Project Title: |
RIO ROSO: a Robotically Installed & Online Remote Ocean Observatory |
Project Status: |
Submitted |
Principal Investigator: |
John Orcutt, SIO |
Project Institution: |
SIO |
Project ID: |
106190 |
Version #: |
1 |
Date Submitted: |
7/4/2018 3:36:00 AM |
Created By: |
Jeffrey M. Babcock |
Date Last Modified: |
6/13/2019 3:52:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NAVY/ONR - NONE - Funded |
Summary of Field Work: |
Year-1: Initial testing of tow-body will be performed during a series of 1 or 2 day legs on the R/V Gordon Sproul. A complete system test will be performed in the San Diego Trough during a 2-day R/V Sproul deployment cruise leg. OSG and OBP units will be deployed independently form the ship, where real-time communication, data transmission quality, and seismic data fidelity can be monitored and assessed. |
Summary of Facility Requirements: |
Initial tow-body testing will be performed near shore on the R/V Gordon Sproul on a series of initial near shore cruise (3-days). |
Summary of other requirements and comments: |
Testing over a 3-month period will be performed in the San Diego Trough and require the R/V Sproul for a series of 1- to 2-day deployment cruises. |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1009985 |
Created By: |
Jeffrey M. Babcock |
Date Last Modified: |
7/4/2018 3:36:00 AM |
Date Submitted: |
7/4/2018 3:36:00 AM |
|
Year: |
2020
|
Ship/Facility: |
Robert Gordon Sproul
|
Optimum Start Date:
|
3/1/2020 |
Dates to Avoid: |
N/A |
|
|
|
|
Earliest Start Date: |
1/1/2020 |
Multi-Ship Op: |
No |
Latest Start Date: |
6/1/2020 |
Other Ship(s): |
N/A |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
3 |
0 |
0 |
0 |
3 |
Repeating Cruise?
(within same year) |
Yes |
Interval: |
3 months |
# of Cruises: |
3 |
|
Description of Repeating cruise requirements: |
Full system deployment and testing in SD Trough: 3-days (could be split into separate 1-2 day trips) |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
R/V Sproul is an ideal platform for working in local waters near San Diego. Some flexibility in schedule to suit variable timeline in instrument development, construction, and preparation is also desired. |
|
Short Description of Op Area
for use in schedules: |
San Diego |
Description of Op Area: |
San Diego Trough |
Op Area Size/Dia.: |
20 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
32° 30' N
/
117° 30' W
map
|
|
|
Ending
|
32° 30' N
/
117° 30' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
San Diego, CA, USA |
None, |
San Diego, CA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Jeffrey M. Babcock, SIO |
# in Science Party |
7 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
N/A |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|