  2012 - Atlantic Explorer  
2012 Atlantic Explorer Schedule
Final - ID #11219    Version #8 - 1/4/2013

Scheduling Contact(s)
Quentin M. Lewis marine^%^%^superintendent*%*%*bios^%^%^edu (646) 547-1788x208

  Notes:   Note#1: Due to the time of high tide and our operational restriction of being able to transit Ferry Reach Channel to and from BIOS only at high water, we attempt to provide departures at 0800 hrs from St. George's Harbor on days where the time of high water occurs after 1100 hrs, and arrivals at 1700 hrs into St George's Harbor when the time of high water occurs before 1400 hrs. This requires transits between the BIOS dock in Ferry Reach, and Pennos Wharf in St George's Harbor, on days before and after cruises. We CANNOT guarantee these re-position transits for every cruise because the dock in St. George's is not always available, as commercial shipping and other vessels paying for dockage have priority. These moves negatively impact mobilization and de-mobilization logistics, and so may also not be possible due to cruise scheduling or logistic requirements. 24 hrs of at-sea time ARE NOT possible on departure and arrival days. Be sure to plan accordingly when preparing grant requests and making ship time requests.
Note#2: The vessel will be at shipyard from 01-21 January, with a return to Bermuda on or about 24 January.

Three additional days were awarded to facilitate the Curry mooring recovery 03-06 Nov. This cruise met the R/V Knorr with Jason aboard offshore. Jason released the mooring and AE made the recovery.

Nov OFP cruise departed 23Nov as scheduled, but returned to St. Georges due to heavy sea conditions. Vessel laid over at St George's for two days and resumed cruise on 26 Nov, then returned to BIOS on 29 Nov.

Hydro cruise delayed by one day due to WX delay experienced by OFP cruise. Departed 29 Nov and returned 30 Nov.
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jan 2012
Dep:01 Jan 2012
Arr:21 Jan 2012
Unload:21 Jan 2012
 
Charleston, SC, USA
Charleston, SC, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
Maintenance
  0/0
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Shipyard visit: 5 year annual ABS inspections; Repairs and Maintenance (MOSA work) and additional required work.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:22 Jan 2012
Dep:22 Jan 2012
Arr:26 Jan 2012
Unload:26 Jan 2012
 
Charleston, SC, USA
St. George's, Bermuda
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
Transit
  4/4
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Return transit to Bermuda from Shipyard. No science scheduled at this time.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:27 Jan 2012
Dep:28 Jan 2012
Arr:01 Feb 2012
Unload:02 Feb 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Rod Johnson
  5/7
 
Project PI/Institution Project # Days/Agency/Status
The Bermuda Atlan Nicholas R. Bates/BIOS 0752366 4/NSF-OCE-CO/F
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 1/NSF-OCE-PO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:08 Feb 2012
Dep:09 Feb 2012
Arr:11 Feb 2012
Unload:13 Feb 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Rod Johnson
  3/5
 
Project PI/Institution Project # Days/Agency/Status
The Bermuda Atlan Nicholas R. Bates/BIOS 0752366 1/NSF-OCE-CO/F
tracer atmosphere David Kadko/FIU 1034746 1/NSF-OCE-CO/F
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 1/NSF-OCE-PO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:21 Feb 2012
Dep:22 Feb 2012
Arr:25 Feb 2012
Unload:27 Feb 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Bess B. Ward
  4/6
 
Project PI/Institution Project # Days/Agency/Status
Dimensions EukPhyto Bess B. Ward/Princeton 1136345 4/NSF-OCE-BIO/F
 
Notes: 26 February is a Transit/Reposition day

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Mar 2012
Dep:02 Mar 2012
Arr:03 Mar 2012
Unload:05 Mar 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Steven Bell
  1/3
 
Project PI/Institution Project # Days/Agency/Status
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 1/NSF-OCE-PO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Mar 2012
Dep:07 Mar 2012
Arr:11 Mar 2012
Unload:12 Mar 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Steven Bell
  5/7
 
Project PI/Institution Project # Days/Agency/Status
The Bermuda Atlan Nicholas R. Bates/BIOS 0752366 4/NSF-OCE-CO/F
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 1/NSF-OCE-PO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:13 Mar 2012
Dep:14 Mar 2012
Arr:23 Mar 2012
Unload:24 Mar 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Tammi Richardson
  10/12
 
Project PI/Institution Project # Days/Agency/Status
BATS Food web Tammi Richardson/SC 1030345 10/NSF-OCE-BIO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:27 Mar 2012
Dep:28 Mar 2012
Arr:30 Mar 2012
Unload:30 Mar 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  James Sadler
  3/5
 
Project PI/Institution Project # Days/Agency/Status
The Bermuda Atlan Nicholas R. Bates/BIOS 0752366 2/NSF-OCE-CO/F
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 1/NSF-OCE-PO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Apr 2012
Dep:07 Apr 2012
Arr:09 Apr 2012
Unload:09 Apr 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Maureen H. Conte
  3/9
 
Project PI/Institution Project # Days/Agency/Status
OFP Maureen H. Conte/BIOS 0927098 3/NSF-OCE-CO/F
 
Notes: Underway for sea on the 2nd

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Apr 2012
Dep:10 Apr 2012
Arr:15 Apr 2012
Unload:16 Apr 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Dafydd Evans
  6/8
 
Project PI/Institution Project # Days/Agency/Status
The Bermuda Atlan Nicholas R. Bates/BIOS 0752366 4/NSF-OCE-CO/F
Foram N isotope Daniel Sigman/Princeton 1060947 1/NSF-OCE-EDU/F
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 1/NSF-OCE-PO/F
Foram N isotope Daniel Sigman/Princeton 1060947 0/NSF-OCE-CO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:24 Apr 2012
Dep:25 Apr 2012
Arr:27 Apr 2012
Unload:28 Apr 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Dafydd Evans
  3/5
 
Project PI/Institution Project # Days/Agency/Status
The Bermuda Atlan Nicholas R. Bates/BIOS 0752366 2/NSF-OCE-CO/F
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 1/NSF-OCE-PO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:04 May 2012
Dep:06 May 2012
Arr:15 May 2012
Unload:16 May 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  David Black
  10/13
 
Project PI/Institution Project # Days/Agency/Status
BR particles David Black/SUNYSB 1061128 10/NSF-OCE-CO/F
 
Notes: AE will move to St George's on 5 May to spool new cable on the hydrowinch. R/V Knorr is transporting the new cable and spooler to BDA, arriving on the 4th. D Black cruise material from his container will be loaded at BIOS prior to the move over to St. George's. The Black cruise will complete mobilization in St. George's and depart from there 0800 on the 6th.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 May 2012
Dep:18 May 2012
Arr:23 May 2012
Unload:25 May 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Rod Johnson
  6/8
 
Project PI/Institution Project # Days/Agency/Status
The Bermuda Atlan Nicholas R. Bates/BIOS 0752366 4/NSF-OCE-CO/F
tracer atmosphere David Kadko/FIU 1034746 1/NSF-OCE-CO/F
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 1/NSF-OCE-PO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:25 May 2012
Dep:28 May 2012
Arr:05 Jun 2012
Unload:07 Jun 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Ruth Curry
  9/14
 
Project PI/Institution Project # Days/Agency/Status
DynAMITE Ruth Curry/WHOI 0926848 9/NSF-OCE-PO/F
 
Notes: DynAMITE mooring recoveries. May include a mid cruise turnaround in St. George's or BIOS.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Jun 2012
Dep:17 Jun 2012
Arr:21 Jun 2012
Unload:22 Jun 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Rod Johnson
  5/7
 
Project PI/Institution Project # Days/Agency/Status
The Bermuda Atlan Nicholas R. Bates/BIOS 0752366 4/NSF-OCE-CO/F
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 1/NSF-OCE-PO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:22 Jun 2012
Dep:23 Jun 2012
Arr:25 Jun 2012
Unload:26 Jun 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Craig A. Carlson
  2/4
 
Project PI/Institution Project # Days/Agency/Status
MO Collaborative Res Craig A. Carlson/UCSB 0801991 2/NSF-OCE-BIO/F
 
Notes: Underway for sea on the 23rd

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:28 Jun 2012
Dep:28 Jun 2012
Arr:29 Jun 2012
Unload:30 Jun 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  James Sadler
  1/3
 
Project PI/Institution Project # Days/Agency/Status
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 1/NSF-OCE-PO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Jul 2012
Dep:04 Jul 2012
Arr:08 Jul 2012
Unload:09 Jul 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Maureen H. Conte
  5/9
 
Project PI/Institution Project # Days/Agency/Status
OFP Maureen H. Conte/BIOS 0927098 5/NSF-OCE-CO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:10 Jul 2012
Dep:11 Jul 2012
Arr:16 Jul 2012
Unload:17 Jul 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  James Sadler
  6/8
 
Project PI/Institution Project # Days/Agency/Status
The Bermuda Atlan Nicholas R. Bates/BIOS 0752366 4/NSF-OCE-CO/F
Foram N isotope Daniel Sigman/Princeton 1060947 1/NSF-OCE-EDU/F
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 1/NSF-OCE-PO/F
Foram N isotope Daniel Sigman/Princeton 1060947 0/NSF-OCE-CO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:18 Jul 2012
Dep:19 Jul 2012
Arr:31 Jul 2012
Unload:01 Aug 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Tammi Richardson
  13/15
 
Project PI/Institution Project # Days/Agency/Status
BATS Food web Tammi Richardson/SC 1030345 13/NSF-OCE-BIO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Aug 2012
Dep:07 Aug 2012
Arr:10 Aug 2012
Unload:11 Aug 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Bess B. Ward
  4/6
 
Project PI/Institution Project # Days/Agency/Status
Dimensions EukPhyto Bess B. Ward/Princeton 1136345 4/NSF-OCE-BIO/F
 
Notes: August 11 (Saturday) de-mob day will required trucking of all science gear from this cruise to BIOS from Pennos Wharf in St. George's

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:12 Aug 2012
Dep:13 Aug 2012
Arr:13 Aug 2012
Unload:14 Aug 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Sam A. Monk
  1/3
 
Project PI/Institution Project # Days/Agency/Status
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 1/NSF-OCE-PO/F
 
Notes: Cruise will depart from Pennos Wharf, St. George's on Monday morning, August 13 at 0900 hrs and return to BIOS at 1800 hrs. Science gear/mobilization will be on Saturday the 11th, will all gear trucked from BIOS to St. George's in conjunction with de-mob of Ward cruise.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:18 Aug 2012
Dep:19 Aug 2012
Arr:28 Aug 2012
Unload:29 Aug 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Rod Johnson
  10/12
 
Project PI/Institution Project # Days/Agency/Status
The Bermuda Atlan Nicholas R. Bates/BIOS 0752366 4/NSF-OCE-CO/F
ZooN Pia Moisander/UMD - Biology 1130495 3/NSF-OCE-BIO/F
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 2/NSF-OCE-PO/F
tracer atmosphere David Kadko/FIU 1034746 1/NSF-OCE-CO/F
 
Notes: There will be a return to St. George's on 23 Aug for a change of science party and then an immediate return to sea. Dockside perhaps 2 hrs.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Sep 2012
Dep:11 Sep 2012
Arr:15 Sep 2012
Unload:17 Sep 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Rod Johnson
  5/7
 
Project PI/Institution Project # Days/Agency/Status
The Bermuda Atlan Nicholas R. Bates/BIOS 0752366 4/NSF-OCE-CO/F
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 1/NSF-OCE-PO/F
 
Notes: Vessel will return directly to BIOS on Saturday the 15th. Cruise departure was delayed a day due to Hurricane Leslie.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:18 Sep 2012
Dep:19 Sep 2012
Arr:20 Sep 2012
Unload:21 Sep 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Craig A. Carlson
  2/4
 
Project PI/Institution Project # Days/Agency/Status
MO Collaborative Res Craig A. Carlson/UCSB 0801991 2/NSF-OCE-BIO/F
 
Notes: 21 September will be a Transit/ Relocation day.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:22 Sep 2012
Dep:22 Sep 2012
Arr:22 Sep 2012
Unload:22 Sep 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
Out of Service
  0/0
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: BIOS MARINE SCIENCE DAY. Institution open house for the public.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:23 Sep 2012
Dep:24 Sep 2012
Arr:24 Sep 2012
Unload:24 Sep 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  James Sadler
  1/2
 
Project PI/Institution Project # Days/Agency/Status
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 1/NSF-OCE-PO/F
 
Notes: This is an overnight HYDRO cruise returning to Pennos Wharf, St. George's on 25 September. The vessel will depart the morning of the 26th with the BATS/Validation cruise for Puerto Rico.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:23 Sep 2012
Dep:25 Sep 2012
Arr:12 Oct 2012
Unload:13 Oct 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Michael W. Lomas
  18/20
 
Project PI/Institution Project # Days/Agency/Status
The Bermuda Atlan Nicholas R. Bates/BIOS 0752366 15/NSF-OCE-CO/F
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 2/NSF-OCE-PO/F
Sharpening Geochemic Rachel Stanley/Wellesley College 1029676 1/NSF-OCE-CO/F
 
Notes: This cruise departs BIOS on the 24th with the Oxford group and returns to St. Georges on the 25th to disembark Oxford, embark BATS and immediately depart for sea en-route to Puerto Rico.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:15 Oct 2012
Dep:15 Oct 2012
Arr:16 Oct 2012
Unload:16 Oct 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Steven Bell
NSF Inspec
  1/1
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Oct 2012
Dep:18 Oct 2012
Arr:22 Oct 2012
Unload:23 Oct 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Rod Johnson
  5/7
 
Project PI/Institution Project # Days/Agency/Status
The Bermuda Atlan Nicholas R. Bates/BIOS 0752366 4/NSF-OCE-CO/F
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 1/NSF-OCE-PO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Oct 2012
Dep:31 Oct 2012
Arr:02 Nov 2012
Unload:02 Nov 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Sam A. Monk
  2/3
 
Project PI/Institution Project # Days/Agency/Status
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 2/NSF-OCE-PO/F
 
Notes: Overnight Hydro cruise. BIOS to BIOS

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Nov 2012
Dep:03 Nov 2012
Arr:07 Nov 2012
Unload:08 Nov 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Ruth Curry
  5/7
 
Project PI/Institution Project # Days/Agency/Status
DynAMITE Ruth Curry/WHOI 0926848 4/NSF-OCE-PO/F
 
Notes: DynAMITE mooring recovery. Three additional ship days have been requested to organize a transit to the mooring site, where Atlantic Explorer will rendezvous with Knorr/Jason (during transit from Azores to Florida) to rescue one of the moorings. Jason will find and cut the mooring below the failed acoustic release . AE will recover the mooring when it surfaces and return to Bermuda. AE will depart from Bermuda at 1130 hrs 03 Nov and arrive on site by 2230 hrs 04 Nov. Recovery on 05 Nov and return to Bermuda likely to be 07 Nov, which will be an extra day, if it is needed.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:12 Nov 2012
Dep:13 Nov 2012
Arr:18 Nov 2012
Unload:19 Nov 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Rod Johnson
  6/8
 
Project PI/Institution Project # Days/Agency/Status
The Bermuda Atlan Nicholas R. Bates/BIOS 0752366 4/NSF-OCE-CO/F
Foram N isotope Daniel Sigman/Princeton 1060947 1/NSF-OCE-EDU/F
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 1/NSF-OCE-PO/F
Foram N isotope Daniel Sigman/Princeton 1060947 0/NSF-OCE-CO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 Nov 2012
Dep:23 Nov 2012
Arr:28 Nov 2012
Unload:28 Nov 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Maureen H. Conte
  4/8
 
Project PI/Institution Project # Days/Agency/Status
OFP Maureen H. Conte/BIOS 0927098 4/NSF-OCE-CO/F
 
Notes: This cruise will begin mobilization on 20 November, prior to the two day HYDRO trip departing 23 November. OFP cruise departs on the 25th

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:28 Nov 2012
Dep:29 Nov 2012
Arr:30 Nov 2012
Unload:01 Dec 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Steven Bell
  2/4
 
Project PI/Institution Project # Days/Agency/Status
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 2/NSF-OCE-PO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Dec 2012
Dep:10 Dec 2012
Arr:15 Dec 2012
Unload:17 Dec 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
 
 
 
 
 
0N/0E
0N/0E
 
  Steven Bell
  6/8
 
Project PI/Institution Project # Days/Agency/Status
The Bermuda Atlan Nicholas R. Bates/BIOS 0752366 4/NSF-OCE-CO/F
Hydrostation S 59-64 Nicholas R. Bates/BIOS 1153693 2/NSF-OCE-PO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Dec 2012
Dep:17 Dec 2012
Arr:31 Dec 2012
Unload:31 Dec 2012
 
St. George's, Bermuda
St. George's, Bermuda
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
Maintenance
  0/0
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Maintenance dockside in Bermuda: Will include inspection, repair and service of all safety equipment
Agency   Funded   Pending   Total
NSF   170   0   170
Total  170 0 170
<
<