart cruise returns a day earlier. 9/4: Hodgkiss returns 2 days earlier (day count stays the same) 8/1: Vsl arrives Reykjavik 1 day earlier d/t wx 7/25: Fall Pioneer legs updated 5/15: 1 day late in Reykjavik d/t wx 4/6: Main crane failure, emergency port stop 4/ 6th-8th. 2/12: 1 day shift to the left starting on Spring Pioneer to add 1 day into deadhead transit up to Reykjavik/ Removed 1 day from the 4 day demobe at WHOI after the deadhead transit from Reykjavik (scheduling oversight). Remove March WHOI Inst Days place holder. Changed 57 days alongside to "Laydays" not "Available" Add 3 days before PEACH for WHOI Inst Days. 1/6: Non-paid day at sea for maintenance and testing on Jan 24th. Jan 23rd USCG COI 12/15: MacKinnon (Harper) will use 2 days at WHOI to mobe before transit 11/25: Spring Pioneer in 2 legs 11/22: Shift deadhead from WHOI 1 day to the left...Give Hodgkiss 1 more mobe day & adjust spring OOI into 2 legs (not 3). 11/13: INSURV scheduled for week of 12/17/18 10/4: ONR granted 4 additional days of funding to accommodate Hodgkiss swap 9/15: Shifted everything fm MacKinnon 2 days to the right to give the ship 5 days prep at WHOI 9/7: Thanksgiving 2018 is Nov. 22nd 8/30: Peters not funded 6/28: Evans & Garwakawicz "W" 6/27: Martens & Duda "W" 6/16: Send not funded 6/13: Mak Saito on Atlantic Explorer? (Clio already in Bermuda) 6/13: Lyle changed his STR to a 1 month later start date (Endeavor or AE?) 6/13: Bucklin "W" D'Hont, Miksis-Olds & Toole on Endeavor 6/2: Johns & Bower updated STR's 4/3: Toole deferring his spring mission to 2019 (not ready) 3/27: Updated OOI Pioneer & Irminger science days 3/2: Toole may have to go on Atlantic Explorer/ Endeavor. He may delay 1st of 2 voyages TBD. 2/20: Hutchin's OUT (on Atlantis)/ Saito & Hodgekiss IN 2/1: Hutchins in, half of Herbert in (remainder on Endeavor), Savidge out (2 voyages), Miksis out (1 of 2 voyages), D'Hont Out...SAVIDGE #1 back in |
|
Operator Cruise ID: |
AR31-C |
Chief Scientist: |
Al Plueddemann, WHOI |
Activity Type: |
At Sea for Science |
Created By: |
Kerry Strom |
|
|
Dates To Be Determined
|
Load Non-charge Days: |
0 |
Load Charge Days: |
0 |
|
Load Date: |
11/1/2018 |
Activity Days: |
10 |
Adjustment Days |
Start Date: |
11/1/2018 |
Transit Days: |
0 |
0 |
End Date: |
11/10/2018 |
Unload Charge Days: |
0 |
|
Unload Date: |
11/11/2018 |
Unload Non-charge Days: |
1 |
|
Mob Days: |
2 |
|
Science Days: |
21 |
Optimum Start Date: |
9/15/2018 |
Transit Estimate: |
2 |
Earliest Start Date: |
9/1/2018 |
Demob Days: |
1 |
Latest Start Date: |
9/26/2018 |
Repeating Cruise: |
Yes |
Dates To Avoid: |
Mooring servicing in spring and fall, timed for weather and biofouling cycle |
Number of Repeating Cruises: |
16 |
Repeating Interval: |
every 6 months |
Repeating Cruise Comments: |
Recover, redeploy, refresh power systems and sensors every 6 months. |
Justification/Comments: |
Spring and fall cruises to meet requirement to refresh power and sensors every 6 months, deal with biofouling. Deck payload when deploying and servicing moorings requires large UNOLS vessel, such as Knorr. |
|
PI |
|
Project/Purpose |
|
Agency |
|
Funding Status |
|
Op Days |
Al Plueddemann, WHOI |
|
OOI Pioneer |
|
NSF-OOI/OOI |
|
Funded |
|
10 |
|
|
Requested Start Port: |
Woods Hole, MA, USA |
Intermediate Port(s): |
None |
Requested End Port: |
Woods Hole, MA, USA |
Port Comments: |
WHOI is OOI CGSN Homeport facility |
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Op Area Description: |
NE shelf |
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Op Area Description: |
NE shelf |
|
Coastal States Requiring Clearance:
|
NONE(T)
|
|
Foreign Clearance Required: |
No |
|
Foreign Clearance Comments: |
none required |
|
|
Instrumentation Requested: |
Dynamic Positioning Multibeam Dredging/Coring/Large Dia. Trawl Wire
|
Instrumentation Comments: |
Trawl in case of ned to drag for moorings. |
Ancil Facilities Requested: |
|
Ancil Facility Comments: |
Intermediate vessel with dynamic positioning, crane rated to 7000 lbs, A-frame to 10 tons. 1200 sq ft working deck area; 60,000 lb ship deck load; 9,000 m 9/16 th trawl wire, 12 days endurance, experience with mooring operations. |
|
External Cruise Webpage: |
|
Cruise Notes: |
|
|