Ship: |
Neil Armstrong |
Schedule Status: |
Final |
Schedule ID: |
14047 |
Schedule Year: |
2019 |
Schedule Name: |
Version 11 |
Notes: |
11/25: McRaven Inst. Cruise shortened by 1 day d/t weather. The 1 day will be added to the deadhead transit from drydock to finsig the MB Calibration for EM122. 11/8: OTZ cruise deferred to 2020 d/t severe weather 10/24: Correcting date for Keigwin's early arrival d/t adverse weather (6th instead of the 9th) 10/10: Armstrong arrives in 5 days earlier d/t adverse weather. Alongside 10-12th 8/26: Armstrong arrives a day early from Irminger, still billing OOI for original cruise duration (demobe) 7/25: T.Shank needs to go btw Sept 11-15th d/t Natgeo staff schedule 7/8: Put Calibration on last cruise ? (TBD), Tim Sept 13-17th, pause at WHOI, Added OTZ then Combo Cruise 5/17: Corrected the Niskin demobe/ mobe between legs. 5/13: Late arrival/ departure, into/ out of Reykjavik, icebergs & bad wx 4/19: Early arrival d/t bad wx at Pioneer 12/14: Removed 6 day stand alone calibration cruise & Added 2 days calibration on WHOI Inst. Days. Lost 4 days overall for the year 10/15: Shift Calibration cruise to WHOI Inst. Day cruise slot to allow for BBC time at WHOI w/ vessel in March 2019. Shifted those 6 Inst. Cruise days to Nov...may combine the 2 cruises in Nov. (TBD)? 9/4: Mackinnon asks to depart ~week earlier, move MBCal before Pioneer & Mackinnon/ remainder of the year to the left a week. 8/30: Added 2 days to spring/ fall pioneer cruises & removed 2 days from Irminger's mobe/demobe as per ooi email 8/29/18. 8/2: Mak Saito decides his Protiens cruise w/ Clio is better in April/ May- no can do (-18 days) on Armstrong, thus dropping the 5 day Bates cruise (-8 days). 7/23: Add 1 more standby day at WHOI & +1 day to transit up to Reykj. 7/16: WHOI Inst cruise only 10 days as per Rob (was 19) 6/12: Add SSSG STR for Multibeam calibrations- 1 day 5/21: Calypso on NATO Alliance & Bates Hydro on Endeavor 2/22: 15 day cruise WHOI Inst. Days ***Remember to schedule WHOI institutional days*** Hodgekiss "W" (-22 days) ? Chave, McGillicuddy 2, Fall Pioneer on Atlantis? 1/26: Bartholomaus/ CA or EU Ice "Familiar" vessel in Greenland WC (26 days) 1/24: Send "W" (-20 days) 1/10: Sievert "W" (-21 days) 12/6/17: Email Mulholland not funded (-26 days). Removed Moyer in Guam (-27 days)...Too far. Put Babin in Manz on Atlantis (in the area). (-42 days). 3/31/17: McGillicuddy 2018 July cruise deferred to 2019 to allow for N.Atlantic ops. |
|
Operator Cruise ID: |
AR36 |
Chief Scientist: |
Lloyd D. Keigwin, WHOI |
Activity Type: |
At Sea for Science |
Created By: |
Kerry Strom |
|
|
Dates To Be Determined
|
Load Non-charge Days: |
0 |
Load Charge Days: |
2 |
|
Load Date: |
8/31/2019 |
Activity Days: |
3 |
Adjustment Days |
Start Date: |
9/2/2019 |
Transit Days: |
2 |
0 |
End Date: |
9/6/2019 |
Unload Charge Days: |
4 |
|
Unload Date: |
9/10/2019 |
Unload Non-charge Days: |
0 |
|
Mob Days: |
1 |
|
Science Days: |
3 |
Optimum Start Date: |
9/1/2019 |
Transit Estimate: |
5 |
Earliest Start Date: |
9/1/2019 |
Demob Days: |
1 |
Latest Start Date: |
9/15/2019 |
Repeating Cruise: |
No |
Dates To Avoid: |
My understanding is that there may be an availability in early Sept. 2019. However, we could have an SVC anytime so long as weather is likely to be good. |
Number of Repeating Cruises: |
0 |
Repeating Interval: |
|
Repeating Cruise Comments: |
|
Justification/Comments: |
|
|
PI |
|
Project/Purpose |
|
Agency |
|
Funding Status |
|
Op Days |
Lloyd D. Keigwin, WHOI |
|
Armstrong coring SVC |
|
NAVY/ONR |
|
Funded |
|
11 |
Lloyd D. Keigwin, WHOI |
|
Armstrong coring SVC |
|
NSF/OCE/MGG |
|
Funded |
|
0 |
|
|
Requested Start Port: |
None |
Intermediate Port(s): |
None |
Requested End Port: |
None |
Port Comments: |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Op Area Description: |
ENAM |
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
|
Op Area Description: |
sargasso sea |
|
Coastal States Requiring Clearance:
|
NONE(A), US EEZ(A)
|
|
Foreign Clearance Required: |
No |
|
Foreign Clearance Comments: |
|
|
|
Instrumentation Requested: |
Dynamic Positioning ADCP Dredging/Coring/Large Dia. Trawl Wire Radioisotope use - briefly describe
|
Instrumentation Comments: |
Radioisotope use will be the Cs-137 source for gamma ray attenuation measurement in the core logger.
Synthetic rope will be used instead of 9/16" trawl wire |
Ancil Facilities Requested: |
Jumbo Piston Coring Large Gravity Core
|
Ancil Facility Comments: |
|
|
External Cruise Webpage: |
|
Cruise Notes: |
|
|