Ship Time Request System
Search Public Records
Funded Projects
Funded Requests
Published Schedules
Search Funded Projects/Requests
All Ports
All Ancillary Facilities
UNOLS Equipment Inventory
All Ships
Help
Suggestions/Request Help
Frequently Asked Questions
Log In
View Schedule
or
schedule as:
Expanded (Text)
Condensed (Text)
Expanded (PDF)
Send schedule email to:
Note for recipient(s):
the schedule as:
Excel XML
CSV
Google Earth Map (KML)
ICal Calendar
2016
-
Neil Armstrong
Version 14
Final
- ID #
13054
Version #
3
-
1/3/2017
Scheduling Contact(s)
Kerry Strom
kstrom*%*%*whoi^%^%^edu
(508) 289-3938
Notes:
11/4: Charleston nominated for drydock. Amended transit time.
10/20: 9 Oct was a charged weather day and 17 Oct a special charged demobe day due to extended gap between legs 1 & 2 per agreement with OOI 18 Oct 2016.
10/3: SVC VII Cancelled
8/16: Shifted OOI Pioneer 4 days earlier to start 9/27.
8/3/16: G. Tupper OOI Irminger early arrival Reykjavik July 26.
6/1: OOI Pioneer arrival one day early. No change in charge days.
5/31: Added 1 SVC days for SVC VI - Lawson and 2 SVC days for SVC VIII (tbd).
4/13: Updated departure for SVC III to April 2 - April 6. and changed Ch Sci to Y.T. Lin
3/2/16: 1) Reconfigured OOI Pioneer spring cruise legs. (2) Swapped number of sea days for SVC V and SVC VI. (3) SVC VII Nov 4 - Nov 14. Added Ch Scientists to SVC V & VI.
2/12/16: 1) Changed SVC V to June 10 - 16. (2) Changed SVC VI to June 20 - 24. (3) Shifted OOI Irminger back to June 30 - July 28. (4) Shifted Pickart / OSNAP back to Aug 3 to Sept 8.
2/9/16: Moved DC port call to November. Added Norfolk Va port call ending SVC II. SVC IV moved after UNOLS inspection. Added 1 sci day to SVC IV.
Added non op transit to warranty shipyard / period into 2017. We have 12 shakedown days not used or rescheduled yet 2/9/16).
1/27: 1) Feb 9 - 17 is now NAVY/WHOI acceptance trials - Non Op.
2)Removed "Shakedown 3". Shakedown 2 is now for AUTEC.
3) Added Washingont D.C. (Alexandria VA) port call March 29 - 31
4) Shifted SVC III to April 4/2 - 4/7.
5) SVC IV moved after UNOLS inspection w/ ROV component testing
6) OOI "Pioneer 6" moved to May 13 - June 7 (3 legs).
7) OOI Irminger Sea moved to July 8 - Aug 5
8) ONSAP/Pickart moved to Aug 11 -Sept 16.
9) OOI "Pioneer 7" moved earlier to Oct 10 - Oct 23 (3 legs).
10) Added SVC VIII from old shakedown 2 that was taken up by acceptance trials.
1/5/16:
1) Added AUTEC range into Shakedown 2
2) Scheduled March 27-31 Washington DC port call.
3) Swapped Maintenance period ahead of NSF/NAVSEA/UNOLS inspection
4) SVC IV after inspection w/ ROV test prior to funded OOI cruise
12/22: Corrected SVC III to 10 charge days (not 9). Corrected OOI May 7 - 16 charge days to 10 (not 8).
12/9/15: Removed 2015 portion.
10/8: San Fransisco departure moved ahead 1 day to Nov 10, 2015. 2016 Operating days 204.
9/23/15: Published schedule
- Charleston SC used as a placeholder only. Location for Phase III yard TBD.
View Summary
Set Default
Associated Cruises
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
01 Jan 2016
Dep:
01 Jan 2016
Arr:
05 Feb 2016
Unload:
05 Feb 2016
Charleston, SC, USA
Charleston, SC, USA
yard/
NP09
NP09
48N/122W
48N/122W
Albert Suchy
Shipyard
36/36
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
PHASE III Fit Out
Not Specified
36/NAVY/NonOp
Notes:
Phase III Science Mission Equipment installation and trials Dec 3 - Feb 5; 65 days Phase III
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
06 Feb 2016
Dep:
10 Feb 2016
Arr:
17 Feb 2016
Unload:
18 Feb 2016
Charleston, SC, USA
Charleston, SC, USA
east coast/
NA06
NA06
32N/77W
32N/77W
None /transit
8/13
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Mission Accpt Trial
Not Specified
0/NAVY/NonOp
S.A.T. / H.A.T.
Not Specified
0/OTHER/NonOp
Notes:
departed 2/10 due to weather. Acceptance trials for installed acoustic equip. and HAT / SAT / DP operations. Vessel will depart and arrive depending on vendor needs.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
19 Feb 2016
Dep:
24 Feb 2016
Arr:
01 Mar 2016
Unload:
02 Mar 2016
Charleston, SC, USA
Charleston, SC, USA
Bahamas/
NA06
NA06
32N/77W
32N/77W
None /transit
7/13
Clearances:
NONE(A)
Project
PI/Institution
Project #
Days/Agency/Status
Shakedown 2
Not Specified
13/NAVY-ONR/F
AUTEC RANGE
Not Specified
0/OTHER/P
Notes:
2/2/16: Navy scheduled Feb 27 for Armstrong. This would be a sonar acoustic test. 2 days on site. 490nm Char to Autec range = 3 days transit (6 RT) + 2 sci = 8 days at sea During transits the following may be tested and checked, but not limited to: Multibeam ADCP Lab van and Rad van set up. Lab set ups and flow through systems Computer systems
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
03 Mar 2016
Dep:
05 Mar 2016
Arr:
12 Mar 2016
Unload:
13 Mar 2016
Charleston, SC, USA
Charleston, SC, USA
E.Coast Shelf/
NA06
NA06
32N/77W
32N/77W
Tammi Richardson
8/11
Clearances:
NONE(T)
Ancil Facs:
Portable Winch
Project
PI/Institution
Project #
Days/Agency/Status
Sci Verification I
Douglas Nowacek
/
DUML
Not Specified
11/NAVY-ONR/F
Mooring/CTD/Gliders
Not Specified
0/OTHER/P
Notes:
6 testing days for: (3 transit days + 6 science days total) Mooring deployment, CTD sampling, glider deployment & recovery Underway systems will be run and tested throughout voyage including mulitbeam. TSE winch from ECWP
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Mar 2016
Dep:
16 Mar 2016
Arr:
27 Mar 2016
Unload:
28 Mar 2016
Charleston, SC, USA
Norfolk, VA, USA
E.Coast Shelf/
NA06
NA06
32N/77W
32N/77W
David R. Corbett
12/15
Clearances:
NONE(T)
Ancil Facs:
Radioisotope Lab Van
Project
PI/Institution
Project #
Days/Agency/Status
Sci Verification II
David R. Corbett
/
ECU
Not Specified
15/NAVY-ONR/F
East. Carolina U.
Not Specified
0/OTHER/F
Notes:
Washington D.C. Port Call will be in Alexandria VA - Robinson Terminal Sci Ver + transit to Alexandria VA. 8 transit days + 3 Sci days.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
29 Mar 2016
Dep:
02 Apr 2016
Arr:
06 Apr 2016
Unload:
07 Apr 2016
Norfolk, VA, USA
Woods Hole, MA, USA
E.Coast Shelf/
NA06
NA06
32N/77W
42N/71W
Andrew Armstrong
5/10
Clearances:
NONE(T)
Ancil Facs:
Portable Winch
Project
PI/Institution
Project #
Days/Agency/Status
Sci Verification III
Ying-Tsong Lin
/
WHOI
Not Specified
9/NAVY-ONR/F
Mulitbeam/Mrng rcvy
Not Specified
0/OTHER/F
Notes:
Along Shelf, 2 transit days for UNH survey line. Pioneer profiler float and anchor recovery 2 days Y.T. Lin acoustic moorings deploy/recvy 2 nights
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
07 Apr 2016
Dep:
07 Apr 2016
Arr:
24 Apr 2016
Unload:
24 Apr 2016
Woods Hole, MA, USA
Woods Hole, MA, USA
WHOI/
SA02
SA02
0N/0E
0N/0E
None /transit
Maintenance
18/18
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
25 Apr 2016
Dep:
25 Apr 2016
Arr:
29 Apr 2016
Unload:
29 Apr 2016
Woods Hole, MA, USA
Woods Hole, MA, USA
Vineyard Sound/
SA02
SA02
0N/0E
0N/0E
None /transit
NSF Inspec
5/5
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Final Accept. Trials
Not Specified
0/NAVY/NonOp
NSF/INSURV Inspn
Not Specified
0/INST-WHOI/NonOp
Notes:
Plan is to combine the UNOLS, JMS/NSF inspection with the Navy INSURV At Sea Day April 27.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
30 Apr 2016
Dep:
02 May 2016
Arr:
09 May 2016
Unload:
10 May 2016
Woods Hole, MA, USA
Woods Hole, MA, USA
Vineyard Sound/
NA06
NA06
42N/71W
42N/71W
Timothy M. Shank
8/11
Clearances:
NONE(T)
Ancil Facs:
Other ROV
Project
PI/Institution
Project #
Days/Agency/Status
Sci Ver IV
Timothy M. Shank
/
WHOI
Not Specified
8/NAVY-ONR/F
UCONN ROV
Not Specified
0/OTHER/P
Notes:
ROV testing with UCONN Kraken 2/9: Added 1 day; 6 sci days + 2 transit days
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
10 May 2016
Dep:
12 May 2016
Arr:
15 May 2016
Unload:
16 May 2016
Woods Hole, MA, USA
Woods Hole, MA, USA
NE shelf/
NA06
NA06
39N/69W
41N/71W
Al Plueddemann
4/7
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
OOI Pioneer
Al Plueddemann
/
WHOI
Not Specified
4/NSF-OOI-OOI/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
17 May 2016
Dep:
17 May 2016
Arr:
24 May 2016
Unload:
24 May 2016
Woods Hole, MA, USA
Woods Hole, MA, USA
NE shelf/
NA06
NA06
39N/69W
41N/71W
Al Plueddemann
8/8
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
OOI Pioneer
Al Plueddemann
/
WHOI
Not Specified
8/NSF-OOI-OOI/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
25 May 2016
Dep:
26 May 2016
Arr:
01 Jun 2016
Unload:
03 Jun 2016
Woods Hole, MA, USA
Woods Hole, MA, USA
NE shelf/
NA06
NA06
39N/69W
41N/71W
Al Plueddemann
7/10
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
OOI Pioneer
Al Plueddemann
/
WHOI
Not Specified
8/NSF-OOI-OOI/F
Notes:
Ended leg 3 one day early. OOI still responsible for the full 8 days (can charge one demobe day June 2).
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
07 Jun 2016
Dep:
09 Jun 2016
Arr:
13 Jun 2016
Unload:
14 Jun 2016
Woods Hole, MA, USA
Woods Hole, MA, USA
NE shelf/
SA02
SA02
0N/0E
0N/0E
Rob Evans
5/8
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Sci Ver V
Rob Evans
/
WHOI
Not Specified
5/NAVY-ONR/F
Geophysical
Not Specified
0/OTHER/P
Notes:
CTD ops, corring, multibeam night ops, xbt's, All underway equipment will be running tested. 5 Sci + 2 Transit
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
16 Jun 2016
Dep:
17 Jun 2016
Arr:
23 Jun 2016
Unload:
25 Jun 2016
Woods Hole, MA, USA
Woods Hole, MA, USA
E. Coast shelf/
NA06
NA06
40N/70W
40N/70W
Gareth Lawson
7/10
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Sci Ver VI
Gareth Lawson
/
WHOI
Not Specified
7/NAVY-ONR/F
Biophysical
Not Specified
0/OTHER/P
Notes:
6/13 - changed departure day from 16th to 17th 5/31 - added 1 SVC day for EK80 calibration.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
27 Jun 2016
Dep:
30 Jun 2016
Arr:
26 Jul 2016
Unload:
30 Jul 2016
Woods Hole, MA, USA
Reykjavik, Iceland
Irminger Sea/
NA01
NA01
60N/39W
60N/39W
George H. Tupper
27/34
Clearances:
Greenland(S)
Ancil Facs:
Portable Winch
Project
PI/Institution
Project #
Days/Agency/Status
OOI Irminger Sea
Weller OOI Project Team
/
WHOI
Not Specified
31/NSF-OOI-OOI/F
Notes:
OOI Irminger year 3 turnaround 8 days transit to site 542nm from site to Reyk. = 3 days 11 total transit days.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
31 Jul 2016
Dep:
03 Aug 2016
Arr:
07 Sep 2016
Unload:
09 Sep 2016
Reykjavik, Iceland
St. John's, Canada
Irm/Lab Seas/
NA04
NA04
59N/30W
52N/53W
Robert S. Pickart
36/41
Clearances:
Canada(T), Denmark(T)
Project
PI/Institution
Project #
Days/Agency/Status
OSNAP-West
Robert S. Pickart
/
WHOI
1259618
41/NSF-OCE-PO/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
10 Sep 2016
Dep:
10 Sep 2016
Arr:
14 Sep 2016
Unload:
16 Sep 2016
St. John's, Canada
Woods Hole, MA, USA
transit/
SA02
SA02
0N/0E
0N/0E
None /transit
Transit
5/7
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Transit
Not Specified
5/NSF-OCE-PO/F
Notes:
2 days demobe at WHOI are no charge. Need to move off two large programs.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
25 Sep 2016
Dep:
27 Sep 2016
Arr:
05 Oct 2016
Unload:
05 Oct 2016
Woods Hole, MA, USA
Woods Hole, MA, USA
NE shelf/
NA06
NA06
39N/69W
41N/71W
Al Plueddemann
9/11
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
OOI Pioneer
Al Plueddemann
/
WHOI
Not Specified
9/NSF-OOI-OOI/F
Notes:
9/01: "From our Sr. Program Director we can confirm that the AUV's used on the OOI Pioneer cruise (and other cruises) do not fall under ITAR."
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
06 Oct 2016
Dep:
09 Oct 2016
Arr:
17 Oct 2016
Unload:
17 Oct 2016
Woods Hole, MA, USA
Woods Hole, MA, USA
NE shelf/
NA06
NA06
39N/69W
41N/71W
Al Plueddemann
9/12
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
OOI Pioneer
Al Plueddemann
/
WHOI
Not Specified
9/NSF-OOI-OOI/F
Notes:
10/20: 9 Oct was a charged weather day and 17 Oct a special charged demobe day due to extended gap between legs 1 & 2 per agreement with OOI 18 Oct 2016.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Nov 2016
Dep:
14 Nov 2016
Arr:
17 Nov 2016
Unload:
17 Nov 2016
Woods Hole, MA, USA
Charleston, SC, USA
Testing/
SA02
SA02
0N/0E
0N/0E
Tim Schnoor
4/4
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
SSSG Shipboard Test
Tim Schnoor
/
ONR
Not Specified
4/NAVY/F
Notes:
Testing Gyro Syetems Kongsberg Tech to upgrade AM710 3.3 days to Charleston SC NYC to Tampa = 1,405nm = 6 days transit - TAMPA Used as Placeholder ONLY
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
18 Nov 2016
Dep:
18 Nov 2016
Arr:
15 Feb 2017
Unload:
15 Feb 2017
Charleston, SC, USA
Charleston, SC, USA
TBD/
SA02
SA02
0N/0E
0N/0E
None /transit
Shipyard
90/90
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Warranty Dry Docking
Not Specified
44/NAVY-ONR/NonOp
Notes:
Requires 83 days
Agency
Funded
Pending
Total
NAVY
72
0
72
NSF
46
0
46
NSF-OOI
69
0
69
OTHER
0
0
0
Total
187
0
187
<
<