Ship Time Request System
Search Public Records
Funded Projects
Funded Requests
Published Schedules
Search Funded Projects/Requests
All Ports
All Ancillary Facilities
UNOLS Equipment Inventory
All Ships
Help
Suggestions/Request Help
Frequently Asked Questions
Log In
View Schedule
or
schedule as:
Expanded (Text)
Condensed (Text)
Expanded (PDF)
Send schedule email to:
*
One or more invalid email addresses
Note for recipient(s):
the schedule as:
Excel XML
CSV
Google Earth Map (KML)
ICal Calendar
2020
-
Robert Gordon Sproul
Final
- ID #
14476
Version #
3
-
1/1/2021
Scheduling Contact(s)
Hannah Delapp
shipsked*%*%*ucsd^%^%^edu
(858) 534-2841
Notes:
~~~ 2020 US Academic Research Fleet vessel schedules are subject to change as the COVID-19 pandemic evolves. Scheduled cruise Chief Scientists are urged to keep in close contact with the vessel operators to remain aware of any updates/changes. ~~~
Link to the Pre-Cruise Protocol GANTT: https://docs.google.com/spreadsheets/d/1tf-9DeguRTIx0mq-0375uNE8K-6rdr5K-ErIvIX9XYo/edit?usp=sharing
Added 2 1-day Hall cruises (27 & 29 Jan)
Added 2 D’Spain cruises (08-12 March & 10-14 March)
Added second MOB day for MacKinnon cruise (15 March)
Shifted Merritt cruise dates (from 03-13 March to 21-31 March)
Shifted Babcock cruise dates (from 29 Feb - 02 March to 20-22 April)
Rescheduled NSF Inspection from 2020 to 2019
1.7.20 Removed Calantoni cruise (04 - 07 Feb & 13 - 16 April) and added Loaiza cruise (04-05 Feb)
1.14.20 Shifted (3) D'Spain cruises right, added (2) Hall cruises (Feb. 27 & March 4)
1.16.20 Changed CS from Meritt to Skala
2.03.20 Changed CS from Henley to Wilcox and shifted cruise 2 days left. Added Loaiza recovery cruise Feb 24-25 and shifted Loaiza deployment cruise 1 day right. Added Hastings cruise March 6-7. Added Merrifield cruise April 3-4. Added Taylor cruise April 17-18. Added Straneo cruise May 15-16. Added Bauman-Pickering cruise April 24-25 and 26-27 (one cruise will be updated to CS Kacev). Added Send deployment cruise June 8-10, will load in AM of 1st day.
2.6.20 Adjusted Loaiza cruise dates for a late departure
2.24.20 Adjusted Loaiza cruise dates for an early return
2.25.20 Shifted MacKinnon cruise dates from 15-20 March to 6-10 April.
3.10.20 Deferred Skala cruise, new dates TBD
3.18.20 Deferred Merrifield cruise due to COVID-19, new dates TBD, requests Fall/October
3.21.20 Removed MacKinnon's cruise due to COVID-19, test cruise will not be rescheduled on SPROUL, days to be applied later/TBD
4.10.20 Deferred three D'Spain cruises due to COVID-19, new dates TBD, requests before, between and after the CalCOFI cruises. Deferred Taylor cruise due to COVID-19, new dates TBD, requests summer. Deferred two Babcock cruises due to COVID-19, new dates TBD. Canceled two Baumann-Pickering cruises due to COVID-19. Canceled Straneo cruise due to COVID-19. Deferred Send cruise due to COVID-19, new dates TBD. Deferred two Jaffe cruises, new dates TBD, requests one in 2021 and one in 2022.
5.20.20 Rescheduled Send's deferred "SIOC 218B/Del Mar" cruise and D'Spain's first of three deferred "Passive Sonar" cruises.
5.28.20 Canceled Wilcox cruise due to COVID-19 related impacts.
6.3.20 Added mobilization day to Send's "SIOC 218B/Del Mar" cruise
6.17.20 Updated CS from D'Spain to Rimington
6.19.20 Added unload day to Rimington
6.29.20 Added one rest day in-between each underway day for Rimmington
7.4.20 Shifted Send's "SIOC 218B/Del Mar" recovery cruise offload day from 3 July to 6 July
7.6.20 Added Alford & Send's “SIOC 218B / Del Mar” deployment cruise as two-one day cruises (23rd & 24th), unloading the following Monday (27th)
8.14.20 Added D'Spain's "Passive Sonar" cruise loading 4 Sep, u/w 14 Sep, 5/7/9 Oct, unload 12 Oct.
9.16.20n Added 2 underway days to Rimington and shifted unload day
10.09.20 Removed 2 Rimington underway days
11.17.20 Added two NIWC cruises
12.4.20 Added Pedrie 3 ADCP cruises and removed Hall's unused Wx contingency day.
12.17.20 Removed Pedrie cruise, will reschedule in 2021. Updated and added Hall cruise Update: Removed additional Pedrie cruise as well as newly added Hall cruise.
View Summary
Set Default
Associated Cruises
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
01 Jan 2020
Dep:
01 Jan 2020
Arr:
05 Jan 2020
Unload:
05 Jan 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
5/5
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
06 Jan 2020
Dep:
06 Jan 2020
Arr:
26 Jan 2020
Unload:
26 Jan 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Lee Ellett
General Upkeep and Outfitting
21/21
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
27 Jan 2020
Dep:
27 Jan 2020
Arr:
27 Jan 2020
Unload:
27 Jan 2020
San Diego, CA, USA
San Diego, CA, USA
SOCAL/
NP09
NP09
33N/117W
33N/117W
Peyton Hall
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
PO from SAIC
Peyton Hall
/
NIWC PAC
Not Specified
1/OTHER/F
ET5 Sea Test
Peyton Hall
/
NIWC PAC
Not Specified
0/NAVY/T
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
28 Jan 2020
Dep:
28 Jan 2020
Arr:
28 Jan 2020
Unload:
28 Jan 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
1/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
29 Jan 2020
Dep:
29 Jan 2020
Arr:
29 Jan 2020
Unload:
29 Jan 2020
San Diego, CA, USA
San Diego, CA, USA
SOCAL/
NP09
NP09
33N/117W
33N/117W
Peyton Hall
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
PO from SAIC
Peyton Hall
/
NIWC PAC
Not Specified
1/OTHER/F
ET5 Sea Test
Peyton Hall
/
NIWC PAC
Not Specified
0/NAVY/T
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
30 Jan 2020
Dep:
30 Jan 2020
Arr:
04 Feb 2020
Unload:
04 Feb 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
6/6
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
05 Feb 2020
Dep:
05 Feb 2020
Arr:
05 Feb 2020
Unload:
05 Feb 2020
San Diego, CA, USA
San Diego, CA, USA
SOCAL/
NP09
NP09
33N/117W
33N/117W
Pablo Loaiza
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
PO from Trident
Jeffrey Cook
/
Trident
Not Specified
1/OTHER/F
ARNet
Jeffrey Cook
/
Trident
N00030-17-C-0020
0/NAVY/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
06 Feb 2020
Dep:
06 Feb 2020
Arr:
23 Feb 2020
Unload:
23 Feb 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
18/18
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
24 Feb 2020
Dep:
24 Feb 2020
Arr:
24 Feb 2020
Unload:
24 Feb 2020
San Diego, CA, USA
San Diego, CA, USA
SOCAL/
NP09
NP09
33N/117W
33N/117W
Pablo Loaiza
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
PO from Trident
Jeffrey Cook
/
Trident
Not Specified
1/OTHER/F
ARNet
Jeffrey Cook
/
Trident
N00030-17-C-0020
0/NAVY/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
25 Feb 2020
Dep:
25 Feb 2020
Arr:
26 Feb 2020
Unload:
26 Feb 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
2/2
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
27 Feb 2020
Dep:
27 Feb 2020
Arr:
27 Feb 2020
Unload:
27 Feb 2020
San Diego, CA, USA
San Diego, CA, USA
SOCAL/
NP09
NP09
33N/117W
33N/117W
Peyton Hall
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
PO from SAIC
Not Specified
1/OTHER/F
ET5 Sea Test
Peyton Hall
/
NIWC PAC
Not Specified
0/NAVY/P
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
28 Feb 2020
Dep:
28 Feb 2020
Arr:
03 Mar 2020
Unload:
03 Mar 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
5/5
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
04 Mar 2020
Dep:
04 Mar 2020
Arr:
04 Mar 2020
Unload:
04 Mar 2020
San Diego, CA, USA
San Diego, CA, USA
SOCAL/
NP09
NP09
33N/117W
33N/117W
Peyton Hall
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
PO from SAIC
Not Specified
1/OTHER/F
ET5 Sea Test
Peyton Hall
/
NIWC PAC
Not Specified
0/NAVY/P
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
05 Mar 2020
Dep:
05 Mar 2020
Arr:
05 Mar 2020
Unload:
05 Mar 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
1/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
06 Mar 2020
Dep:
07 Mar 2020
Arr:
07 Mar 2020
Unload:
07 Mar 2020
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
33N/118W
33N/117W
Philip Hastings
1/2
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Student cruise fish
Philip Hastings
/
SIO
Not Specified
2/INST-UCSD-SIO/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
08 Mar 2020
Dep:
08 Mar 2020
Arr:
12 Mar 2020
Unload:
12 Mar 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
5/5
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
13 Mar 2020
Dep:
13 Mar 2020
Arr:
25 Jun 2020
Unload:
25 Jun 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
105/105
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
26 Jun 2020
Dep:
26 Jun 2020
Arr:
26 Jun 2020
Unload:
26 Jun 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Uwe Send
0/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
SIOC 218B / Del Mar
Not Specified
1/INST-UCSD-SIO/F
SIOC 218B / Del Mar
Uwe Send
/
SIO
Not Specified
0/INST/P
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
27 Jun 2020
Dep:
27 Jun 2020
Arr:
30 Jun 2020
Unload:
30 Jun 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
4/4
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
01 Jul 2020
Dep:
01 Jul 2020
Arr:
02 Jul 2020
Unload:
02 Jul 2020
San Diego, CA, USA
San Diego, CA, USA
SOCAL/
NP09
NP09
33N/117W
33N/117W
Uwe Send
2/2
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
SIOC 218B / Del Mar
Not Specified
2/INST-UCSD-SIO/F
SIOC 218B / Del Mar
Uwe Send
/
SIO
Not Specified
0/INST/P
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
03 Jul 2020
Dep:
03 Jul 2020
Arr:
05 Jul 2020
Unload:
05 Jul 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
3/3
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
06 Jul 2020
Dep:
06 Jul 2020
Arr:
06 Jul 2020
Unload:
06 Jul 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Uwe Send
0/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
SIOC 218B / Del Mar
Not Specified
1/INST-UCSD-SIO/F
SIOC 218B / Del Mar
Uwe Send
/
SIO
Not Specified
0/INST/P
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
07 Jul 2020
Dep:
07 Jul 2020
Arr:
12 Jul 2020
Unload:
12 Jul 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
6/6
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
13 Jul 2020
Dep:
14 Jul 2020
Arr:
14 Jul 2020
Unload:
14 Jul 2020
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
33N/117W
32N/118W
Dennis Rimington
1/2
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Passive Sonar
Gerald L. D'Spain
/
SIO
Not Specified
2/NAVY-ONR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
15 Jul 2020
Dep:
15 Jul 2020
Arr:
15 Jul 2020
Unload:
15 Jul 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
1/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
16 Jul 2020
Dep:
16 Jul 2020
Arr:
16 Jul 2020
Unload:
16 Jul 2020
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
33N/117W
32N/118W
Dennis Rimington
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Passive Sonar
Gerald L. D'Spain
/
SIO
Not Specified
1/NAVY-ONR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
17 Jul 2020
Dep:
17 Jul 2020
Arr:
17 Jul 2020
Unload:
17 Jul 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
1/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
18 Jul 2020
Dep:
18 Jul 2020
Arr:
18 Jul 2020
Unload:
18 Jul 2020
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
33N/117W
32N/118W
Dennis Rimington
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Passive Sonar
Gerald L. D'Spain
/
SIO
Not Specified
1/NAVY-ONR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
19 Jul 2020
Dep:
19 Jul 2020
Arr:
19 Jul 2020
Unload:
19 Jul 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
1/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
20 Jul 2020
Dep:
20 Jul 2020
Arr:
20 Jul 2020
Unload:
21 Jul 2020
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
33N/117W
32N/118W
Dennis Rimington
1/2
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Passive Sonar
Gerald L. D'Spain
/
SIO
Not Specified
2/NAVY-ONR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
22 Jul 2020
Dep:
23 Jul 2020
Arr:
23 Jul 2020
Unload:
23 Jul 2020
San Diego, CA, USA
San Diego, CA, USA
Near San Diego/
NP09
NP09
33N/117W
33N/117W
Matthew H. Alford
1/2
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
SIOC 218B / Del Mar
Not Specified
2/INST-UCSD-SIO/F
SIOC 218B / Del Mar
Uwe Send
/
SIO
Not Specified
0/INST/P
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
24 Jul 2020
Dep:
24 Jul 2020
Arr:
24 Jul 2020
Unload:
24 Jul 2020
San Diego, CA, USA
San Diego, CA, USA
Near San Diego/
NP09
NP09
33N/117W
33N/117W
Uwe Send
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
SIOC 218B / Del Mar
Not Specified
1/INST-UCSD-SIO/F
SIOC 218B / Del Mar
Uwe Send
/
SIO
Not Specified
0/INST/P
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
25 Jul 2020
Dep:
25 Jul 2020
Arr:
26 Jul 2020
Unload:
26 Jul 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
2/2
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
27 Jul 2020
Dep:
27 Jul 2020
Arr:
27 Jul 2020
Unload:
27 Jul 2020
San Diego, CA, USA
San Diego, CA, USA
Near San Diego/
NP09
NP09
33N/117W
33N/117W
Uwe Send
0/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
SIOC 218B / Del Mar
Not Specified
1/INST-UCSD-SIO/F
SIOC 218B / Del Mar
Uwe Send
/
SIO
Not Specified
0/INST/P
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
28 Jul 2020
Dep:
28 Jul 2020
Arr:
02 Sep 2020
Unload:
02 Sep 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
37/37
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
03 Sep 2020
Dep:
03 Sep 2020
Arr:
03 Sep 2020
Unload:
03 Sep 2020
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
33N/117W
32N/118W
Dennis Rimington
0/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Passive Sonar
Gerald L. D'Spain
/
SIO
Not Specified
1/NAVY-ONR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
04 Sep 2020
Dep:
04 Sep 2020
Arr:
13 Sep 2020
Unload:
13 Sep 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
10/10
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Sep 2020
Dep:
14 Sep 2020
Arr:
14 Sep 2020
Unload:
14 Sep 2020
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
33N/117W
32N/118W
Dennis Rimington
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Passive Sonar
Gerald L. D'Spain
/
SIO
Not Specified
1/NAVY-ONR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
15 Sep 2020
Dep:
15 Sep 2020
Arr:
04 Oct 2020
Unload:
04 Oct 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
20/20
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
05 Oct 2020
Dep:
05 Oct 2020
Arr:
05 Oct 2020
Unload:
05 Oct 2020
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
33N/117W
32N/118W
Dennis Rimington
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Passive Sonar
Gerald L. D'Spain
/
SIO
Not Specified
1/NAVY-ONR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
06 Oct 2020
Dep:
06 Oct 2020
Arr:
06 Oct 2020
Unload:
06 Oct 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
1/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
07 Oct 2020
Dep:
07 Oct 2020
Arr:
07 Oct 2020
Unload:
07 Oct 2020
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
33N/117W
32N/118W
Dennis Rimington
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Passive Sonar
Gerald L. D'Spain
/
SIO
Not Specified
1/NAVY-ONR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
08 Oct 2020
Dep:
08 Oct 2020
Arr:
08 Oct 2020
Unload:
08 Oct 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
1/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
09 Oct 2020
Dep:
09 Oct 2020
Arr:
09 Oct 2020
Unload:
09 Oct 2020
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
33N/117W
32N/118W
Dennis Rimington
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Passive Sonar
Gerald L. D'Spain
/
SIO
Not Specified
1/NAVY-ONR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
10 Oct 2020
Dep:
10 Oct 2020
Arr:
13 Oct 2020
Unload:
13 Oct 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
4/4
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Oct 2020
Dep:
14 Oct 2020
Arr:
14 Oct 2020
Unload:
14 Oct 2020
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
33N/117W
32N/118W
Dennis Rimington
0/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Passive Sonar
Gerald L. D'Spain
/
SIO
Not Specified
1/NAVY-ONR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
15 Oct 2020
Dep:
15 Oct 2020
Arr:
25 Nov 2020
Unload:
25 Nov 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
42/42
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
26 Nov 2020
Dep:
26 Nov 2020
Arr:
29 Nov 2020
Unload:
29 Nov 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
4/4
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
30 Nov 2020
Dep:
30 Nov 2020
Arr:
01 Dec 2020
Unload:
01 Dec 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
2/2
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
02 Dec 2020
Dep:
03 Dec 2020
Arr:
03 Dec 2020
Unload:
03 Dec 2020
San Diego, CA, USA
San Diego, CA, USA
Offshore CA/
NP09
NP09
33N/117W
33N/117W
Peyton Hall
1/2
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
T&E Support
Eric Terrill
/
SIO
N66001-19-F-1035
2/NAVY/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
04 Dec 2020
Dep:
04 Dec 2020
Arr:
06 Dec 2020
Unload:
06 Dec 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
3/3
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
07 Dec 2020
Dep:
08 Dec 2020
Arr:
08 Dec 2020
Unload:
08 Dec 2020
San Diego, CA, USA
San Diego, CA, USA
SOCAL/
NP09
NP09
33N/117W
33N/117W
Kolby Pedrie
1/2
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Training and Testing
Lee Ellett
/
SIO
175104595
2/NSF-OCE-IPS/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
09 Dec 2020
Dep:
09 Dec 2020
Arr:
14 Dec 2020
Unload:
14 Dec 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
6/6
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
15 Dec 2020
Dep:
15 Dec 2020
Arr:
15 Dec 2020
Unload:
15 Dec 2020
San Diego, CA, USA
San Diego, CA, USA
Offshore CA/
NP09
NP09
33N/117W
33N/117W
Peyton Hall
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
T&E Support
Eric Terrill
/
SIO
N66001-19-F-1035
1/NAVY/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
16 Dec 2020
Dep:
16 Dec 2020
Arr:
31 Dec 2020
Unload:
31 Dec 2020
San Diego, CA, USA
San Diego, CA, USA
MARFAC/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
16/16
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Agency
Funded
Pending
Total
INST
10
0
10
NAVY
15
0
15
NSF
2
0
2
OTHER
6
0
6
Total
33
0
33
<
Day Type
Total
Available for Service
168
General Upkeep and Outfitting
21
Standby Days
144
At Sea for Science
22
Total
355
<
Load/Unload Days
Total
ChargeLoad
7
ChargeUnload
4
Total
11