  2020 - Roger Revelle  
Final - ID #14366    Version #4 - 1/1/2021

Scheduling Contact(s)
Hannah Delapp shipsked*%*%*ucsd^%^%^edu (858) 534-2841

  Notes:   ~~~ 2020 US Academic Research Fleet vessel schedules are subject to change as the COVID-19 pandemic evolves. Scheduled cruise Chief Scientists are urged to keep in close contact with the vessel operators to remain aware of any updates/changes. ~~~

Link to the Pre-Cruise Protocol GANTT: https://docs.google.com/spreadsheets/d/1tf-9DeguRTIx0mq-0375uNE8K-6rdr5K-ErIvIX9XYo/edit?usp=sharing

10.24.19 Added NOAA/Gartman Cruise, shifted Collins & Eilon (8) days later.
11.25.19 Added (1) day to Collins cruise, shifted Eilon cruise (1) day later.
12.13.19 Added (3) days to NOAA/Gartman cruise.
2.6.20 Changed Eilon's arrival port from Auckland, NZ to Suva, Fiji due to required vessel hull cleaning not available in Papeete. Removed Anderson, Breedlove and Xu STRs from OOI cruise, added place holder for 5 days
2.14.20 Shifted Vigor delivery date from April 15th to April 29th. Added NSF inspection Oct. 21-23.
3.3.20 Changed CS from Collins to Roland.
3.16.20 Reduce OOI cruise by 2 days and depart San Diego 1 day later, legs dates TBD. Shift Schmidt start date left 1 day. Reduce Chadwick by 1 day (Butterfield) and shift state date left 1 day. Shift Gartman start date left 2 days.
5.18.20 Changed Vigor delivery date from 29 April to 12 June, estimating 30 June, shifted Portland to San Diego transit right. Changed outfitting period from 56 to 90 days, additional 18 days shown on schedule is to account for the estimated 30 June delivery. Removed San Diego to Newport transit, Kelley's "Cabled Array" cruise, Schmidt's "Cascadia GPS-A" cruise, Chadwick's "Deformation at Axial" cruise, Gartman's "Escanaba" cruise and NSF inspection. Kelley, Schmidt and Chadwick likely on TGT, Gartman deferred to 2021, NSF inspection during outfitting time - needs to be scheduled. Rescheduled Soares's deferred "SCalCurrentsBuoyancy" cruise. Reduced Roland's "Gofar TF Earthquakes" cruise to OBS recovery only, round trip out of San Diego. Added transit San Diego to Pago Pago, American Samoa. Changed Eilon's "PacificArray" cruise ports to Pago Pago, American Samoa.
6.9.20 Changed Vigor delivery date from 12 June to 29 June.
6.16.20 Shifted Soares's "SCalCurrentsBuoyancy" cruise from 04 - 14 October on RR to 09 - 19 August on SR.
6.29.20 Removed Boettcher/Gofar cruise, being rescheduled for Jan. 2021
7.4.20 Updated Portland to San Diego post-midlife transit dates, extended outfitting period to 14 October
8.5.20 Updated Eilon's ports (from Pago Pago round trip to San Diego - Honolulu) and dates (from 2 Dec. - 4 Jan. to 1 Nov. - 22 Dec.)
8.6.20 Added 10 day commissioning/calibration cruise 16-25 Oct.
8.14.20 Added load and unload day to October calibration/commissioning cruise
8.17.20 Added Balch's "Conditioning SAMW" cruise
10.27.20 Shifted Appelgate's first underway day to a port day
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jan 2020
Dep:01 Jan 2020
Arr:01 Jul 2020
Unload:01 Jul 2020
 
Portland, OR, USA
Portland, OR, USA
 
shipyard/
NP09
NP09
 
 
 
46N/123W
46N/123W
 
  Stephen Z. Kelety
Overhaul or Repair
  183/183

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Jul 2020
Dep:02 Jul 2020
Arr:07 Jul 2020
Unload:07 Jul 2020
 
Portland, OR, USA
San Diego, CA, USA
 
SD-outfitting/
NP09
NP09
 
 
 
46N/124W
33N/117W
 
  Bruce Appelgate
Transit Cruise
  6/6

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:08 Jul 2020
Dep:08 Jul 2020
Arr:15 Oct 2020
Unload:15 Oct 2020
 
San Diego, CA, USA
San Diego, CA, USA
 
shipyard/
NP09
NP09
 
 
 
46N/123W
46N/123W
 
  Stephen Z. Kelety
Overhaul or Repair
  100/100

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:16 Oct 2020
Dep:17 Oct 2020
Arr:25 Oct 2020
Unload:26 Oct 2020
 
San Diego, CA, USA
San Diego, CA, USA
 
SoCal/
NP09
NP09
 
 
 
33N/117W
33N/120W
 
  Bruce Appelgate
  9/11

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
OCE-1827444 Not Specified 8/NSF-OCE-IPS/F
Calibration Bruce Appelgate/SIO N00014-16-1-2745 3/NAVY-ONR/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:27 Oct 2020
Dep:27 Oct 2020
Arr:01 Nov 2020
Unload:01 Nov 2020
 
San Diego, CA, USA
San Diego, CA, USA
 
MARFAC/
NP09
NP09
 
 
 
33N/117W
33N/117W
 
  Bruce Appelgate
Overhaul or Repair
  6/6

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Nov 2020
Dep:03 Nov 2020
Arr:20 Dec 2020
Unload:22 Dec 2020
 
San Diego, CA, USA
Honolulu, HI, USA
 
So. Pac./
SP05
SP05
 
 
 
33S/158W
36S/152W
 
  Zachary Eilon
  48/51

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
PacificArray James B. Gaherty/NAU 1658491 47/NSF-OCE-MGG/F
oceanic hotspots Matthew G. Jackson/UCSB 2006191 4/NSF-OCE-MGG/F
 
Notes: MSR F2020-033 (New Zealand) was canceled due to the Cook Islands Secretariat of National Research Committee denying the research permit.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:23 Dec 2020
Dep:26 Dec 2020
Arr:23 Feb 2021
Unload:23 Feb 2021
 
Honolulu, HI, USA
Papeete, Tahiti, French Polynesia
 
S. Ocean/
IN06
IN06
 
 
 
37S/53E
37S/53E
 
  William M. Balch
  6/9

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Conditioning SAMW William M. Balch/Bigelow 1735664 9/NSF-OCE-CO/F
Agency   Funded   Pending   Total
NAVY   3   0   3
NSF   68   0   68
Total  71 0 71
<
Day Type   Total
Transit Cruise   6
Overhaul or Repair   289
At Sea for Science   63
Total  358
<
Load/Unload Days   Total
ChargeLoad   5
ChargeUnload   3
Total  8