View Schedule
or
schedule as:
Expanded (Text)
Condensed (Text)
Expanded (PDF)
Send schedule email to:
Note for recipient(s):
the schedule as:
Excel XML
CSV
Google Earth Map (KML)
ICal Calendar
2015
-
Sikuliaq
2015 with Dan's Observations and Rose's Input
Final
- ID #
12680
Version #
2
-
3/7/2018
Scheduling Contact(s)
Doug Baird
ddbaird2*%*%*alaska^%^%^edu
(907) 224-5261
Notes:
1. Updated 18 Sept. Replaced the GeoPrisms placeholder with a funder ONR cruise. Deleted the NOAA funded Stabeno cruise which was withdrawn by the agency.
2. Updated 23 Oct. Incorporates changes in the project funded portion of the year. Currently two LOIs for 2015 depending on whether the GeoPrisms cruise or the ONR cruise takes that second period of the funded science schedule. Either case, will not impact dates for the last two funded cruises. This is Rev B which incorporates the ONR funded cruise. Added in period of time in Seward after the last funded science cruise to install the project funded replacement A-frame.
3. Update 5 Nov. Added in the GeoPrisms deployment cruise near Unmak Island, made adjustments in earlier cruises to accommodate. Add additional days for availability and eliminated Seward stop between completion of availability and arrival in Dutch Harbor to start funded science. No change in other funded science cruises.
4. Update 8 Dec. Edited the transit from Dutch Harbor to Nome as a deadhead transit. No change in the funded science dates.
5. Update 15 Dec. Revised the schedule because the Woodgate cruise will be done on a different ship.
6. Update 31 Dec. Revised the schedule because the GeoPrisms mooring cruise will no longer be done on SIKULIAQ. No adjustment made in the schedules for the 3 funded science cruises.
7. Updated 11 Mar to include the recovery cruise for Dr. Key's ocean-bottom EM receivers around Unmak Island. Includes an update for the spring shipyard period being in Seward, AK and bringing the ship to the Seattle area at the end of the year for the A-frame replacement.
8. Updated 15 Mar to correct an error for cruise 7 on the schedule; it had listed Nome, AK as the arrival port, it should have been listed as Dutch Harbor, AK. No other change made in the schedule.
9. Updated 15 April,added first part of Tominaga cruise n Jan, changed dept date from 13 Feb to 12 Feb for leg 10, arr from 15 Mar to 17 Mar leg 12, dept from 12 Apr to 10 Apr, arr from 14 Apr to 13 Apr, and updated shipyard dates.
10. Updated 16 April, added Non-op maintenance period post shipyard. Changed Institutional days from pending to funded, and added an adjustment day on Tominaga cruise for crossing the Int Dateline west to east.
11. 18 May '15 removed 8 days of OCE/P from Key cruise, and changed 8 days of MGG/P to 9 days.
View Summary
Set Default
Associated Cruises
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
01 Jan 2015
Dep:
01 Jan 2015
Arr:
15 Jan 2015
Unload:
18 Jan 2015
Apra Harbor, Guam
Apra Harbor, Guam
NP10/
NP08
NP10
32N/173E
16N/133E
Masako Tominaga
15/18
Clearances:
NONE(S)
Ancil Facs:
Sentry
Project
PI/Institution
Project #
Days/Agency/Status
Sentry JQZ Magnetics
Masako Tominaga
/
TAMU_CS
1233000
17/NSF-OCE-MGG/F
Notes:
2nd half of cruise from 2014. One adjustment day for crossing date line West to East.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
19 Jan 2015
Dep:
19 Jan 2015
Arr:
08 Feb 2015
Unload:
10 Feb 2015
Apra Harbor, Guam
Ketchikan, AK, USA
NP 06/
NP10
NP06
14N/145E
55N/132W
Daniel Oliver
20/22
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
SKQ Prog Leg 9
Daniel Oliver
/
UAF_CFOS
Not Specified
22/NSF-OCE-EDU/F
Not Specified
2/INST-UAF/F
Notes:
Leg 9; Transit from Guam to Ketchikan, AK for the ship's URN trials at SEAFAC. I added in 2 days of UAF funding for outreach in Ketchikan.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
11 Feb 2015
Dep:
12 Feb 2015
Arr:
15 Feb 2015
Unload:
18 Feb 2015
Ketchikan, AK, USA
Juneau, AK, USA
NP06/
NP06
NP06
56N/132W
58N/136W
Oliver W. Wingenter
4/8
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
SKQ Proj Trials
Not Specified
5/NSF-OCE-EDU/F
Outreach
Daniel Oliver
/
UAF_CFOS
Not Specified
3/INST-UAF/F
Notes:
Leg 10 of the SIKULIAQ post-delivery trials to run the ship through the NAVY SEAFAC range for URN measurements. Stop in Juneau is for UAF outreach who would provide funding. Gain a calendar day.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
19 Feb 2015
Dep:
19 Feb 2015
Arr:
23 Feb 2015
Unload:
12 Mar 2015
Juneau, AK, USA
Seward, AK, USA
NP10/
NP06
NP06
58N/134W
60N/150W
Daniel Oliver
5/22
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
SKQ Proj Leg 11
Daniel Oliver
/
UAF_CFOS
Not Specified
20/NSF-OCE-EDU/F
Commissioning/outrea
Not Specified
2/INST-UAF/F
Notes:
Leg 11 of the SIKULIAQ Project post-delivery period. Covers the transit to Seward and time in homeport for maintenance and equivalent of a commissioning.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
13 Mar 2015
Dep:
13 Mar 2015
Arr:
17 Mar 2015
Unload:
17 Mar 2015
Seward, AK, USA
Dutch Harbor, AK, USA
NP06/
NP06
NP05
60N/149W
54N/166W
Daniel Oliver
5/5
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
SKQ Proj Leg 12
Daniel Oliver
/
UAF_CFOS
Not Specified
5/NSF-OCE-EDU/F
Notes:
Leg 12; SIKULIAQ Project post-delivery transit to Dutch Harbor for start of ice trials.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
18 Mar 2015
Dep:
19 Mar 2015
Arr:
08 Apr 2015
Unload:
10 Apr 2015
Dutch Harbor, AK, USA
Dutch Harbor, AK, USA
NP05/
NP05
NP05
54N/164W
54N/165W
Daniel Oliver
21/24
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
SKQ Proj Leg 13
Terry E. Whitledge
/
UAF_CFOS
Not Specified
24/NSF-OCE-EDU/F
Notes:
Project funded ice trials.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
11 Apr 2015
Dep:
11 Apr 2015
Arr:
13 Apr 2015
Unload:
13 Apr 2015
Dutch Harbor, AK, USA
Seward, AK, USA
NP06/
NP05
NP03
56N/163W
60N/142W
Daniel Oliver
3/3
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Not Specified
3/NSF-OCE-EDU/F
Notes:
Transit from Dutch to Seward post ice trials.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Apr 2015
Dep:
18 Apr 2015
Arr:
18 Apr 2015
Unload:
18 Apr 2015
Seward, AK, USA
Seward, AK, USA
NP06/
NP03
NP03
60N/149W
60N/149W
Daniel Oliver
Available for Service
0/4
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
19 Apr 2015
Dep:
19 Apr 2015
Arr:
13 Jun 2015
Unload:
13 Jun 2015
Seward, AK, USA
Seward, AK, USA
NP06/
NP05
NP03
55N/166W
60N/149W
Daniel Oliver
Shipyard
56/56
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
SKQ Post Del Avail
Terry E. Whitledge
/
UAF_CFOS
Not Specified
56/NSF-OCE-EDU/NonOp
Notes:
Updated to reflect the availability being done in Seward, AK. Shipyard performance period is 20 April to 13 June. Sea Trial dates are included in this period. Added days at the beginning and end allows time for the crew to prep the ship for the shipyard period and a shakedown at the end for testing of reinstalled traction winch storage drums and sonar calibration work. When not at the shipyard the ship will moor at the ARR cruise ship dock.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Jun 2015
Dep:
14 Jun 2015
Arr:
01 Jul 2015
Unload:
03 Jul 2015
Seward, AK, USA
Seward, AK, USA
NP06/
NP03
NP06
60N/143W
60N/142W
Daniel Oliver
Maintenance
0/20
Clearances:
NONE(A)
Project
PI/Institution
Project #
Days/Agency/Status
Not Specified
0/NSF-OCE-EDU/P
Notes:
Post Shipyard maintenance period. Vessel visit by NSF Director scheduled for June 26th.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
04 Jul 2015
Dep:
04 Jul 2015
Arr:
07 Jul 2015
Unload:
07 Jul 2015
Seward, AK, USA
Dutch Harbor, AK, USA
NP5/
NP03
NP05
60N/149W
54N/166W
Terry E. Whitledge
4/4
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
SKQ Proj Leg 15
Terry E. Whitledge
/
UAF_CFOS
Not Specified
4/NSF-OCE-EDU/F
Notes:
Transit from the shipyard to Dutch Harbor for the first funded science cruise, and conduct 2 days of deep water winch trials off of Dutch. This transit would be funded by the project to complete shakedown of work performed in the shipyard.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
08 Jul 2015
Dep:
09 Jul 2015
Arr:
15 Jul 2015
Unload:
16 Jul 2015
Dutch Harbor, AK, USA
Dutch Harbor, AK, USA
Umnak Island/
NP05
NP05
54N/169W
51N/167W
Kerry Key
7/9
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Okmok MT
Kerry Key
/
LDEO
1456710 (GeoPrisms)
9/NSF-OCE-MGG/F
Okmok MT
Kerry Key
/
LDEO
Not Specified
0/NSF-OCE/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
17 Jul 2015
Dep:
19 Jul 2015
Arr:
21 Jul 2015
Unload:
22 Jul 2015
Dutch Harbor, AK, USA
Nome, AK, USA
NP5/
NA04
NP02
54N/64W
64N/165W
Peter Worcester
Transit
3/6
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
CANAPE
Peter Worcester
/
SIO
Not Specified
6/NAVY-ONR-OAS/F
Notes:
Transit from Dutch Harbor to Nome. After off-loading the moorings from the Dr. Key cruise will load the ship with science gear in Dutch, mobilizing on both the 16th and 17th of July, departing Dutch on 18th with 5-6 scientists and transport to Nome to support the following cruises.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
23 Jul 2015
Dep:
25 Jul 2015
Arr:
21 Aug 2015
Unload:
22 Aug 2015
Nome, AK, USA
Nome, AK, USA
Canada Basin/
NP02
NP02
64N/165W
64N/165W
Peter Worcester
28/31
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
CANAPE
Peter Worcester
/
SIO
Not Specified
31/NAVY-ONR-OAS/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
23 Aug 2015
Dep:
26 Aug 2015
Arr:
26 Sep 2015
Unload:
28 Sep 2015
Nome, AK, USA
Nome, AK, USA
Beaufort Gyre/
AR06
AR06
72N/160W
72N/160W
Jennifer A. MacKinnon
32/37
Clearances:
NONE(T)
Ancil Facs:
Other Towed Underwater Vehicle
Project
PI/Institution
Project #
Days/Agency/Status
ArcticMix
Jennifer A. MacKinnon
/
SIO
1303791
37/NSF-OPP-ARC/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
29 Sep 2015
Dep:
01 Oct 2015
Arr:
10 Nov 2015
Unload:
11 Nov 2015
Nome, AK, USA
Dutch Harbor, AK, USA
Beaufort Sea/
AR07
AR12
72N/140W
80N/150W
James M. Thomson
41/44
Clearances:
NONE(T)
Ancil Facs:
Unmanned Aerial Systems (UAS), Other AUV, General Purpose Lab Van
Project
PI/Institution
Project #
Days/Agency/Status
Sea State DRI
James M. Thomson
/
UW_APL
Not Specified
44/NAVY-ONR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
12 Nov 2015
Dep:
13 Nov 2015
Arr:
23 Nov 2015
Unload:
31 Dec 2015
Dutch Harbor, AK, USA
San Francisco, CA, USA
NP9/
NP05
NP08
54N/166W
48N/165W
Murray Stein
Maintenance
11/50
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
SIKULIAQ Project
Not Specified
0/NSF-OCE-EDU/F
Notes:
Transit back from Dutch Harbor AK to Alamedia, CA area for maintenance period to install project funded replacement A-frame dockside + other ship yard items. Location at Bay Ship & Yacht, Alamedia, California. The 2016 schedule is anticipated to start from this location. Includes time for an u/w period after the A-frame installation to conduct sea trials with the new A-frame.
Agency
Funded
Pending
Total
INST
7
0
7
NAVY
81
0
81
NSF
146
0
146
Total
234
0
234
<
<