Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 16 Feb 2007 |
Dep: | 17 Feb 2007 |
Arr: | 20 Feb 2007 |
Unload: | 21 Feb 2007 |
|
|
|
|
|
|
|
|
K. Eric Wommack
|
|
4/4
|
|
|
|
Notes: CF cruise from 2006. Winter cruise in 2006 shortened due to ice in upper Chesapeake. PI requests days from Nov '06 be used in Feb '07. Funds for 5 days at '06 rate carried forward - only 4 days scheduled at higher projected '07 rate. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 21 Feb 2007 |
Dep: | 21 Feb 2007 |
Arr: | 21 Feb 2007 |
Unload: | 21 Feb 2007 |
|
|
|
|
|
|
|
|
|
|
1/1
|
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
de-Mob/Mob
|
|
Not Specified
|
1/NSF-OCE-EDU/F
|
|
|
Notes: Demob Wommack, Mob Houde |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 22 Feb 2007 |
Dep: | 22 Feb 2007 |
Arr: | 22 Feb 2007 |
Unload: | 22 Feb 2007 |
|
|
|
|
|
|
|
|
K. Eric Wommack
|
|
0/0
|
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Notes: Waiting alongside for ice to clear in Choptank River |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 21 Feb 2007 |
Dep: | 23 Feb 2007 |
Arr: | 26 Feb 2007 |
Unload: | 26 Feb 2007 |
|
|
|
|
Chesapeake Bay/ |
NA09 |
NA09 |
|
|
|
|
|
Edward D. Houde
|
|
4/4
|
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 27 Feb 2007 |
Dep: | 27 Feb 2007 |
Arr: | 27 Feb 2007 |
Unload: | 27 Feb 2007 |
|
|
|
|
|
|
|
|
Transit
|
|
1/1
|
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Not Specified
|
1/NSF-OCE-EDU/F
|
|
|
Notes: Demob and Transit |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 20 Mar 2007 |
Dep: | 21 Mar 2007 |
Arr: | 22 Mar 2007 |
Unload: | 22 Mar 2007 |
|
|
|
|
|
|
|
|
|
|
2/3
|
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 23 Mar 2007 |
Dep: | 23 Mar 2007 |
Arr: | 24 Mar 2007 |
Unload: | 25 Mar 2007 |
|
|
|
|
|
|
|
|
Christopher Sommerfield
|
|
2/3
|
|
|
|
Notes: Combined with Sharp cruise for efficiency per PI request |
|
|
|
|
|
WARNING: This cruise is currently associated with at least one request that has been withdrawn.
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 03 Apr 2007 |
Dep: | 04 Apr 2007 |
Arr: | 04 Apr 2007 |
Unload: | 05 Apr 2007 |
|
|
|
|
|
|
|
|
Mohsen Badiey
|
|
1/1
|
|
|
|
Notes: DBOS & AUV ops |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 08 Apr 2007 |
Dep: | 08 Apr 2007 |
Arr: | 08 Apr 2007 |
Unload: | 08 Apr 2007 |
|
|
|
|
|
|
|
|
|
|
1/1
|
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Not Specified
|
1/NSF-OCE-EDU/F
|
|
|
Notes: Transit and Mob |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 08 Apr 2007 |
Dep: | 09 Apr 2007 |
Arr: | 15 Apr 2007 |
Unload: | 16 Apr 2007 |
|
|
|
|
Chesapeake Bay/ |
NA09 |
NA09 |
|
|
|
|
|
Edward D. Houde
|
|
7/9
|
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 16 Apr 2007 |
Dep: | 16 Apr 2007 |
Arr: | 16 Apr 2007 |
Unload: | 16 Apr 2007 |
|
|
|
|
|
|
|
|
|
|
1/1
|
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Not Specified
|
1/NSF-OCE-EDU/F
|
|
|
Notes: Demob and Transit |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 17 Apr 2007 |
Dep: | 18 Apr 2007 |
Arr: | 19 Apr 2007 |
Unload: | 19 Apr 2007 |
|
|
|
|
|
|
|
|
Kuo Wong
|
|
2/3
|
|
|
|
Notes: Scanfish Req'd |
|
|
|
|
|
WARNING: This cruise is currently associated with at least one request that has been withdrawn.
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 20 Apr 2007 |
Dep: | 20 Apr 2007 |
Arr: | 20 Apr 2007 |
Unload: | 21 Apr 2007 |
|
|
|
|
|
|
|
|
Mohsen Badiey
|
|
1/2
|
|
|
|
Notes: DBOS & AUV ops |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 28 Apr 2007 |
Dep: | 29 Apr 2007 |
Arr: | 29 Apr 2007 |
Unload: | 30 Apr 2007 |
|
|
|
|
|
|
|
|
George W. Luther
|
|
1/1
|
|
|
|
Notes: DBOS buoy deployment. Buoy damaged on '07 due to tropical storm. PI requests days from '06 be used in '07 for buoy deployment. Funds for 3 days at '06 rate carried forward - only 2 days scheduled at higher '07 rate. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 02 May 2007 |
Dep: | 03 May 2007 |
Arr: | 05 May 2007 |
Unload: | 06 May 2007 |
|
|
|
|
|
|
|
|
David L. Kirchman
|
|
3/3
|
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 07 May 2007 |
Dep: | 07 May 2007 |
Arr: | 07 May 2007 |
Unload: | 07 May 2007 |
|
|
|
|
|
|
|
|
|
|
1/1
|
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Not Specified
|
1/NSF-OCE-EDU/F
|
|
|
Notes: Transit and Mob |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 07 May 2007 |
Dep: | 08 May 2007 |
Arr: | 14 May 2007 |
Unload: | 14 May 2007 |
|
|
|
|
Chesapeake Bay/ |
NA09 |
NA09 |
|
|
|
|
|
Edward D. Houde
|
|
7/7
|
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 15 May 2007 |
Dep: | 15 May 2007 |
Arr: | 15 May 2007 |
Unload: | 15 May 2007 |
|
|
|
|
|
|
|
|
|
|
1/1
|
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Not Specified
|
1/NSF-OCE-EDU/F
|
|
|
Notes: Demob Houde late on 14th. Mob Shaw - Load cold van and other equipment. Depart for first station as soon as able (~1300). |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 15 May 2007 |
Dep: | 16 May 2007 |
Arr: | 19 May 2007 |
Unload: | 19 May 2007 |
|
|
|
|
|
|
|
|
Timothy J. Shaw
|
|
4/4
|
Clearances: Bahamas(T) |
|
|
|
Notes: HATTERAS' SOUTAR corer required. Cold van. Demob late on 19th to maximize science time on station. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 20 May 2007 |
Dep: | 20 May 2007 |
Arr: | 20 May 2007 |
Unload: | 20 May 2007 |
|
|
|
|
|
|
|
|
|
|
1/1
|
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Not Specified
|
1/NSF-OCE-EDU/F
|
|
|
Notes: Offload Shaw. Ship cold van to CAPE HATTERAS. Depart for Woods Hole as soon as able. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 21 May 2007 |
Dep: | 21 May 2007 |
Arr: | 22 May 2007 |
Unload: | 22 May 2007 |
|
|
|
|
|
|
|
|
|
|
2/2
|
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Not Specified
|
2/NAVY-ONR/F
|
|
|
Notes: Transit |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 23 May 2007 |
Dep: | 23 May 2007 |
Arr: | 31 May 2007 |
Unload: | 31 May 2007 |
|
|
|
|
|
|
|
|
Glen Gawarkiewicz
|
|
9/9
|
|
|
|
Notes: Scanfish Req'd. AUV's |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 01 Jun 2007 |
Dep: | 01 Jun 2007 |
Arr: | 02 Jun 2007 |
Unload: | 02 Jun 2007 |
|
|
|
|
|
|
|
|
|
|
2/2
|
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Not Specified
|
2/NAVY-ONR/F
|
|
|
Notes: Transit |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 07 Jun 2007 |
Dep: | 08 Jun 2007 |
Arr: | 08 Jun 2007 |
Unload: | 09 Jun 2007 |
|
|
|
|
|
|
|
|
George W. Luther
|
|
1/1
|
|
|
|
Notes: DBOS buoy deployment. Buoy damaged on '07 due to tropical storm. PI requests days from '06 be used in '07 for buoy deployment. Funds for 3 days at '06 rate carried forward - only 2 days scheduled at higher '07 rate. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 12 Jun 2007 |
Dep: | 13 Jun 2007 |
Arr: | 14 Jun 2007 |
Unload: | 15 Jun 2007 |
|
|
|
|
|
|
|
|
John H. Weingart
|
|
2/2
|
|
|
|
Notes: Target deployments. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 22 Jun 2007 |
Dep: | 23 Jun 2007 |
Arr: | 10 Jul 2007 |
Unload: | 11 Jul 2007 |
|
|
|
|
|
|
|
|
Kelly Benoit-Bird
|
|
18/18
|
|
|
|
Notes: Fisheries acoustics and AUV |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 14 Jul 2007 |
Dep: | 14 Jul 2007 |
Arr: | 14 Jul 2007 |
Unload: | 14 Jul 2007 |
|
|
|
|
|
|
|
|
|
|
1/1
|
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Not Specified
|
1/NSF-OCE-EDU/F
|
|
|
Notes: Transit and Mob |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 15 Jul 2007 |
Dep: | 15 Jul 2007 |
Arr: | 19 Jul 2007 |
Unload: | 19 Jul 2007 |
|
|
|
|
|
|
|
|
Alison Buchan
|
|
5/5
|
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 20 Jul 2007 |
Dep: | 20 Jul 2007 |
Arr: | 20 Jul 2007 |
Unload: | 20 Jul 2007 |
|
|
|
|
|
|
|
|
|
|
1/1
|
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Not Specified
|
1/NSF-OCE-EDU/F
|
|
|
Notes: Demob Buchan and Transit |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 27 Jul 2007 |
Dep: | 27 Jul 2007 |
Arr: | 27 Jul 2007 |
Unload: | 27 Jul 2007 |
|
|
|
|
|
|
|
|
|
|
1/1
|
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 29 Jul 2007 |
Dep: | 30 Jul 2007 |
Arr: | 31 Jul 2007 |
Unload: | 01 Aug 2007 |
|
|
|
|
|
|
|
|
Shannon J. Williamson
|
|
2/2
|
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 11 Aug 2007 |
Dep: | 12 Aug 2007 |
Arr: | 12 Aug 2007 |
Unload: | 13 Aug 2007 |
|
|
|
|
|
|
|
|
George W. Luther
|
|
1/1
|
|
|
|
Notes: DBOS buoy recovery |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 14 Aug 2007 |
Dep: | 15 Aug 2007 |
Arr: | 28 Aug 2007 |
Unload: | 29 Aug 2007 |
|
|
|
|
|
|
|
|
Joseph Katz
|
|
14/14
|
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 03 Sep 2007 |
Dep: | 04 Sep 2007 |
Arr: | 04 Sep 2007 |
Unload: | 05 Sep 2007 |
|
|
|
|
|
|
|
|
George W. Luther
|
|
1/1
|
|
|
|
Notes: DBOS buoy deployment |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 11 Sep 2007 |
Dep: | 12 Sep 2007 |
Arr: | 12 Sep 2007 |
Unload: | 12 Sep 2007 |
|
|
|
|
|
|
|
|
Christopher Sommerfield
|
|
2/2
|
|
|
|
Notes: Combined with Sharp cruise for efficiency per PI request |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 13 Sep 2007 |
Dep: | 13 Sep 2007 |
Arr: | 14 Sep 2007 |
Unload: | 15 Sep 2007 |
|
|
|
|
|
|
|
|
|
|
2/2
|
|
|
|
Notes: Combined with Sommerfield for efficiency per PI request. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 17 Sep 2007 |
Dep: | 18 Sep 2007 |
Arr: | 20 Sep 2007 |
Unload: | 21 Sep 2007 |
|
|
|
|
|
|
|
|
John H. Weingart
|
|
3/3
|
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 22 Sep 2007 |
Dep: | 23 Sep 2007 |
Arr: | 24 Sep 2007 |
Unload: | 25 Sep 2007 |
|
|
|
|
|
|
|
|
David L. Kirchman
|
|
2/2
|
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 25 Sep 2007 |
Dep: | 25 Sep 2007 |
Arr: | 25 Sep 2007 |
Unload: | 26 Sep 2007 |
|
|
|
|
|
|
|
|
George W. Luther
|
|
1/1
|
|
|
|
Notes: DBOS buoy deployment |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 27 Sep 2007 |
Dep: | 28 Sep 2007 |
Arr: | 29 Sep 2007 |
Unload: | 30 Sep 2007 |
|
|
|
|
|
|
|
|
John H. Weingart
|
|
2/2
|
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 01 Oct 2007 |
Dep: | 01 Oct 2007 |
Arr: | 01 Oct 2007 |
Unload: | 01 Oct 2007 |
|
|
|
|
|
|
|
|
|
|
1/1
|
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Not Specified
|
1/NSF-OCE-EDU/F
|
|
|
Notes: Transit and Mob |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 01 Oct 2007 |
Dep: | 02 Oct 2007 |
Arr: | 08 Oct 2007 |
Unload: | 09 Oct 2007 |
|
|
|
|
Chesapeake Bay/ |
NA09 |
NA09 |
|
|
|
|
|
Edward D. Houde
|
|
7/7
|
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 09 Oct 2007 |
Dep: | 09 Oct 2007 |
Arr: | 09 Oct 2007 |
Unload: | 09 Oct 2007 |
|
|
|
|
|
|
|
|
|
|
1/1
|
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Not Specified
|
1/NSF-OCE-EDU/F
|
|
|
Notes: Demob Houde. Prep for Mason. Lay day in Cambridge (non-Op) on Oct 11 due to scheduling conflict in Mason group. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 10 Oct 2007 |
Dep: | 11 Oct 2007 |
Arr: | 18 Oct 2007 |
Unload: | 19 Oct 2007 |
|
|
|
|
|
|
|
|
|
|
8/8
|
|
|
|
Notes: Clean Van req'd |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 18 Oct 2007 |
Dep: | 18 Oct 2007 |
Arr: | 18 Oct 2007 |
Unload: | 18 Oct 2007 |
|
|
|
|
|
|
|
|
|
|
1/1
|
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Not Specified
|
1/NSF-OCE-EDU/F
|
|
|
Notes: Demob and Transit |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 07 Nov 2007 |
Dep: | 08 Nov 2007 |
Arr: | 08 Nov 2007 |
Unload: | 09 Nov 2007 |
|
|
|
|
|
|
|
|
George W. Luther
|
|
1/1
|
|
|
|
Notes: DBOS buoy recoveries. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 11 Nov 2007 |
Dep: | 12 Nov 2007 |
Arr: | 15 Nov 2007 |
Unload: | 16 Nov 2007 |
|
|
|
|
|
|
|
|
Elizabeth W. North
|
|
4/4
|
|
|
|
Notes: Scanfish Req'd. One day moved to December due to weather. |
|
|
|
|
|
WARNING: This cruise is currently associated with at least one request that has been withdrawn.
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 26 Nov 2007 |
Dep: | 27 Nov 2007 |
Arr: | 27 Nov 2007 |
Unload: | 27 Nov 2007 |
|
|
|
|
|
|
|
|
Mohsen Badiey
|
|
1/1
|
|
|
|
Notes: DBOS & AUV ops. Combined with Wong per PI request. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 28 Nov 2007 |
Dep: | 28 Nov 2007 |
Arr: | 28 Nov 2007 |
Unload: | 29 Nov 2007 |
|
|
|
|
|
|
|
|
Kuo Wong
|
|
1/1
|
|
|
|
Notes: Scanfish Req'd. Combined with Baidiey per PI request. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 05 Dec 2007 |
Dep: | 06 Dec 2007 |
Arr: | 06 Dec 2007 |
Unload: | 07 Dec 2007 |
|
|
|
|
|
|
|
|
Elizabeth W. North
|
|
1/1
|
|
|
|
Notes: Scanfish Req'd. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 09 Dec 2007 |
Dep: | 10 Dec 2007 |
Arr: | 10 Dec 2007 |
Unload: | 11 Dec 2007 |
|
|
|
|
|
|
|
|
George W. Luther
|
|
1/1
|
|
|
|
Notes: DBOS buoy recoveries. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 28 Dec 2007 |
Dep: | 29 Dec 2007 |
Arr: | 29 Dec 2007 |
Unload: | 30 Dec 2007 |
|
|
|
|
|
|
|
|
George W. Luther
|
|
1/1
|
|
|
|
Notes: DBOS buoy deployment. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 31 Dec 2007 |
Dep: | 31 Dec 2007 |
Arr: | 31 Dec 2007 |
Unload: | 31 Dec 2007 |
|
|
|
|
|
|
|
|
|
|
0/0
|
|
|
|
Notes: CF to 2008 |
|
|
|