View Cruise

  Schedule Information  
Ship: Neil Armstrong Schedule Status: Final Schedule ID: 14478
Schedule Year: 2020 Schedule Name: Version 15
Notes: ****2020 US Academic Research Fleet vessel schedules are subject to change as the COVID-19 pandemic evolves.
Scheduled cruise Chief Scientists are urged to keep in close contact with the vessel operators to remain aware of any updates/changes.

12/20: AR49, returns 1 day early. ONR days for the cruise go from 22 to 21. Day count for the year goes from 179-178.
12/5: AR49, 1 day delayed departure d/t wx
12/1: AR48 Leg B: Homeport Nov 3 (wx and shifted equipment off/on ship)
At sea Nov 4 – Nov 12 / Off load Nov 13...Added 1 day to cruise* Day Count for the year goes up from 178 to 179.
11/4: Returned early, d/t weather, resumed ops the next day (no change in funding days)
10/27: Fall Pioneer arr/ dep dates adjusted- count stays the same
10/21: Arrived 1 day earlier than scheduled
9/15: Oct. 22nd USCG
9/4: 3 day early Irminger arrival
8/21: Add ONR's/ ADEON cruise ROV to pick up "JAX lander" & engineering dive
8/11: Removed 6 Non op days from March transit, wrongly calculated into CY20 funding.
8/10: 4 day early arrival from AR45 will not go to demobe. Day count goes from 190-186.
7/29: OOI Irminger adding 1 day to AR46 as per DB email
7/27: Armstrong arrives 4 days earlier than scheduled. Days added to demobe for a total of 6
7/24: Remove Pickarts 5 days from Irminger and add as "buffer/ in-port days" for after the cruise. Day count goes down from 194 to 189.
7/7: Remove JP Student cruise
6/17: Added a 2nd leg to Fall Pioneer, added a 3 day JP Student cruise
6/5: -12 d ONR/NESBA Pilot cruise. Defer to 2021
5/28: Shifting 2 of the 18 transit days to OSNAP W days for Irminger ops
5/13: -10 days from Spring/Fall Pioneer, -6 days from Irminger.
Added 7 days for Bill Johns OSNAP E.
3/31: May 11th earliest start date for Pioneer as per OOI meeting
3/25: -46 day BLT cruise d/t Covid19. Day count was 229, now 183)
3/16: CA DFO cruise cancelled d/t Corona Virus -28 days (Day count for the year was 257, now 229)
2/25: 1 day delay from yard d/t stern thruster issue.
2/13: Drydock delay, shift Adeon/ Peach off transit
1/29: Adding WHOI Stellwagen Mapping day
1/23: Adding the 4th DFO day at the end of the cruise for a total of 25 days
1/21: Adding 3 days to DFO (Removing WHOI funded day for mapping) and 1 day to Tampa to WHOI transit (was 7, now 8 days) Shift OTZ to the right 1 day.
1/15: Adding 1 charge day to NSF & ONR for home port mobe (PEACH & ADEON)
1/13: Departure DD must be Feb 23rd (39 days)
1/10/20: Swap Spring Pioneer dates as per OOI's request
Add Adeon & Peach to deadhead back to WHOI after DD
Change CA DFO from 33 to 18 days + 1 WHOI day
AND...Add pit stop in Reykjavik for Niskine as per CS & ONR
1/7/20: Oceaneering ROV transformer failure delayed departure by 4 days and cancelled the Adeon & Peach portion of the cruise/ deadhead from WHOI to Tampa.
11/12: Deadheads for CA DFO added & updated voy #'s
10/29: Adding "Rapid" PEACH recovery cruise (9 days)
10/1: Pioneer is 24 days each (STR said 26, so 4 days were removed from the schedule changing the day count from 251 to 247) Last 2 cruises of the year are 2 days earlier.
Thanksgiving is the 26th in 2020
8/28: Exports Cancelled on Armstrong d/t lack of funding (NASA)
7/23: Add possible DoD cruise to start 2020 season
Shift Inst cruise down to October as a TBD
7/1: -2 day from EXPORTS for Dever (NSF) "W"
5/1: Johns Dutch Vsl -27 days
4/15: OSNAP West notified of Barter
1/31: Pickart is looking for a 37 day cruise, same as 2018
Fall Pioneer missing*
NASA: Sampling starting on site on May 1, 2020 (could be May 15)
1/15: Makris 2 ONR cruises are for 2021. He will update the STR (-88 days!)
1/3: Ferrari "BLT" No earlier than 6/20 start
***1 – June 2020, Armstrong
***2 – September 2020, UK vessel
***3 – June 2021, UK vessel
2/15: Send "W" (-22 days)
2020 is a LEAP year 366 days
  Cruise Information  
Ship Request Information
Operator Cruise ID: AR48
Chief Scientist: Sheri N. White, WHOI
Activity Type: At Sea for Science
Created By: Kerry Strom
Compare Request:
Project Short Title: OOI Pioneer
Requested Year: 2020
Requested Ship: Neil Armstrong  
Request Type: Primary  
Created By: Paul Matthias  
Load Non-charge Days: 0
Load Charge Days: 2   Load Date: 10/26/2020
Activity Days: 6 Adjustment Days Start Date: 10/28/2020
Transit Days: 0 0 End Date: 11/2/2020
Unload Charge Days: 0   Unload Date: 11/2/2020
Unload Non-charge Days: 0
Mob Days: 2  
Science Days: 21 Optimum Start Date: 9/15/2020
Transit Estimate: 2 Earliest Start Date: 9/1/2020
Demob Days: 1 Latest Start Date: 9/15/2020
Repeating Cruise: Yes Dates To Avoid: Mooring servicing in spring and fall, timed for weather and biofouling cycle
Number of Repeating Cruises: 16 Repeating Interval: every 6 months
Repeating Cruise Comments: Recover, redeploy, refresh power systems and sensors every 6 months.
Justification/Comments: Spring and fall cruises to meet requirement to refresh power and sensors every 6 months, deal with biofouling.
Deck payload when deploying and servicing moorings requires large UNOLS vessel, such as Knorr.
PI   Project/Purpose   Agency   Funding Status   Op Days
Al Plueddemann, WHOI   OOI Pioneer   NSF-OOI/OOI   Funded   8
  CS: Sheri White   OTHER   Funded   0
  Start Port: Woods Hole, MA, USA
  End Port: Woods Hole, MA, USA
Requested Start Port: Woods Hole, MA, USA
Intermediate Port(s): None
Requested End Port: Woods Hole, MA, USA
Port Comments: WHOI is OOI CGSN Homeport facility.
  Lat/Long Marsden Grid Navy Op Area
Beginning
39° N / 69° W map
115 map
NA06 map
Ending
41° N / 71° W map
152 map
NA06 map
  Show Degrees Minutes    
 
Op Area Description: NE shelf
  Lat/Long Marsden Grid Navy Op Area
Beginning
39° N / 69° W map
115 map
NA06 map
Ending
41° N / 71° W map
152 map
NA06 map
  Show Degrees Minutes    
 
Op Area Description: NE shelf
Coastal States Requiring Clearance: US EEZ(T)
Foreign Clearance Required: No
Foreign Clearance Comments: none required.
Ancil Facilities:
Instrumentation Requested: Dynamic Positioning
Multibeam
Dredging/Coring/Large Dia. Trawl Wire
Instrumentation Comments: Trawl in case of ned to drag for moorings.
Ancil Facilities Requested:
Ancil Facility Comments: Intermediate vessel with dynamic positioning, crane rated to 7000 lbs, A-frame to 10 tons. 1200 sq ft working deck area; 60,000 lb ship deck load; 9,000 m 9/16 th trawl wire, 12 days endurance, experience with mooring operations.
External Cruise Webpage:
Cruise Notes: