For all NEW or RESUBMITTED Projects/Ship Time Requests, go to https://mfp.us and create a new SME. Some STRs for projects starting in 2022 and beyond have already been moved to Marine Facilities Planning (mfp.us). Check your MFP Science Portal for any projects that might already be moved. If you need to make edits to projects that begin in 2022 and beyond, please contact mfp@unols.org for assistance. Be sure to indicate the Project and STR IDs that you would like to edit. For more information on getting into MFP, see the More Information button below.

  G2P in VoMs  -  2020  -  Kilo Moana  
  Project Information  
Project Title: RII Track-2 FEC: G2P in VOM: An experimental and analytical framework for genome to phenome connections in viruses of microbes Project Status: Submitted
Principal Investigator: K. Eric Wommack, UDEL Project Institution: UDEL
Project ID: 105666 Version #: 1
Date Submitted: 2/8/2017 10:47:00 PM Created By: K. Eric Wommack
Date Last Modified: 7/26/2017 4:36:00 PM URI Serial #: None
Funding Agencies: NSF/GEO - 1736030-EPSCorR - Funded
Summary of Field Work: Examining connections between the phenomic and genomic characteristics of viruses.The work will consist of water column sampling of the N. Pacific sub-tropical gyre using a standard CTD rosette instrumentation package and Niskin bottles. Samples will be processed on board and then snap frozen for subsequent shoreside molecular genetic analyses of virio- and bacterioplankton communities. We will also conduct three day deck incubations in ambient flowing seawater incubation troughs.
Summary of Facility Requirements: e will need a CTD/rosette, ADCP, sufficient
deck space and flowing seawater incubation troughs for incubation
experiments, a zodiac for shoreside logistical operations.
Summary of other requirements and comments:  
Ship Request Identification
Type of Request: Collaborative Ship Use Request Status: Submitted
Request ID: 1009173 Created By: K. Eric Wommack
Date Last Modified: 2/8/2017 10:47:00 PM Date Submitted: 2/8/2017 10:47:00 PM
Requested Ship, Operating Days and Dates
Year: 2020 Ship/Facility: Kilo Moana
Optimum Start Date: 7/15/2020 Dates to Avoid: Summer 2020 would work best for us to avoid the time demands of academic year.
 
 
Earliest Start Date: 6/5/2020 Multi-Ship Op: No
Latest Start Date: 8/5/2020 Other Ship(s): N/A

Operating Days Needed: Science Days Mob Days De-Mob Days Estimated Transit Days Total Days
7 1 1 0 9
Repeating Cruise?
(within same year)
No Interval:   # of Cruises:  

Description of Repeating cruise requirements: Repeated cruise intervals are not required
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations:
For several reasons, the Kilo Moana is the ideal
choice for this work. 1) The Moana routinely works in these waters. 2) The ship is an ideal size for the scientific party and has ample wet and dry lab space. 3) A member of our collaborative team is located at the University of Hawaii which eases the logistical burden of mobilization and demobilization.
Work Area for Cruise
Short Description of Op Area
for use in schedules:
N. Pacific
Description of Op Area: Coastal and open ocean
Op Area Size/Dia.: 500
 
  Lat/Long Marsden Grid Navy Op Area
Beginning
NP12 map
Ending
NP12 map
Foreign Clearance and Permitting Requirements
Foreign Clearance Required? No Coastal States:
 Important Info on Foreign Research Clearances  

Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
No If yes, have you applied for the necessary permits through your export control office? No
 Questions about ITAR/EAR regulations?

Comments about foreign clearance requirements or
description of any other special permitting requirements
(e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.)
N/A
Port Calls
Requested Start Port Intermediate Port(s) Requested End Port
Kaneohe Bay, HI, USA None, Kaneohe Bay, HI, USA
Explanation/justification for requested
ports and dates of intermediate stops
or to list additional port stops
Kaneohe Bay would be most convenient for mobilization and demobilzation

 Important Info on Working in Foreign Ports

 
Science Party
Chief Scientist: K. Eric Wommack, UDEL
# in Science Party 14 # of different science teams 1 # Marine Technicians to be
provided by ship operator:
(include in science party total)
1
Explanation of Science Party Requirements and Technician Requirements Wet lab space, deck-incubations, and CTD operations
Instrumentation Requirements That Impact Scheduling Decisions
Selected Dynamic PositioningUnselected ADCPUnselected MultibeamUnselected Seismic
Unselected Dredging/Coring/Large Dia. Trawl WireUnselected Stern A-frameUnselected Fiber Optic (.681)Unselected 0.680 Coax Wire
Unselected SCUBA DivingSelected Radioisotope use - briefly describeUnselected NO Radioisotope use/Natural level workUnselected Other Operator Provided Inst. - Describe
0 PI-Provided Vans - briefly describe Unselected MOCNESS  
Explain Instrumentation or Capability
requirements that could affect choice
of ship in scheduling.

H3-labeled leucine for bacterial production measurements.

Major Ancillary Facilities (that require coordination of schedules with ship schedule)
Aircraft
Unselected Helicopter Ops (USCG)Unselected Twin OtterUnselected Unmanned Aerial Systems (UAS) 
Autonomous Underwater Vehicle (AUV)
Unselected Other AUVUnselected Sentry  
Coring Facility
Unselected Jumbo Piston CoringUnselected Large Gravity Core Unselected MC800 multicorer w/ MISO camera/telemetryUnselected OSU Coring Facility (MARSSAM)
Unselected Other Large Coring FacilityUnselected WHOI Long Core  
Human Occupied Vehicle (HOV)
Unselected AlvinUnselected Clelia (HBOI)Unselected JSL I & II (HBOI)Unselected Other HOV
Other Facility
Unselected MISO Facility - deep-sea imagingUnselected Other FacilityUnselected Potential Fields Pool Equipment 
Remotely Operated Vehicle (ROV)
Unselected JasonUnselected Other ROV  
Seismic Facility
Unselected Ocean Bottom Seismograph Instrument Center (OBSIC)Unselected Ocean Bottom Seismograph Instrument Pool (OBSIP)Unselected Ocean-Bottom Seismometer Program (UTIG)Unselected Other Seismic/OBS Facility
Unselected PASSCALUnselected Portable MCS groupUnselected Portable MCS/SCS groupUnselected U.S. Geological Survey Ocean Bottom Seismometer Facility (USGS at WHOI)
Towed Underwater Vehicle
Unselected ARGO IIUnselected Hawaii MR1 (HMRG)Unselected IMI12 (HMRG)Unselected IMI120 (HMRG - formerly DSL 120A)
Unselected IMI30 (HMRG)Unselected Other Towed Underwater VehicleUnselected Towfish 
UNOLS Van Pool
Unselected AUV Lab Van #1Unselected Clean Lab VanUnselected Cold Lab VanUnselected General Purpose Lab Van
Unselected Radioisotope Lab VanUnselected Wet Lab Van  
UNOLS Winch Pool
Unselected Mooring SpoolerUnselected Portable WinchUnselected Turn Table 
Explain Major Ancillary Facilities
Requirements and list description
and provider for "other" systems.
N/A

Expand request schedules  Associated Schedules

Expand request history Ship Request History