We have migrated to a new server, please update any bookmarks or page references to this page.
View Schedule
or schedule as:
the schedule as:
  2009 - New Horizon  
Final Schedule
Final - ID #10639    Version #2 - 1/25/2010

Scheduling Contact(s)
Rose Dufour & Liz Brenner shipsked*%*%*ucsd^%^%^edu (858) 534-2841

  Notes:  
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:02 Jan 09
Dep:07 Jan 09
Arr:24 Jan 09
DeMob:25 Jan 09
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
NP09
NP09
 
 
 
39N/130W
39N/130W
 
  David Wolgast   18/22
 
Project PI/Institution Project # Days/Agency/Status
CalCOFI - Ocean obse Tony Koslow/SIO Not Specified 15/NOAA/F
calibrate the EK-60 Tony Koslow/SIO Not Specified 1/INST-UCSD-SIO/F
LTER: Nonlinear Tran Mark D. Ohman/SIO 0417616 1/NSF-OCE-BIO/F
Southern California Ralf Goericke/SIO Not Specified 1/NOAA/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-koslow01/
Notes: Added one day for EK-60 calibration

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:29 Jan 09
Dep:30 Jan 09
Arr:07 Feb 09
DeMob:09 Feb 09
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
  William S. Hodgkiss   5/7
 
Project PI/Institution Project # Days/Agency/Status
WAK/WH ONR William S. Hodgkiss/SIO Not Specified 5/NAVY-ONR/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-hodgkiss01/
Notes: 3 Cruises were carried out during this period: January 30-31, Feb 3-4 and Feb 7th.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:12 Feb 09
Dep:12 Feb 09
Arr:19 Apr 09
DeMob:19 Apr 09
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
  Out of Service   0/67
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:20 Apr 09
Dep:22 Apr 09
Arr:03 May 09
DeMob:05 May 09
 
San Diego, CA, USA
San Diego, CA, USA
 
CalCOFI Lines/
NP09
NP09
 
 
 
34N/120W
33N/121W
 
  Michael Stukel   12/16
 
Project PI/Institution Project # Days/Agency/Status
Production Processes Michael Stukel/SIO Not Specified 12/INST-UCSD-SIO/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-stukel/
Notes: Sailed as scheduled returned to port evening of 4/22 due to CTD problems. Sailed the next day.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:06 May 09
Dep:06 May 09
Arr:11 May 09
DeMob:11 May 09
 
San Diego, CA, USA
Newport, OR, USA
 
 /
NP09
NP09
 
 
 
32N/117W
44N/124W
 
  Transit   6/6
 
Project PI/Institution Project # Days/Agency/Status
transit to Newport Not Specified 6/NSF/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-transit01/
Notes: ~ 90 hrs transit

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:11 May 09
Dep:12 May 09
Arr:29 May 09
DeMob:30 May 09
 
Newport, OR, USA
Newport, OR, USA
 
 /
NP09
NP09
 
 
 
45N/125W
45N/125W
 
  Byron Crump   18/19
 
Project PI/Institution Project # Days/Agency/Status
S&TC-Coastal Margin Antonio Baptista/OGI OCE 0424602 19/NSF-OCE-OTIC/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-baptista01/
Notes: Requesting 0800 departure. Need one day to load. (Tie up at Port Westward (Beaver Army Dock) late afternoon of May 13 and depart the morning of May 14). Intermediate stops at Job Corps dock in Astoria on May 21 and possibly May 26 (waiting approval). All scientific load out to take place in Newport. Offload on arrival day.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:30 May 09
Dep:30 May 09
Arr:03 Jun 09
DeMob:03 Jun 09
 
Newport, OR, USA
San Diego, CA, USA
 
 /
NP09
NP09
 
 
 
44N/124W
32N/117W
 
  Transit   4/4
 
Project PI/Institution Project # Days/Agency/Status
transit from Newport Not Specified 4/NSF/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-transit02/
Notes: Departure will take place in the afternoon after scientific offload.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:04 Jun 09
Dep:04 Jun 09
Arr:04 Jun 09
DeMob:21 Jul 09
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
  Available   0/47
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:22 Jul 09
Dep:24 Jul 09
Arr:28 Jul 09
DeMob:29 Jul 09
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
NP09
NP09
 
 
 
39N/130W
39N/130W
 
  Curtis A. Collins   5/8
 
Project PI/Institution Project # Days/Agency/Status
OC3570 Student Cruis Curtis A. Collins/NPS Not Specified 5/NAVY-NPS/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-collins/
Notes: Requests complete overlap with John Hildebrand cruise on R/V R.G. Sproul.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:31 Jul 09
Dep:02 Aug 09
Arr:21 Aug 09
DeMob:21 Aug 09
 
San Diego, CA, USA
Newport, OR, USA
 
 /
NP09
 
 
 
 
35N/138W
0N/0E
 
  Miriam Goldstein   20/22
 
Project PI/Institution Project # Days/Agency/Status
Debris @ NP Gyre Miriam Goldstein/SIO Not Specified 10/INST-UCSD-SIO/F
Project Kaisei Not Specified 7/OTHER/F
transit Not Specified 3/NSF/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-goldstein/

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:22 Aug 09
Dep:22 Aug 09
Arr:26 Aug 09
DeMob:26 Aug 09
 
Newport, OR, USA
Newport, OR, USA
 
Offshore Oregon/
NP09
NP09
 
 
 
45N/124W
45N/125W
 
  Steven Constable   5/5
 
Project PI/Institution Project # Days/Agency/Status
Design, Develop, and Steven Constable/SIO Not Specified 5/OTHER/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-constable/
Notes: Gear will be coming off Revelle ~ 27 June from Australia.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:27 Aug 09
Dep:29 Aug 09
Arr:11 Sep 09
DeMob:11 Sep 09
 
Newport, OR, USA
Newport, OR, USA
 
Columbia River/
 
 
 
 
 
0N/0E
0N/0E
 
  Tawnya D. Peterson   14/16
 
Project PI/Institution Project # Days/Agency/Status
S&TC-Coastal Margin Antonio Baptista/OGI OCE 0424602 16/NSF-OCE-OTIC/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-baptista02/
Notes: Two ship ops with Pt. Sur

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:11 Sep 09
Dep:11 Sep 09
Arr:15 Sep 09
DeMob:15 Sep 09
 
Newport, OR, USA
San Diego, CA, USA
 
 /
NP09
NP09
 
 
 
32N/117W
44N/124W
 
  Transit   4/4
 
Project PI/Institution Project # Days/Agency/Status
transit Not Specified 4/NSF/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-transit03/

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:16 Sep 09
Dep:16 Sep 09
Arr:24 Sep 09
DeMob:24 Sep 09
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
  Maintenance   0/0
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: AC unit repairs

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:22 Sep 09
Dep:25 Sep 09
Arr:28 Sep 09
DeMob:29 Sep 09
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
NP09
NP09
 
 
 
33N/117W
33N/117W
 
  Lauren Rafelski   4/8
 
Project PI/Institution Project # Days/Agency/Status
Development of in Ralph F. Keeling/SIO 0421546 4/NSF-OCE-IPS/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-keeling/
Notes: carry forward- NSF no-cost extension approved. Ship time reduces from 14 to 6 days per L. Goad.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:30 Sep 09
Dep:02 Oct 09
Arr:12 Oct 09
DeMob:13 Oct 09
 
San Diego, CA, USA
Mazatlan, Mexico
 
 /
NP09
NP13
 
 
 
33N/117W
23N/106W
 
  Jared Kluesner   11/14

Clearances: Mexico(A)
 
Project PI/Institution Project # Days/Agency/Status
Geological Sampling Jared Kluesner/SIO Not Specified 7/INST-UCSD-SIO/F
(from Berelson) Not Specified 4/NSF/F
Development of in Ralph F. Keeling/SIO 0421546 1/NSF-OCE-IPS/F
Geological Sampling Jared Kluesner/SIO Not Specified 0/OTHER/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-kluesner/

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:14 Oct 09
Dep:14 Oct 09
Arr:27 Oct 09
DeMob:30 Oct 09
 
Mazatlan, Mexico
San Diego, CA, USA
 
 /
NP09
NP13
 
 
 
34N/118W
22N/115W
 
  William Berelson   14/17

Clearances: Mexico(A)
 
Project PI/Institution Project # Days/Agency/Status
Non-local bacterial William Berelson/USC 0727123 14/NSF-OCE-BIO/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-berelson/

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:31 Oct 09
Dep:31 Oct 09
Arr:31 Oct 09
DeMob:02 Nov 09
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
  Lisa A. Levin   1/2
 
Project PI/Institution Project # Days/Agency/Status
Deep-Sea Bio Lisa A. Levin/SIO UC Ship Funds 1/INST-UCSD-SIO/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-levin/

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:01 Nov 09
Dep:01 Nov 09
Arr:01 Nov 09
DeMob:02 Nov 09
 
San Diego, CA, USA
 
 
West of Pt Loma/
NP09
NP09
 
 
 
33N/117W
33N/117W
 
  Peter J. Franks   1/1
 
Project PI/Institution Project # Days/Agency/Status
SIO280 Peter J. Franks/SIO Not Specified 1/INST-UCSD-SIO/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-franks/

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:03 Nov 09
Dep:06 Nov 09
Arr:23 Nov 09
DeMob:24 Nov 09
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
NP09
NP09
 
 
 
39N/130W
39N/130W
 
  Jennifer Rodgers-Wolgast   18/22
 
Project PI/Institution Project # Days/Agency/Status
CalCOFI - Ocean obse Tony Koslow/SIO Not Specified 16/NOAA/F
LTER: Nonlinear Tran Mark D. Ohman/SIO 0417616 2/NSF-OCE-BIO/F
Southern California Ralf Goericke/SIO Not Specified 0/NOAA/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-koslow02/
Notes: .680 wire spooling (to be shipped to Melville) to be done during sci. loading

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:01 Dec 09
Dep:01 Dec 09
Arr:01 Dec 09
DeMob:01 Dec 09
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
  Maintenance   1/1
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: ABS Inspection

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:04 Dec 09
Dep:05 Dec 09
Arr:08 Dec 09
DeMob:09 Dec 09
 
San Diego, CA, USA
San Diego, CA, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
  Lee Tretbar   4/6
 
Project PI/Institution Project # Days/Agency/Status
DART Karen Grissom/NOAA_NDBC Not Specified 4/NOAA-NWS-NDBC/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-grissom/
Notes: If it possible to conduct the recovery portion of the schedule, the plan is to leave the last station at dusk on the 7th. The group plans to offload on the 8th.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   At Sea/Total Days
Mob:11 Dec 09
Dep:12 Dec 09
Arr:20 Dec 09
DeMob:22 Dec 09
 
San Diego, CA, USA
San Diego, CA, USA
 
Line 66 and 90/
NP09
NP09
 
 
 
32N/117W
32N/117W
 
  Uwe Send   9/12
 
Project PI/Institution Project # Days/Agency/Status
CORC Uwe Send/SIO NA17RJ1231 5/NOAA/F
Nonlinear transition Mark D. Ohman/SIO 0841424 2/NSF-OCE-BIO/F
NOAA-CCE Uwe Send/SIO Not Specified 2/NOAA/F
 
External Cruise Webpage: http://shipsked.ucsd.edu/Schedules/2009/2009-NH-send02/
Notes: Flexible start date to be determined by weather.
Agency   Funded   Pending   Total
INST   32   0   32
NAVY   10   0   10
NOAA   43   0   43
NSF   80   0   80
OTHER   12   0   12
Total  177 0 177