View Schedule

or schedule as:
the schedule as:
  2018 - Neil Armstrong  
Version 16
Final - ID #13727    Version #3 - 12/19/2018

Scheduling Contact(s)
Kerry Strom kstrom*%*%*whoi^%^%^edu (508) 289-3938

  Notes:   11/28: Arrives 1 day early for Savidge d/t bad wx (was 11/29)
11/17: Departs 1 day later for Savidge d/t bad wx (was 11/16)
10/27-28: Pioneer Pit stop to pick up critical spare parts for science mission
10/24: Vessel returned from 1st Pioneer leg 1 day later d/t wx
10/19: Deadhead allocation correction from Iceland to WHOI (from Global to Ocean class policy)
10/15: Arrive WHOI 1 day late d/t wx. Removed 1 of the 3 demobe days to compensate for delayed arrival. 1 day added to OOI account on the transit. 1 day added to the overall schedule (248 to 249).
10/2: Armstrong's Pickart cruise returns a day earlier.
9/4: Hodgkiss returns 2 days earlier (day count stays the same)
8/1: Vsl arrives Reykjavik 1 day earlier d/t wx
7/25: Fall Pioneer legs updated
5/15: 1 day late in Reykjavik d/t wx
4/6: Main crane failure, emergency port stop 4/ 6th-8th.
2/12: 1 day shift to the left starting on Spring Pioneer to add 1 day into deadhead transit up to Reykjavik/ Removed 1 day from the 4 day demobe at WHOI after the deadhead transit from Reykjavik (scheduling oversight).
Remove March WHOI Inst Days place holder.
Changed 57 days alongside to "Laydays" not "Available"
Add 3 days before PEACH for WHOI Inst Days.
1/6: Non-paid day at sea for maintenance and testing on Jan 24th.
Jan 23rd USCG COI
12/15: MacKinnon (Harper) will use 2 days at WHOI to mobe before transit
11/25: Spring Pioneer in 2 legs
11/22: Shift deadhead from WHOI 1 day to the left...Give Hodgkiss 1 more mobe day & adjust spring OOI into 2 legs (not 3).
11/13: INSURV scheduled for week of 12/17/18
10/4: ONR granted 4 additional days of funding to accommodate Hodgkiss swap
9/15: Shifted everything fm MacKinnon 2 days to the right to give the ship 5 days prep at WHOI
9/7: Thanksgiving 2018 is Nov. 22nd
8/30: Peters not funded
6/28: Evans & Garwakawicz "W"
6/27: Martens & Duda "W"
6/16: Send not funded
6/13: Mak Saito on Atlantic Explorer? (Clio already in Bermuda)
6/13: Lyle changed his STR to a 1 month later start date (Endeavor or AE?)
6/13: Bucklin "W"
D'Hont, Miksis-Olds & Toole on Endeavor
6/2: Johns & Bower updated STR's
4/3: Toole deferring his spring mission to 2019 (not ready)
3/27: Updated OOI Pioneer & Irminger science days
3/2: Toole may have to go on Atlantic Explorer/ Endeavor. He may delay 1st of 2 voyages TBD.
2/20: Hutchin's OUT (on Atlantis)/ Saito & Hodgekiss IN
2/1: Hutchins in, half of Herbert in (remainder on Endeavor), Savidge out (2 voyages), Miksis out (1 of 2 voyages), D'Hont Out...SAVIDGE #1 back in
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jan 2018
Dep:01 Jan 2018
Arr:06 Jan 2018
Unload:06 Jan 2018
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
Available/ Main/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  Albert Suchy
Available for Service
  6/6

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Jan 2018
Dep:08 Jan 2018
Arr:21 Jan 2018
Unload:22 Jan 2018
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
Hatteras/
NA06
NA06
 
 
 
37N/76W
37N/76W
 
  Magdalena Andres
  14/16

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
PEACH Dana K. Savidge/Skidaway 1559476 14/NSF-OCE-PO/F
 
Notes: Transit WHOI to NFK, VA: 360nm > (1.5) 2+1 = 3 days

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:23 Jan 2018
Dep:23 Jan 2018
Arr:20 Mar 2018
Unload:20 Mar 2018
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
Available/ Main/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  Albert Suchy
Standby Days
  57/57

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
57 Not Specified 0/OTHER/NonOp

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:21 Mar 2018
Dep:23 Mar 2018
Arr:01 Apr 2018
Unload:01 Apr 2018
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
NE shelf/
NA06
NA06
 
 
 
39N/69W
41N/71W
 
  Sheri N. White
  10/12

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI Pioneer Al Plueddemann/WHOI Not Specified 10/NSF-OOI-OOI/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Apr 2018
Dep:03 Apr 2018
Arr:06 Apr 2018
Unload:07 Apr 2018
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
NE shelf/
NA06
NA06
 
 
 
39N/69W
41N/71W
 
  Sheri N. White
  4/6

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI Pioneer Al Plueddemann/WHOI Not Specified 4/NSF-OOI-OOI/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:08 Apr 2018
Dep:08 Apr 2018
Arr:13 Apr 2018
Unload:13 Apr 2018
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
NE shelf/
NA06
NA06
 
 
 
39N/69W
41N/71W
 
  Sheri N. White
  6/6

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI Pioneer Al Plueddemann/WHOI Not Specified 6/NSF-OOI-OOI/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Apr 2018
Dep:16 Apr 2018
Arr:29 Apr 2018
Unload:30 Apr 2018
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
SBF phys/bio/
NA06
NA06
 
 
 
41N/70W
41N/70W
 
  Dennis J. McGillicuddy
  14/17

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
SBF phys/bio Dennis J. McGillicuddy/WHOI 1657803 14/NSF-OCE-BIO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 May 2018
Dep:01 May 2018
Arr:01 May 2018
Unload:01 May 2018
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
None/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  Albert Suchy
Maintenance
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Mobe MacKinnon Not Specified 0/OTHER/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 May 2018
Dep:04 May 2018
Arr:14 May 2018
Unload:14 May 2018
 
Woods Hole, MA, USA
Reykjavik, Iceland
 
Transit/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  Albert Suchy
Transit Cruise
  11/13

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
56% Not Specified 6/NSF-OCE-PO/F
29% Not Specified 3/NAVY-ONR/F
15% Not Specified 2/NSF-OOI-OOI/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:15 May 2018
Dep:16 May 2018
Arr:30 May 2018
Unload:01 Jun 2018
 
Reykjavik, Iceland
Reykjavik, Iceland
 
North Atlantic/
NA01
NA01
 
 
 
61N/31W
61N/31W
 
  Harper L. Simmons
  15/18

Clearances: NONE(A)
 
Project PI/Institution Project # Days/Agency/Status
niskin Jennifer A. MacKinnon/SIO Not Specified 18/NAVY-ONR/F
 
Notes: Rey to Job: 300nm/10/24 = 1.2 days

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Jun 2018
Dep:05 Jun 2018
Arr:24 Jun 2018
Unload:26 Jun 2018
 
Reykjavik, Iceland
Reykjavik, Iceland
 
Irminger Sea/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  Alison Macdonald
  20/25

Clearances: Greenland(A)
 
Project PI/Institution Project # Days/Agency/Status
OOI Irminger Sea Weller OOI Project Team/WHOI Not Specified 21/NSF-OOI-OOI/F
OSNAP-GDWBC Moorings Amy S. Bower/WHOI 1756363 4/NSF-OCE-PO/F
 
Notes: WHOI to Irminger 1800nm/11/24 = 6.8 (7days) Irminger to Rey 550nm/11/24 = 2 days 9 total + 1 day for wx (10)...previously scheduled 11 (1 day savings)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:27 Jun 2018
Dep:01 Jul 2018
Arr:29 Jul 2018
Unload:31 Jul 2018
 
Reykjavik, Iceland
Reykjavik, Iceland
 
North Atlantic/
NA01
NA01
 
 
 
64N/20W
64N/20W
 
  William E. Johns
  29/35

Clearances: United Kingdom(A)
 
Project PI/Institution Project # Days/Agency/Status
OSNAP East 2018 William E. Johns/RSMAS 1259398 30/NSF-OCE-PO/F
3 Dutch Days Not Specified 3/NSF-OCE-PO/F
2 days mobelization Not Specified 2/NAVY-ONR/F
 
Notes: 10/4: 2 additional days granted from ONR to delay Pickart cruise by 4 days and accommodate the cruise swaps for Hodgkiss. Rey to job start 650nm/ 11/ 24 = 2.4 days Job finish to Rey 450nm/ 11/ 24 = 1.7 days

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Aug 2018
Dep:04 Aug 2018
Arr:19 Aug 2018
Unload:23 Aug 2018
 
Reykjavik, Iceland
Reykjavik, Iceland
 
Norwegian Sea/
NA05A
NA05A
 
 
 
60N/11E
60N/11E
 
  William S. Hodgkiss
  16/23

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
MF Noise William S. Hodgkiss/SIO Not Specified 23/NAVY-ONR/F
 
Notes: 10/4: 2 additional days granted from ONR to delay Pickart cruise by 4 days and accommodate the cruise swaps for Hodgkiss. 2 days Mobe at WHOI before Deadhead to Rey. Transits: 6 days total Rey to job = 600nm/ 10 / 24 = 2.5 ~3 days @ 11 knots... 600nm/11/24 = 2.2 * 2 = 4 (+1 for wx) 5 total

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:24 Aug 2018
Dep:27 Aug 2018
Arr:02 Oct 2018
Unload:04 Oct 2018
 
Reykjavik, Iceland
Reykjavik, Iceland
 
Irm/Lab Seas/
NA04
NA04
 
 
 
59N/30W
52N/53W
 
  Robert S. Pickart
  37/42

Clearances: Canada(A), Denmark(A), Greenland(A)
 
Project PI/Institution Project # Days/Agency/Status
OSNAP-West Robert S. Pickart/WHOI 1259618 42/NSF-OCE-PO/F
 
Notes: 10/4: Signing off NOAA's Healy Aug 26th in Nome* Rey to Start 420nm = 2 days Finish to WHOI 1200nm = 5 days/ 7 total

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:05 Oct 2018
Dep:05 Oct 2018
Arr:15 Oct 2018
Unload:17 Oct 2018
 
Reykjavik, Iceland
Woods Hole, MA, USA
 
Transit/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  Albert Suchy
Transit Cruise
  11/13

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
56% Not Specified 6/NSF-OCE-PO/F
29% Not Specified 3/NAVY-ONR/F
15% Not Specified 2/NSF-OOI-OOI/F
 
Notes: 35 days total days in/ out of WHOI OOI has 21 days/ PEACH 14 days 21/35 = 60%, 14/35 = 40% 9 days deadhead transit OOI...9*60%/100 = 5.4 days PEACH...9*40%/100 = 3.6 days

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:18 Oct 2018
Dep:20 Oct 2018
Arr:23 Oct 2018
Unload:23 Oct 2018
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
NE shelf/
NA06
NA06
 
 
 
39N/69W
41N/71W
 
  Al Plueddemann
  4/6

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI Pioneer Al Plueddemann/WHOI Not Specified 4/NSF-OOI-OOI/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:24 Oct 2018
Dep:24 Oct 2018
Arr:31 Oct 2018
Unload:31 Oct 2018
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
NE shelf/
NA06
NA06
 
 
 
39N/69W
41N/71W
 
  Al Plueddemann
  8/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI Pioneer Al Plueddemann/WHOI Not Specified 8/NSF-OOI-OOI/F
 
Notes: 10/27-28: Pit stop to pick up critical spare parts for science mission

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Nov 2018
Dep:01 Nov 2018
Arr:10 Nov 2018
Unload:11 Nov 2018
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
NE shelf/
NA06
NA06
 
 
 
39N/69W
41N/71W
 
  Al Plueddemann
  10/11

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI Pioneer Al Plueddemann/WHOI Not Specified 10/NSF-OOI-OOI/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:12 Nov 2018
Dep:12 Nov 2018
Arr:14 Nov 2018
Unload:14 Nov 2018
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
Off Cape/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  Glen Gawarkiewicz
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
JP Orientation Cruis Glen Gawarkiewicz/WHOI Not Specified 3/INST-WHOI/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:15 Nov 2018
Dep:17 Nov 2018
Arr:28 Nov 2018
Unload:29 Nov 2018
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
Hatteras/
NA06
NA06
 
 
 
37N/76W
37N/76W
 
  Harvey Seim
  12/15

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
PEACH Dana K. Savidge/Skidaway 1559476 14/NSF-OCE-PO/F
 
Notes: 1 day later departure d/t bad wx. No change in charge days. Vessel came in 1 day early d/t bad wx. No change in charge days.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Dec 2018
Dep:01 Dec 2018
Arr:16 Dec 2018
Unload:16 Dec 2018
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
Thanksgiving/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  Albert Suchy
Standby Days
  16/16

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
16 Not Specified 0/OTHER/NonOp

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Dec 2018
Dep:17 Dec 2018
Arr:21 Dec 2018
Unload:21 Dec 2018
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
None/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  Albert Suchy
Inspection
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Navy INSURV Not Specified 0/OTHER/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:22 Dec 2018
Dep:22 Dec 2018
Arr:31 Dec 2018
Unload:31 Dec 2018
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
Thanksgiving/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  Albert Suchy
Available for Service
  10/10

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Agency   Funded   Pending   Total
INST   3   0   3
NAVY   49   0   49
NSF   133   0   133
NSF-OOI   67   0   67
OTHER   0   0   0
Total  252 0 252
<
Day Type   Total
Available for Service   16
Transit Cruise   22
Inspection   5
Standby Days   73
Maintenance   1
At Sea for Science   202
Total  319
<
Load/Unload Days   Total
ChargeLoad   14
ChargeUnload   12
NonChargeLoad   12
NonChargeUnload   7
Total  45