View Schedule

or schedule as:
the schedule as:
  2016 - Neil Armstrong  
Version 14
Final - ID #13054    Version #3 - 1/3/2017

Scheduling Contact(s)
Kerry Strom kstrom*%*%*whoi^%^%^edu (508) 289-3938

  Notes:   11/4: Charleston nominated for drydock. Amended transit time.
10/20: 9 Oct was a charged weather day and 17 Oct a special charged demobe day due to extended gap between legs 1 & 2 per agreement with OOI 18 Oct 2016.
10/3: SVC VII Cancelled
8/16: Shifted OOI Pioneer 4 days earlier to start 9/27.
8/3/16: G. Tupper OOI Irminger early arrival Reykjavik July 26.
6/1: OOI Pioneer arrival one day early. No change in charge days.
5/31: Added 1 SVC days for SVC VI - Lawson and 2 SVC days for SVC VIII (tbd).
4/13: Updated departure for SVC III to April 2 - April 6. and changed Ch Sci to Y.T. Lin
3/2/16: 1) Reconfigured OOI Pioneer spring cruise legs. (2) Swapped number of sea days for SVC V and SVC VI. (3) SVC VII Nov 4 - Nov 14. Added Ch Scientists to SVC V & VI.
2/12/16: 1) Changed SVC V to June 10 - 16. (2) Changed SVC VI to June 20 - 24. (3) Shifted OOI Irminger back to June 30 - July 28. (4) Shifted Pickart / OSNAP back to Aug 3 to Sept 8.
2/9/16: Moved DC port call to November. Added Norfolk Va port call ending SVC II. SVC IV moved after UNOLS inspection. Added 1 sci day to SVC IV.
Added non op transit to warranty shipyard / period into 2017. We have 12 shakedown days not used or rescheduled yet 2/9/16).
1/27: 1) Feb 9 - 17 is now NAVY/WHOI acceptance trials - Non Op.
2)Removed "Shakedown 3". Shakedown 2 is now for AUTEC.
3) Added Washingont D.C. (Alexandria VA) port call March 29 - 31
4) Shifted SVC III to April 4/2 - 4/7.
5) SVC IV moved after UNOLS inspection w/ ROV component testing
6) OOI "Pioneer 6" moved to May 13 - June 7 (3 legs).
7) OOI Irminger Sea moved to July 8 - Aug 5
8) ONSAP/Pickart moved to Aug 11 -Sept 16.
9) OOI "Pioneer 7" moved earlier to Oct 10 - Oct 23 (3 legs).
10) Added SVC VIII from old shakedown 2 that was taken up by acceptance trials.
1/5/16:
1) Added AUTEC range into Shakedown 2
2) Scheduled March 27-31 Washington DC port call.
3) Swapped Maintenance period ahead of NSF/NAVSEA/UNOLS inspection
4) SVC IV after inspection w/ ROV test prior to funded OOI cruise
12/22: Corrected SVC III to 10 charge days (not 9). Corrected OOI May 7 - 16 charge days to 10 (not 8).
12/9/15: Removed 2015 portion.
10/8: San Fransisco departure moved ahead 1 day to Nov 10, 2015. 2016 Operating days 204.
9/23/15: Published schedule
- Charleston SC used as a placeholder only. Location for Phase III yard TBD.
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jan 2016
Dep:01 Jan 2016
Arr:05 Feb 2016
Unload:05 Feb 2016
 
Charleston, SC, USA
Charleston, SC, USA
 
yard/
NP09
NP09
 
 
 
48N/122W
48N/122W
 
  Albert Suchy
Shipyard
  36/36

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
PHASE III Fit Out Not Specified 36/NAVY/NonOp
 
Notes: Phase III Science Mission Equipment installation and trials Dec 3 - Feb 5; 65 days Phase III

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Feb 2016
Dep:10 Feb 2016
Arr:17 Feb 2016
Unload:18 Feb 2016
 
Charleston, SC, USA
Charleston, SC, USA
 
east coast/
NA06
NA06
 
 
 
32N/77W
32N/77W
 
  None /transit
  8/13

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Mission Accpt Trial Not Specified 0/NAVY/NonOp
S.A.T. / H.A.T. Not Specified 0/OTHER/NonOp
 
Notes: departed 2/10 due to weather. Acceptance trials for installed acoustic equip. and HAT / SAT / DP operations. Vessel will depart and arrive depending on vendor needs.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Feb 2016
Dep:24 Feb 2016
Arr:01 Mar 2016
Unload:02 Mar 2016
 
Charleston, SC, USA
Charleston, SC, USA
 
Bahamas/
NA06
NA06
 
 
 
32N/77W
32N/77W
 
  None /transit
  7/13

Clearances: NONE(A)
 
Project PI/Institution Project # Days/Agency/Status
Shakedown 2 Not Specified 13/NAVY-ONR/F
AUTEC RANGE Not Specified 0/OTHER/P
 
Notes: 2/2/16: Navy scheduled Feb 27 for Armstrong. This would be a sonar acoustic test. 2 days on site. 490nm Char to Autec range = 3 days transit (6 RT) + 2 sci = 8 days at sea During transits the following may be tested and checked, but not limited to: Multibeam ADCP Lab van and Rad van set up. Lab set ups and flow through systems Computer systems

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:03 Mar 2016
Dep:05 Mar 2016
Arr:12 Mar 2016
Unload:13 Mar 2016
 
Charleston, SC, USA
Charleston, SC, USA
 
E.Coast Shelf/
NA06
NA06
 
 
 
32N/77W
32N/77W
 
  Tammi Richardson
  8/11

Clearances: NONE(T)

Ancil Facs: Portable Winch
 
Project PI/Institution Project # Days/Agency/Status
Sci Verification I Douglas Nowacek/DUML Not Specified 11/NAVY-ONR/F
Mooring/CTD/Gliders Not Specified 0/OTHER/P
 
Notes: 6 testing days for: (3 transit days + 6 science days total) Mooring deployment, CTD sampling, glider deployment & recovery Underway systems will be run and tested throughout voyage including mulitbeam. TSE winch from ECWP

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Mar 2016
Dep:16 Mar 2016
Arr:27 Mar 2016
Unload:28 Mar 2016
 
Charleston, SC, USA
Norfolk, VA, USA
 
E.Coast Shelf/
NA06
NA06
 
 
 
32N/77W
32N/77W
 
  David R. Corbett
  12/15

Clearances: NONE(T)

Ancil Facs: Radioisotope Lab Van
 
Project PI/Institution Project # Days/Agency/Status
Sci Verification II David R. Corbett/ECU Not Specified 15/NAVY-ONR/F
East. Carolina U. Not Specified 0/OTHER/F
 
Notes: Washington D.C. Port Call will be in Alexandria VA - Robinson Terminal Sci Ver + transit to Alexandria VA. 8 transit days + 3 Sci days.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:29 Mar 2016
Dep:02 Apr 2016
Arr:06 Apr 2016
Unload:07 Apr 2016
 
Norfolk, VA, USA
Woods Hole, MA, USA
 
E.Coast Shelf/
NA06
NA06
 
 
 
32N/77W
42N/71W
 
  Andrew Armstrong
  5/10

Clearances: NONE(T)

Ancil Facs: Portable Winch
 
Project PI/Institution Project # Days/Agency/Status
Sci Verification III Ying-Tsong Lin/WHOI Not Specified 9/NAVY-ONR/F
Mulitbeam/Mrng rcvy Not Specified 0/OTHER/F
 
Notes: Along Shelf, 2 transit days for UNH survey line. Pioneer profiler float and anchor recovery 2 days Y.T. Lin acoustic moorings deploy/recvy 2 nights

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Apr 2016
Dep:07 Apr 2016
Arr:24 Apr 2016
Unload:24 Apr 2016
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
WHOI/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  None /transit
Maintenance
  18/18

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:25 Apr 2016
Dep:25 Apr 2016
Arr:29 Apr 2016
Unload:29 Apr 2016
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
Vineyard Sound/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  None /transit
NSF Inspec
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Final Accept. Trials Not Specified 0/NAVY/NonOp
NSF/INSURV Inspn Not Specified 0/INST-WHOI/NonOp
 
Notes: Plan is to combine the UNOLS, JMS/NSF inspection with the Navy INSURV At Sea Day April 27.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Apr 2016
Dep:02 May 2016
Arr:09 May 2016
Unload:10 May 2016
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
Vineyard Sound/
NA06
NA06
 
 
 
42N/71W
42N/71W
 
  Timothy M. Shank
  8/11

Clearances: NONE(T)

Ancil Facs: Other ROV
 
Project PI/Institution Project # Days/Agency/Status
Sci Ver IV Timothy M. Shank/WHOI Not Specified 8/NAVY-ONR/F
UCONN ROV Not Specified 0/OTHER/P
 
Notes: ROV testing with UCONN Kraken 2/9: Added 1 day; 6 sci days + 2 transit days

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:10 May 2016
Dep:12 May 2016
Arr:15 May 2016
Unload:16 May 2016
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
NE shelf/
NA06
NA06
 
 
 
39N/69W
41N/71W
 
  Al Plueddemann
  4/7

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI Pioneer Al Plueddemann/WHOI Not Specified 4/NSF-OOI-OOI/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 May 2016
Dep:17 May 2016
Arr:24 May 2016
Unload:24 May 2016
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
NE shelf/
NA06
NA06
 
 
 
39N/69W
41N/71W
 
  Al Plueddemann
  8/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI Pioneer Al Plueddemann/WHOI Not Specified 8/NSF-OOI-OOI/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:25 May 2016
Dep:26 May 2016
Arr:01 Jun 2016
Unload:03 Jun 2016
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
NE shelf/
NA06
NA06
 
 
 
39N/69W
41N/71W
 
  Al Plueddemann
  7/10

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI Pioneer Al Plueddemann/WHOI Not Specified 8/NSF-OOI-OOI/F
 
Notes: Ended leg 3 one day early. OOI still responsible for the full 8 days (can charge one demobe day June 2).

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Jun 2016
Dep:09 Jun 2016
Arr:13 Jun 2016
Unload:14 Jun 2016
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
NE shelf/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  Rob Evans
  5/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Sci Ver V Rob Evans/WHOI Not Specified 5/NAVY-ONR/F
Geophysical Not Specified 0/OTHER/P
 
Notes: CTD ops, corring, multibeam night ops, xbt's, All underway equipment will be running tested. 5 Sci + 2 Transit

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:16 Jun 2016
Dep:17 Jun 2016
Arr:23 Jun 2016
Unload:25 Jun 2016
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
E. Coast shelf/
NA06
NA06
 
 
 
40N/70W
40N/70W
 
  Gareth Lawson
  7/10

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Sci Ver VI Gareth Lawson/WHOI Not Specified 7/NAVY-ONR/F
Biophysical Not Specified 0/OTHER/P
 
Notes: 6/13 - changed departure day from 16th to 17th 5/31 - added 1 SVC day for EK80 calibration.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:27 Jun 2016
Dep:30 Jun 2016
Arr:26 Jul 2016
Unload:30 Jul 2016
 
Woods Hole, MA, USA
Reykjavik, Iceland
 
Irminger Sea/
NA01
NA01
 
 
 
60N/39W
60N/39W
 
  George H. Tupper
  27/34

Clearances: Greenland(S)

Ancil Facs: Portable Winch
 
Project PI/Institution Project # Days/Agency/Status
OOI Irminger Sea Weller OOI Project Team/WHOI Not Specified 31/NSF-OOI-OOI/F
 
Notes: OOI Irminger year 3 turnaround 8 days transit to site 542nm from site to Reyk. = 3 days 11 total transit days.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:31 Jul 2016
Dep:03 Aug 2016
Arr:07 Sep 2016
Unload:09 Sep 2016
 
Reykjavik, Iceland
St. John's, Canada
 
Irm/Lab Seas/
NA04
NA04
 
 
 
59N/30W
52N/53W
 
  Robert S. Pickart
  36/41

Clearances: Canada(T), Denmark(T)
 
Project PI/Institution Project # Days/Agency/Status
OSNAP-West Robert S. Pickart/WHOI 1259618 41/NSF-OCE-PO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:10 Sep 2016
Dep:10 Sep 2016
Arr:14 Sep 2016
Unload:16 Sep 2016
 
St. John's, Canada
Woods Hole, MA, USA
 
transit/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  None /transit
Transit
  5/7

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Transit Not Specified 5/NSF-OCE-PO/F
 
Notes: 2 days demobe at WHOI are no charge. Need to move off two large programs.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:25 Sep 2016
Dep:27 Sep 2016
Arr:05 Oct 2016
Unload:05 Oct 2016
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
NE shelf/
NA06
NA06
 
 
 
39N/69W
41N/71W
 
  Al Plueddemann
  9/11

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI Pioneer Al Plueddemann/WHOI Not Specified 9/NSF-OOI-OOI/F
 
Notes: 9/01: "From our Sr. Program Director we can confirm that the AUV's used on the OOI Pioneer cruise (and other cruises) do not fall under ITAR."

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Oct 2016
Dep:09 Oct 2016
Arr:17 Oct 2016
Unload:17 Oct 2016
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
NE shelf/
NA06
NA06
 
 
 
39N/69W
41N/71W
 
  Al Plueddemann
  9/12

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI Pioneer Al Plueddemann/WHOI Not Specified 9/NSF-OOI-OOI/F
 
Notes: 10/20: 9 Oct was a charged weather day and 17 Oct a special charged demobe day due to extended gap between legs 1 & 2 per agreement with OOI 18 Oct 2016.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Nov 2016
Dep:14 Nov 2016
Arr:17 Nov 2016
Unload:17 Nov 2016
 
Woods Hole, MA, USA
Charleston, SC, USA
 
Testing/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  Tim Schnoor
  4/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
SSSG Shipboard Test Tim Schnoor/ONR Not Specified 4/NAVY/F
 
Notes: Testing Gyro Syetems Kongsberg Tech to upgrade AM710 3.3 days to Charleston SC NYC to Tampa = 1,405nm = 6 days transit - TAMPA Used as Placeholder ONLY

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:18 Nov 2016
Dep:18 Nov 2016
Arr:15 Feb 2017
Unload:15 Feb 2017
 
Charleston, SC, USA
Charleston, SC, USA
 
TBD/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  None /transit
Shipyard
  90/90

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Warranty Dry Docking Not Specified 44/NAVY-ONR/NonOp
 
Notes: Requires 83 days
Agency   Funded   Pending   Total
NAVY   72   0   72
NSF   46   0   46
NSF-OOI   69   0   69
OTHER   0   0   0
Total  187 0 187
<
<