View Cruise

  Schedule Information  
Ship: Neil Armstrong Schedule Status: Final Schedule ID: 14047
Schedule Year: 2019 Schedule Name: Version 11
Notes: 11/25: McRaven Inst. Cruise shortened by 1 day d/t weather. The 1 day will be added to the deadhead transit from drydock to finsig the MB Calibration for EM122.
11/8: OTZ cruise deferred to 2020 d/t severe weather
10/24: Correcting date for Keigwin's early arrival d/t adverse weather (6th instead of the 9th)
10/10: Armstrong arrives in 5 days earlier d/t adverse weather. Alongside 10-12th
8/26: Armstrong arrives a day early from Irminger, still billing OOI for original cruise duration (demobe)
7/25: T.Shank needs to go btw Sept 11-15th d/t Natgeo staff schedule
7/8: Put Calibration on last cruise ? (TBD), Tim Sept 13-17th, pause at WHOI, Added OTZ then Combo Cruise
5/17: Corrected the Niskin demobe/ mobe between legs.
5/13: Late arrival/ departure, into/ out of Reykjavik, icebergs & bad wx
4/19: Early arrival d/t bad wx at Pioneer
12/14: Removed 6 day stand alone calibration cruise & Added 2 days calibration on WHOI Inst. Days. Lost 4 days overall for the year
10/15: Shift Calibration cruise to WHOI Inst. Day cruise slot to allow for BBC time at WHOI w/ vessel in March 2019. Shifted those 6 Inst. Cruise days to Nov...may combine the 2 cruises in Nov. (TBD)?
9/4: Mackinnon asks to depart ~week earlier, move MBCal before Pioneer & Mackinnon/ remainder of the year to the left a week.
8/30: Added 2 days to spring/ fall pioneer cruises & removed 2 days from Irminger's mobe/demobe as per ooi email 8/29/18.
8/2: Mak Saito decides his Protiens cruise w/ Clio is better in April/ May- no can do (-18 days) on Armstrong, thus dropping the 5 day Bates cruise (-8 days).
7/23: Add 1 more standby day at WHOI & +1 day to transit up to Reykj.
7/16: WHOI Inst cruise only 10 days as per Rob (was 19)
6/12: Add SSSG STR for Multibeam calibrations- 1 day
5/21: Calypso on NATO Alliance & Bates Hydro on Endeavor
2/22: 15 day cruise WHOI Inst. Days
***Remember to schedule WHOI institutional days***
Hodgekiss "W" (-22 days)
? Chave, McGillicuddy 2, Fall Pioneer on Atlantis?
1/26: Bartholomaus/ CA or EU Ice "Familiar" vessel in Greenland WC (26 days)
1/24: Send "W" (-20 days)
1/10: Sievert "W" (-21 days)
12/6/17: Email Mulholland not funded (-26 days).
Removed Moyer in Guam (-27 days)...Too far.
Put Babin in Manz on Atlantis (in the area). (-42 days).
3/31/17: McGillicuddy 2018 July cruise deferred to 2019 to allow for N.Atlantic ops.
  Cruise Information  
Ship Request Information
Operator Cruise ID: AR39-A
Chief Scientist: Al Plueddemann, WHOI
Activity Type: At Sea for Science
Created By: Kerry Strom
Compare Request:
Project Short Title: OOI Pioneer
Requested Year: 2019
Requested Ship: Neil Armstrong  
Request Type: Primary  
Created By: Paul Matthias  
Load Non-charge Days: 0
Load Charge Days: 2   Load Date: 9/23/2019
Activity Days: 9 Adjustment Days Start Date: 9/25/2019
Transit Days: 0 0 End Date: 10/3/2019
Unload Charge Days: 1   Unload Date: 10/4/2019
Unload Non-charge Days: 0
Mob Days: 2  
Science Days: 21 Optimum Start Date: 9/15/2019
Transit Estimate: 2 Earliest Start Date: 9/1/2019
Demob Days: 1 Latest Start Date: 9/15/2019
Repeating Cruise: Yes Dates To Avoid: Mooring servicing in spring and fall, timed for weather and biofouling cycle
Number of Repeating Cruises: 16 Repeating Interval: every 6 months
Repeating Cruise Comments: Recover, redeploy, refresh power systems and sensors every 6 months.
Justification/Comments: Spring and fall cruises to meet requirement to refresh power and sensors every 6 months, deal with biofouling.
Deck payload when deploying and servicing moorings requires large UNOLS vessel, such as Knorr.
PI   Project/Purpose   Agency   Funding Status   Op Days
Al Plueddemann, WHOI   OOI Pioneer   NSF-OOI/OOI   Funded   12
  Start Port: Woods Hole, MA, USA
  End Port: Woods Hole, MA, USA
Requested Start Port: Woods Hole, MA, USA
Intermediate Port(s): None
Requested End Port: Woods Hole, MA, USA
Port Comments: WHOI is OOI CGSN Homeport facility.
  Lat/Long Marsden Grid Navy Op Area
Beginning
39° N / 69° W map
115 map
NA06 map
Ending
41° N / 71° W map
152 map
NA06 map
  Show Degrees Minutes    
 
Op Area Description: NE shelf
  Lat/Long Marsden Grid Navy Op Area
Beginning
39° N / 69° W map
115 map
NA06 map
Ending
41° N / 71° W map
152 map
NA06 map
  Show Degrees Minutes    
 
Op Area Description: NE shelf
Coastal States Requiring Clearance: US EEZ(A)
Foreign Clearance Required: No
Foreign Clearance Comments: none required.
Ancil Facilities:
Instrumentation Requested: Dynamic Positioning
Multibeam
Dredging/Coring/Large Dia. Trawl Wire
Instrumentation Comments: Trawl in case of ned to drag for moorings.
Ancil Facilities Requested:
Ancil Facility Comments: Intermediate vessel with dynamic positioning, crane rated to 7000 lbs, A-frame to 10 tons. 1200 sq ft working deck area; 60,000 lb ship deck load; 9,000 m 9/16 th trawl wire, 12 days endurance, experience with mooring operations.
External Cruise Webpage:
Cruise Notes: