Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 01 Jan 2019 |
Dep: | 01 Jan 2019 |
Arr: | 31 Jan 2019 |
Unload: | 31 Jan 2019 |
|
|
|
|
|
|
|
|
Doug Russell
Overhaul or Repair
|
|
31/31
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
Engine Repairs
|
Doug Russell/UW
|
Not Specified
|
0/INST-UW/F
|
|
|
Notes: Engine repairs |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 01 Feb 2019 |
Dep: | 01 Feb 2019 |
Arr: | 16 Feb 2019 |
Unload: | 16 Feb 2019 |
|
|
|
|
|
|
|
|
Doug Russell
Transit Cruise
|
|
16/16
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
Reposition to S.A.
|
Doug Russell/UW
|
Not Specified
|
8/NSF-OCE-PO/F
|
Reposition to S.A.
|
Doug Russell/UW
|
Not Specified
|
8/NSF-OCE-MGG/F
|
|
|
Notes: TN-364 |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 17 Feb 2019 |
Dep: | 21 Feb 2019 |
Arr: | 28 Mar 2019 |
Unload: | 29 Mar 2019 |
|
|
|
|
|
|
|
|
Henry J. Dick
|
|
36/41
|
Clearances: South Africa(A), NONE(A) |
Ancil Facs: Sentry |
|
|
|
Notes: TN-365
Updated funding due to incorrectly linked STR |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 30 Mar 2019 |
Dep: | 03 Apr 2019 |
Arr: | 14 May 2019 |
Unload: | 16 May 2019 |
|
|
|
|
|
|
|
|
Alejandro Orsi
|
|
42/48
|
Clearances: South Africa(A), NONE(A) |
|
|
|
Notes: TN-366 - IO6 - Glosten confirmed with ABS that TGT not required to have POLAR CODE certificate for 2019. Cert required for any polar cruises 2020 and beyond.
4/8/2019 - 5 science days lost due to MPDG water pump failure; returned to Cape Town on 4/4/2019 to await parts; parts received by small boat transfer on 4/8/2019.
4/12/2019 - 2 days added to project per NSF. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 17 May 2019 |
Dep: | 17 May 2019 |
Arr: | 09 Jun 2019 |
Unload: | 11 Jun 2019 |
|
|
|
|
Atlantic Ocean/ |
SA04 |
NA06 |
|
|
|
|
|
Robert Kamphaus
Transit Cruise
|
|
24/26
|
Clearances: NONE(A), US EEZ(A) |
|
|
|
Notes: TN-367 - 24 UW days are result of Barter with NSF for the following: 14 days for ODZ Dimensions on R/V Revelle in 2018, 5 days for OOI-CA on R/V Roger Revelle in 2018, and 5 days for ODZ Dimensions on R/V Kilo Moana in 2019. Deploy two deep Argo floats during transit. 2 days added (1 at sea; 1 offload) for NOAA PIRATA 4N/23W buoy during transit. 5/26 - 1 day removed due to faster than expected transit speed (13 kts). 6/2 - change due to early arrival; added 2nd offload day due to gear carried. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 12 Jun 2019 |
Dep: | 12 Jun 2019 |
Arr: | 02 Jul 2019 |
Unload: | 02 Jul 2019 |
|
|
|
|
|
|
|
|
Robert Kamphaus
Overhaul or Repair
|
|
21/21
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
Maint Period
|
Robert Kamphaus/UW
|
Not Specified
|
0/INST-UW/P
|
|
|
Notes: Maintenance period - lineator install, uncontaminated s/w pump install, warranty repairs (non-skid), GMDSS upgrade. C32 top-end overhauls postponed due to low hours/fuel burn. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 03 Jul 2019 |
Dep: | 05 Jul 2019 |
Arr: | 18 Jul 2019 |
Unload: | 19 Jul 2019 |
|
|
|
|
|
|
|
|
Dennis J. McGillicuddy
|
|
14/17
|
Clearances: US EEZ(A) |
|
|
|
Notes: TN-368; back to original dates. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 20 Jul 2019 |
Dep: | 20 Jul 2019 |
Arr: | 21 Jul 2019 |
Unload: | 21 Jul 2019 |
|
|
|
|
|
|
|
|
Robert Kamphaus
General Upkeep and Outfitting
|
|
2/2
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
Maint & INSURV Prep
|
Robert Kamphaus/UW
|
Not Specified
|
0/INST-UW/NonOp
|
|
|
Notes: INSURV preparations; ICMS grooming with contractor aboard. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 22 Jul 2019 |
Dep: | 22 Jul 2019 |
Arr: | 22 Jul 2019 |
Unload: | 22 Jul 2019 |
|
|
|
|
|
|
|
|
Robert Kamphaus
Transit Cruise
|
|
1/1
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
ICMS Sea Trial
|
Robert Kamphaus/UW
|
Not Specified
|
1/NAVY-ONR/F
|
|
|
Notes: ICMS grooming Sea Trial with contractor (OAC) aboard. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 23 Jul 2019 |
Dep: | 23 Jul 2019 |
Arr: | 28 Jul 2019 |
Unload: | 28 Jul 2019 |
|
|
|
|
|
|
|
|
Robert Kamphaus
General Upkeep and Outfitting
|
|
6/6
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
Maint & INSURV Prep
|
Robert Kamphaus/UW
|
Not Specified
|
0/INST-UW/NonOp
|
|
|
Notes: INSURV preparations |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 29 Jul 2019 |
Dep: | 29 Jul 2019 |
Arr: | 02 Aug 2019 |
Unload: | 02 Aug 2019 |
|
|
|
|
|
|
|
|
Robert Kamphaus
Inspection
|
|
5/5
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
INSURV
|
Robert Kamphaus/UW
|
Not Specified
|
0/INST-UW/P
|
|
|
Notes: TN-369: NSF inspection on M (7/29); INSURV T-F (7/30-8/2) |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 03 Aug 2019 |
Dep: | 03 Aug 2019 |
Arr: | 03 Aug 2019 |
Unload: | 03 Aug 2019 |
|
|
|
|
|
|
|
|
Robert Kamphaus
General Upkeep and Outfitting
|
|
1/1
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
Not Specified
|
0/INST-UW/NonOp
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 04 Aug 2019 |
Dep: | 05 Aug 2019 |
Arr: | 13 Aug 2019 |
Unload: | 14 Aug 2019 |
|
|
|
|
|
|
|
|
Alan D. Chave
|
|
9/11
|
Clearances: US EEZ(A) |
|
|
|
Notes: TN-370: NSF/OCE/OTIC - 1726798 - Funded
Two winches from the UNOLS winch pool to manage towed transmitter and receiver arrays.
480 VAC, 3 phase, 100 A circuit on the fantail. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 15 Aug 2019 |
Dep: | 15 Aug 2019 |
Arr: | 17 Aug 2019 |
Unload: | 17 Aug 2019 |
|
|
|
|
|
|
|
|
Robert Kamphaus
General Upkeep and Outfitting
|
|
3/3
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
Prep for transit
|
Robert Kamphaus/UW
|
Not Specified
|
0/INST-UW/NonOp
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 18 Aug 2019 |
Dep: | 18 Aug 2019 |
Arr: | 18 Aug 2019 |
Unload: | 18 Aug 2019 |
|
|
|
|
|
|
|
|
Niall Slowey
Transit Cruise
|
|
0/1
|
Clearances: NONE(T) |
|
|
|
Notes: Charge 1 mob day for Slowey (TN-372); moved from Montevideo |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 19 Aug 2019 |
Dep: | 19 Aug 2019 |
Arr: | 08 Sep 2019 |
Unload: | 08 Sep 2019 |
|
|
|
|
west Atlantic/ |
SA03A |
NA06 |
|
|
|
|
|
Robert Kamphaus
Transit Cruise
|
|
21/21
|
Clearances: NONE(A), US EEZ(A) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
Reposit for Slowey
|
Robert Kamphaus/UW
|
Not Specified
|
15/INST-UW/F
|
Reposit for Slowey
|
Robert Kamphaus/UW
|
Not Specified
|
6/NSF-OCE-MGG/F
|
|
|
Notes: TN-371 |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 09 Sep 2019 |
Dep: | 11 Sep 2019 |
Arr: | 31 Oct 2019 |
Unload: | 02 Nov 2019 |
|
|
|
|
|
|
|
|
Niall Slowey
|
|
51/55
|
Clearances: Argentina(A), United Kingdom(A) |
Ancil Facs: OSU Coring Facility (MARSSAM), Portable MCS group |
|
|
|
Notes: TN-372: Reduce staging days in Montevideo to 2. 8/30/2019 UK MSR approved. 9/3/2019 Argentine MSR approved. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 03 Nov 2019 |
Dep: | 05 Nov 2019 |
Arr: | 07 Dec 2019 |
Unload: | 08 Dec 2019 |
|
|
|
|
South Atlantic/ |
SA03A |
SA04 |
|
|
|
|
|
William W. Sager
|
|
33/36
|
Clearances: NONE(T) |
Ancil Facs: Portable MCS group |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
Walvis Ridge Geophys
|
William W. Sager/UHouston
|
Not Specified
|
36/NSF-OCE-IPS/F
|
|
|
Notes: TN-373; IHA permitting required for Leg 1. Departed 11/4 @ noon to transit to Zona Comun fueling area off La Plata, Argentina. Fueled 11/5 AM, then u/w on project. Ship did clear into Argentina. Arrived Walvis Bay on 12/7 AM; went to anchorage due to lack of pier space. Alongside 12/8 at 1100 local, and began offload. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 09 Dec 2019 |
Dep: | 10 Dec 2019 |
Arr: | 05 Jan 2020 |
Unload: | 07 Jan 2020 |
|
|
|
|
|
|
|
|
William W. Sager
|
|
22/23
|
Clearances: NONE(T) |
Ancil Facs: Portable MCS group |
|
|
|
Notes: TN-374. Fueled 12/9 in Walvis Bay. Departed 12/10 @1340 local despite full day at anchorage upon arrival. Arrive Cape Town - 5 Jan 2020, Unload 6-7 Jan 2020. |
|
|
|