Final -
ID #14366
Version #4 -
1/1/2021
|
Scheduling Contact(s) |
Hannah Delapp |
shipsked*%*%*ucsd^%^%^edu |
(858) 534-2841 |
|
|
Notes: |
|
~~~ 2020 US Academic Research Fleet vessel schedules are subject to change as the COVID-19 pandemic evolves. Scheduled cruise Chief Scientists are urged to keep in close contact with the vessel operators to remain aware of any updates/changes. ~~~
Link to the Pre-Cruise Protocol GANTT: https://docs.google.com/spreadsheets/d/1tf-9DeguRTIx0mq-0375uNE8K-6rdr5K-ErIvIX9XYo/edit?usp=sharing
10.24.19 Added NOAA/Gartman Cruise, shifted Collins & Eilon (8) days later. 11.25.19 Added (1) day to Collins cruise, shifted Eilon cruise (1) day later. 12.13.19 Added (3) days to NOAA/Gartman cruise. 2.6.20 Changed Eilon's arrival port from Auckland, NZ to Suva, Fiji due to required vessel hull cleaning not available in Papeete. Removed Anderson, Breedlove and Xu STRs from OOI cruise, added place holder for 5 days 2.14.20 Shifted Vigor delivery date from April 15th to April 29th. Added NSF inspection Oct. 21-23. 3.3.20 Changed CS from Collins to Roland. 3.16.20 Reduce OOI cruise by 2 days and depart San Diego 1 day later, legs dates TBD. Shift Schmidt start date left 1 day. Reduce Chadwick by 1 day (Butterfield) and shift state date left 1 day. Shift Gartman start date left 2 days. 5.18.20 Changed Vigor delivery date from 29 April to 12 June, estimating 30 June, shifted Portland to San Diego transit right. Changed outfitting period from 56 to 90 days, additional 18 days shown on schedule is to account for the estimated 30 June delivery. Removed San Diego to Newport transit, Kelley's "Cabled Array" cruise, Schmidt's "Cascadia GPS-A" cruise, Chadwick's "Deformation at Axial" cruise, Gartman's "Escanaba" cruise and NSF inspection. Kelley, Schmidt and Chadwick likely on TGT, Gartman deferred to 2021, NSF inspection during outfitting time - needs to be scheduled. Rescheduled Soares's deferred "SCalCurrentsBuoyancy" cruise. Reduced Roland's "Gofar TF Earthquakes" cruise to OBS recovery only, round trip out of San Diego. Added transit San Diego to Pago Pago, American Samoa. Changed Eilon's "PacificArray" cruise ports to Pago Pago, American Samoa. 6.9.20 Changed Vigor delivery date from 12 June to 29 June. 6.16.20 Shifted Soares's "SCalCurrentsBuoyancy" cruise from 04 - 14 October on RR to 09 - 19 August on SR. 6.29.20 Removed Boettcher/Gofar cruise, being rescheduled for Jan. 2021 7.4.20 Updated Portland to San Diego post-midlife transit dates, extended outfitting period to 14 October 8.5.20 Updated Eilon's ports (from Pago Pago round trip to San Diego - Honolulu) and dates (from 2 Dec. - 4 Jan. to 1 Nov. - 22 Dec.) 8.6.20 Added 10 day commissioning/calibration cruise 16-25 Oct. 8.14.20 Added load and unload day to October calibration/commissioning cruise 8.17.20 Added Balch's "Conditioning SAMW" cruise 10.27.20 Shifted Appelgate's first underway day to a port day |
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 01 Jan 2020 |
Dep: | 01 Jan 2020 |
Arr: | 01 Jul 2020 |
Unload: | 01 Jul 2020 |
|
|
|
|
|
|
|
|
Stephen Z. Kelety
Overhaul or Repair
|
|
183/183
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 02 Jul 2020 |
Dep: | 02 Jul 2020 |
Arr: | 07 Jul 2020 |
Unload: | 07 Jul 2020 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Transit Cruise
|
|
6/6
|
Clearances: US EEZ(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 08 Jul 2020 |
Dep: | 08 Jul 2020 |
Arr: | 15 Oct 2020 |
Unload: | 15 Oct 2020 |
|
|
|
|
|
|
|
|
Stephen Z. Kelety
Overhaul or Repair
|
|
100/100
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 16 Oct 2020 |
Dep: | 17 Oct 2020 |
Arr: | 25 Oct 2020 |
Unload: | 26 Oct 2020 |
|
|
|
|
|
|
|
|
Bruce Appelgate
|
|
9/11
|
Clearances: US EEZ(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
OCE-1827444
|
|
Not Specified
|
8/NSF-OCE-IPS/F
|
Calibration
|
Bruce Appelgate/SIO
|
N00014-16-1-2745
|
3/NAVY-ONR/F
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 27 Oct 2020 |
Dep: | 27 Oct 2020 |
Arr: | 01 Nov 2020 |
Unload: | 01 Nov 2020 |
|
|
|
|
|
|
|
|
Bruce Appelgate
Overhaul or Repair
|
|
6/6
|
Clearances: NONE(T) |
|
Project
|
PI/Institution
|
Project #
|
Days/Agency/Status
|
|
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 02 Nov 2020 |
Dep: | 03 Nov 2020 |
Arr: | 20 Dec 2020 |
Unload: | 22 Dec 2020 |
|
|
|
|
|
|
|
|
Zachary Eilon
|
|
48/51
|
Clearances: US EEZ(T) |
|
|
|
Notes: MSR F2020-033 (New Zealand) was canceled due to the Cook Islands Secretariat of National Research Committee denying the research permit. |
|
|
|
|
|
Dates |
|
Ports |
|
Area/Navy Op |
|
Lat/Lon |
|
Chief Scientist |
|
Activity/Total Days |
Load: | 23 Dec 2020 |
Dep: | 26 Dec 2020 |
Arr: | 23 Feb 2021 |
Unload: | 23 Feb 2021 |
|
|
|
|
|
|
|
|
William M. Balch
|
|
6/9
|
Clearances: US EEZ(T) |
|
|
|
|
|
|
|
Agency
| |
Funded
| |
Pending
| |
Total
|
NAVY
| |
3
| |
0
| |
3
|
NSF
| |
68
| |
0
| |
68
|
Total
| | 71 | | 0 | | 71 |
|
<
Day Type
| |
Total
|
Transit Cruise
| |
6
|
Overhaul or Repair
| |
289
|
At Sea for Science
| |
63
|
Total
| | 358 |
|
<
Load/Unload Days
| |
Total
|
ChargeLoad
|
|
5
|
ChargeUnload
|
|
3
|
Total
| | 8 |
|