View Schedule
or
schedule as:
Expanded (Text)
Condensed (Text)
Expanded (PDF)
Send schedule email to:
*
One or more invalid email addresses
Note for recipient(s):
the schedule as:
Excel XML
CSV
Google Earth Map (KML)
ICal Calendar
2018
-
Atlantis
Version 13
Final
- ID #
13726
Version #
4
-
1/7/2019
Scheduling Contact(s)
Kerry Strom
kstrom*%*%*whoi^%^%^edu
(508) 289-3938
Notes:
11/19: Atlantis arrived 1 day early to San Diego (19th instead of the 20th) will use the extra day for demobe.
11/16: 1 day early departure d/t berth availability
11/8: Departed for Guaymas on the 7th instead of the 8th to make up for transit mistake (7 days were allocated when 8 were needed).
11/1: 1 day later arrival into Puntarenas (Oct 14th), 1 day added to NSF-OCE-BIO" on the transit and 1 day removed from the same on the load.
10/8: Departing San Juan 1 day later d/t thruster issue. ETA Costa Rica holding. (In port charged 1 more day to BIO, removed 1 transit day from BIO (breakeven).
8/8: "Alvin/LARS NAVSEA Survey has been officially
rescheduled from July 2018 to the week of 07 January 2019 (in the
shipyard)."
5/15: Take 1 of Cordes' mobe days & Sentry's eng dive days (to MGG) over to San Juan for 2 additional PREmobe days for PAC cruises.
Added 1 outreach days in San Diego.
Hopefully will get to San Diego in time for the Outreach event.
3/22: Gregg cruise awarded 1 more day for Alvin dives.
1/12: Return from OOI AB Jan 20th (not the 21st)
Made Jan 24th a load day for the deadhead transit until we know what happens in Monte w/ the USCG inspection.
1/8: Departed Monte 2 days early. Hope to catch USCG inspection on the 21st.
12/20: Navy releases AT from search/ demobe on Jan 1st. 3 day shift to the right.
12/14: Additional delay w/ Sub Search
11/30: Koppers deferred OOI AB back on after CURV ops
11/22: Gregg funded 3 additional days and dmobe in San Diego, ADDED 1 more day of transit to get to 9N (Station 2).
10/13: Adams cruise will be planned as 15 days until the 5 remaining days are funded to make it 20.
9/26: Lyle requests 2 mobe days instead of the 1 originally requested on STR.
9/14: Add Sentry 3 Eng Dives to Alvin Cruise, minus 1 day from Kurz, + 1 day to Cordes
9/8: End Hutchins in San Juan 5 days total in port for demobe/ mobe Behrenfeld
8/30: No deadhead to WHOI $
9/5: Shift Koppers 3 days to the left for the OOI AB -3 days.
7/28: Eason "W" (34 days)
7/17: Demobe Lang in PR to save on deadhead transit (3 days overall savings)
6/30: Moved Lang to the left 1 week to get Jason 2 weeks to transit from Bermuda to WA (Tivey on Ride)
5/31: Orcutt w/ Jason on Ride
4/6: Need to add time at WHOI for ABS and in Astoria for Navsea???
4/3: End Hutchins in Barbados
2/21: June NAVSEA Ext. Cert. Survey (5 days) WHOI
2/20: Hutchin's IN/ Saito & Hodgekiss OUT (Armstrong)
1/31: Corrected Johns voyage from 2015-18
-Cordes wants his 2017 cruise 14 months before the 2018 cruise.
12/29: S. Lang Cayman DECLINED, Karson & Wanless "W"
View Summary
Set Default
Associated Cruises
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
30 Dec 2017
Dep:
30 Dec 2017
Arr:
03 Jan 2018
Unload:
03 Jan 2018
Comodoro Rivadavia, Argentina
Montevideo, Uruguay
None/ Deadhead/
SA02
SA02
0N/0E
0N/0E
Tim Schnoor
Transit Cruise
3/3
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Deadhead
Not Specified
3/NAVY-ONR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
04 Jan 2018
Dep:
05 Jan 2018
Arr:
20 Jan 2018
Unload:
23 Jan 2018
Montevideo, Uruguay
Montevideo, Uruguay
Argentine Basin/
SA02
SA02
0N/0E
0N/0E
Sebastien Bigorre
16/20
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
OOI Argentine Basin
Weller OOI Project Team
/
WHOI
OOI MREFC
20/NSF-OOI-OOI/F
Notes:
Labor Holiday Schedule: Half Day 12/24, Off 12/25, Half Day 12/31, Off 1/1
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
24 Jan 2018
Dep:
24 Jan 2018
Arr:
07 Feb 2018
Unload:
07 Feb 2018
Montevideo, Uruguay
Praia, Sao Tiago, Cape Verde Islands
None/ Deadhead/
SA02
SA02
0N/0E
0N/0E
Rose M. Dufour
Transit Cruise
15/15
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Deadhead
Not Specified
15/NSF-OCE-BIO/F
Notes:
Funding changed as per email Jan 3rd.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
08 Feb 2018
Dep:
11 Feb 2018
Arr:
14 Mar 2018
Unload:
16 Mar 2018
Praia, Sao Tiago, Cape Verde Islands
San Juan, Puerto Rico
Atlantic/
NA10
NA09
14N/24W
15N/60W
David Hutchins
32/37
Clearances:
Cape Verde(A)
Project
PI/Institution
Project #
Days/Agency/Status
Colimited N-fixers
David Hutchins
/
USC
1657757
37/NSF-OCE-BIO/F
Notes:
12/15: Took 1 day out of Hutchins science time to account for Navy Sub Search delays. Let's see if it holds? 5/10: Hutchins stated transit time is wrapped up in his science days.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
17 Mar 2018
Dep:
20 Mar 2018
Arr:
13 Apr 2018
Unload:
15 Apr 2018
San Juan, Puerto Rico
Woods Hole, MA, USA
NAMES/
NA06
NA06
41N/70W
41N/70W
Michael J. Behrenfeld
25/30
Clearances:
Canada(A), Greenland(A)
Project
PI/Institution
Project #
Days/Agency/Status
NAAMES
Michael J. Behrenfeld
/
OSU_Oregon State
Not Specified
28/NASA/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
16 Apr 2018
Dep:
16 Apr 2018
Arr:
24 Apr 2018
Unload:
24 Apr 2018
Woods Hole, MA, USA
Woods Hole, MA, USA
None/
SA02
SA02
0N/0E
0N/0E
Albert Suchy
Standby Days
9/9
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
9 days
Not Specified
0/OTHER/NonOp
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
25 Apr 2018
Dep:
28 Apr 2018
Arr:
08 May 2018
Unload:
08 May 2018
Woods Hole, MA, USA
St. George's, Bermuda
>70M dpth/
NA06
NA06
40N/70W
40N/70W
W. Bruce Strickrott
11/14
Clearances:
Bermuda(T), NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
2018 Alvin Engineer
Andrew D. Bowen
/
WHOI
Not Specified
4/NSF-OCE-IPS/F
2018 Eng Dives
Carl Kaiser
/
WHOI
Not Specified
3/NSF-OCE-IPS/F
Sentry Eng Dive
Carl Kaiser
/
WHOI
Not Specified
3/NSF-OCE-IPS/F
Alvin Eng Dive
Not Specified
1/NAVY-ONR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
09 May 2018
Dep:
11 May 2018
Arr:
10 Jun 2018
Unload:
11 Jun 2018
St. George's, Bermuda
St. George's, Bermuda
Volitales/
NA10
NA10
13N/45W
13N/45W
Mark D. Kurz
31/34
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Mantle Volatiles
Mark D. Kurz
/
WHOI
1259218
34/NSF-OCE-MGG/F
Alvin/ Sentry/ MISO
Not Specified
0/OTHER/F
Notes:
St George to Start = 1575nm/11/24 = 6 days
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
12 Jun 2018
Dep:
14 Jun 2018
Arr:
17 Jul 2018
Unload:
18 Jul 2018
St. George's, Bermuda
Woods Hole, MA, USA
NW Atlantic/
NA06
NA04
40N/49W
53N/42W
Mitchell Lyle
34/37
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Survey for IODP WNAT
Mitchell Lyle
/
CEOAS OSU
1656960
36/NSF-OCE-MGG/F
Notes:
St. Georges to Job Start- 1610NM/ 11/ 24 = 6 days Job Finish to WHOI - 675NM/ 11/ 24 = 3 days
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
19 Jul 2018
Dep:
19 Jul 2018
Arr:
27 Jul 2018
Unload:
27 Jul 2018
Woods Hole, MA, USA
Woods Hole, MA, USA
None/
SA02
SA02
0N/0E
0N/0E
Albert Suchy
Standby Days
9/9
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
9 days
Not Specified
0/OTHER/NonOp
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
28 Jul 2018
Dep:
28 Jul 2018
Arr:
15 Aug 2018
Unload:
15 Aug 2018
Woods Hole, MA, USA
Woods Hole, MA, USA
None/
SA02
SA02
0N/0E
0N/0E
Albert Suchy
Maintenance
19/19
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
19 days
Not Specified
0/OTHER/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
16 Aug 2018
Dep:
19 Aug 2018
Arr:
02 Sep 2018
Unload:
03 Sep 2018
Woods Hole, MA, USA
Woods Hole, MA, USA
VA, NC, SC, GA/
NA06
NA06
37N/73W
30N/78W
Caitlin Adams
15/19
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
SAB Deepwater
Caitlin Adams
/
NOAA/OER
Not Specified
15/NOAA-OE/F
Alvin
Not Specified
0/OTHER/F
Notes:
10/13: Adams cruise will be planned as 15 days until the 5 remaining days are funded to make it 20. Caitlin Adams: "So I received a rather definitive answer from Erik over the weekend regarding the potential schedule change to June. Unfortunately, I don't think it would work. This cruise will hinge on data collection by other ships in the area in both April and June, so the team would have the most success if they had time to process that data before an August departure."
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
04 Sep 2018
Dep:
08 Sep 2018
Arr:
01 Oct 2018
Unload:
03 Oct 2018
Woods Hole, MA, USA
San Juan, Puerto Rico
Lost City 2014/
NA06
NA06
30N/42W
30N/42W
Susan Lang
24/30
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Lost City 2014
Susan Lang
/
SC
1536702
26/NSF-OCE-BIO/F
Jason
Not Specified
0/OTHER/F
Notes:
Transits: 11 days total WHOI to Jobsite = 1575nm/11/24 = 6 days Jobsite to St.George's = 1175nm/11/24 = 5 days Jobsite to SanJuan = 1500nm/11/24 = 6 days
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
04 Oct 2018
Dep:
04 Oct 2018
Arr:
06 Oct 2018
Unload:
06 Oct 2018
San Juan, Puerto Rico
San Juan, Puerto Rico
0/
SA02
SA02
0N/0E
0N/0E
Sarah Fuller
3/3
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Pre-Mobe PAC work
Not Specified
2/NSF-OCE-BIO/F
Pre-Mobe PAC work
Not Specified
1/NSF-OCE-MGG/F
Notes:
Transits: 11 days total WHOI to Jobsite = 1575nm/11/24 = 6 days Jobsite to St.George's = 1175nm/11/24 = 5 days Jobsite to SanJuan = 1500nm/11/24 = 6 days
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
07 Oct 2018
Dep:
07 Oct 2018
Arr:
14 Oct 2018
Unload:
14 Oct 2018
San Juan, Puerto Rico
Puntarenas, Costa Rica
Deadhead/
SA02
SA02
0N/0E
0N/0E
Kerry Strom
Transit Cruise
8/8
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Deadhead
Not Specified
4/NSF-OCE-BIO/F
Deadhead
Not Specified
4/NSF-OCE-MGG/F
Notes:
SanJuan-Colon = 1000nm/11/24 = 4 days Transit = 2 days Panama-Puntarenas = 500nm/11/24 = 2 days Diversion from Bermauda to P.R. to demobe and transit saved 4 days! (was 12 now 8) But added a day to Lang transit Astoria, OR to SCRIPPS = 1000nm/ 11 / 24 = 4 days
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
15 Oct 2018
Dep:
16 Oct 2018
Arr:
06 Nov 2018
Unload:
06 Nov 2018
Puntarenas, Costa Rica
Puntarenas, Costa Rica
Costa Rica/
NP13
NP13
9N/84W
9N/84W
Erik Cordes
22/23
Clearances:
Costa Rica(A)
Project
PI/Institution
Project #
Days/Agency/Status
Costa Rica seeps
Erik Cordes
/
Temple
1635219
23/NSF-OCE-BIO/F
Alvin/ Sentry
Not Specified
0/OTHER/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
07 Nov 2018
Dep:
07 Nov 2018
Arr:
14 Nov 2018
Unload:
14 Nov 2018
Puntarenas, Costa Rica
Guaymas, Mexico
Deadhead/
SA02
SA02
0N/0E
0N/0E
Daniel J. Fornari
Transit Cruise
8/8
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Deadhead
Not Specified
5/NSF-OCE-BIO/F
Deadhead
Not Specified
3/NSF-OCE-MGG/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
15 Nov 2018
Dep:
16 Nov 2018
Arr:
29 Nov 2018
Unload:
30 Nov 2018
Guaymas, Mexico
Manzanillo, Mexico
Guaymas Basin/
IN02
IN02
27N/111E
27N/111E
Andreas P. Teske
14/16
Clearances:
Mexico(T), NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Guaymas Basin
Andreas P. Teske
/
UNC_CH
OCE-1357238
16/NSF-OCE-BIO/F
Alvin/ Sentry
Not Specified
0/OTHER/F
Notes:
Premobe at WHOI in Sept. (During "Available" Period) Demobe in US Dry Dock Port Only 1 day mobe in Guaymas needed d/t the preloading at WHOI Transit total 8 days Puntarenas, CR to Job = 1930nm/ 11 /24 = 7 days + 1 day to Guaymas, MX
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
01 Dec 2018
Dep:
03 Dec 2018
Arr:
19 Dec 2018
Unload:
21 Dec 2018
Manzanillo, Mexico
San Diego, CA, USA
8 20N EPR/
NP13
NP13
8N/104W
8N/107W
Patricia Gregg
17/21
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
OASIS
Patricia Gregg
/
UIUC
1356610
11/NSF-OCE-MGG/F
EPR ECS Cruise
Patricia Gregg
/
UIUC
1834797
10/NSF-OCE-IPS/F
Alvin/ Sentry
Not Specified
0/OTHER/F
Notes:
11/13 email: 9° 50N for 4 days of work following the Gregg et al. 8° 20'N seamount dives, and then transiting directly to San Diego Manz to 1st station = 3 days Last station to San Diego is 1575nm/ 11/ 24 = 6 days
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
22 Dec 2018
Dep:
22 Dec 2018
Arr:
22 Dec 2018
Unload:
22 Dec 2018
San Diego, CA, USA
San Diego, CA, USA
None/
SA02
SA02
0N/0E
0N/0E
Daniel J. Fornari
Outreach
1/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
EPR ECS Cruise
Patricia Gregg
/
UIUC
1834797
1/NSF-OCE-IPS/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
23 Dec 2018
Dep:
23 Dec 2018
Arr:
25 Dec 2018
Unload:
25 Dec 2018
San Diego, CA, USA
Mare Island, CA, USA
None/
SA02
SA02
0N/0E
0N/0E
Timothy Twomey
Transit Cruise
3/3
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
3/ Non Op
Not Specified
0/OTHER/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
26 Dec 2018
Dep:
26 Dec 2018
Arr:
31 Dec 2018
Unload:
31 Dec 2018
Mare Island, CA, USA
Mare Island, CA, USA
None/
SA02
SA02
0N/0E
0N/0E
Albert Suchy
Maintenance
6/6
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
DryDock TBD
Not Specified
0/OTHER/F
Agency
Funded
Pending
Total
NASA
28
0
28
NAVY
4
0
4
NOAA
15
0
15
NSF
238
0
238
NSF-OOI
20
0
20
OTHER
0
0
0
Total
305
0
305
<
Day Type
Total
Transit Cruise
37
Standby Days
18
Maintenance
25
At Sea for Science
244
Outreach
1
Total
325
<
Load/Unload Days
Total
ChargeLoad
18
ChargeUnload
12
NonChargeLoad
7
NonChargeUnload
3
Total
40