  2021 - Sikuliaq  
SKQ 2021 S14 03Jan2022
Final - ID #14659    Version #2 - 1/3/2022

Scheduling Contact(s)
Doug Baird ddbaird2*%*%*alaska^%^%^edu (907) 224-5261

  Notes:   2021 US Academic Research Fleet vessel schedules are subject to change as the COVID-19 pandemic evolves. Scheduled cruise Chief Scientists are urged to keep in close contact with the vessel operators to remain aware of any updates/changes.
03Jan2022: Finalized schedule
09Dec2021: Transit from Nome reduced, transit to shipyard delayed
01Nov2021: Reduced # of DBO voyage days
13Oct2021: Added Arctic DBO-EcoFOCI cruise in November, engine install, and adjusted dates of AMOS
26July2021: Added new STR to Mercury Cycling voyage
28June2021: updated mid-season repair status
08Mar2021: Add 3 days to Mercury Cycling in Arctic
23Feb2021: Reduce OOI Endurance Array by one day
27Jan2021: Omit 2nd DH port call, Hg Cycling cruise to end in SWD, adjusted UAF days for LTER cruises, delayed LTER & OOI Papa one week, and removed the Aleutian GPSA cruise
01Dec2020: Add 5-day shakedown & acoustic calibration, delayed arrival in Seattle in January
11Nov2020: Corrected NGA LTER day count and removed NOAA days from NGA LTER
09Nov2020: Added NOAA days to NGA LTER, and increased mob days for Chukchi Edges
13Oct2020: Moved GPS-A to March and start from Seattle, and added 2 days to LTERs
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jan 2021
Dep:01 Jan 2021
Arr:13 Jan 2021
Unload:13 Jan 2021
 
Bellingham, WA, USA
Bellingham, WA, USA
 
Belingham/
NP09
NP09
 
 
 
49N/122W
49N/122W
 
  Doug Baird
General Upkeep and Outfitting
  13/13

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Jan 2021
Dep:14 Jan 2021
Arr:15 Jan 2021
Unload:15 Jan 2021
 
Bellingham, WA, USA
Seattle, WA, USA
 
N Pac Ocean/
NP09
NP09
 
 
 
49N/122W
48N/122W
 
  Doug Baird
Transit Cruise
  2/2

Clearances: NONE(A), US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Reposition to UW for IMACS upgrade

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:16 Jan 2021
Dep:16 Jan 2021
Arr:03 Mar 2021
Unload:03 Mar 2021
 
Seattle, WA, USA
Seattle, WA, USA
 
Seattle/
NP09
NP09
 
 
 
48N/122W
48N/122W
 
  Doug Baird
Overhaul or Repair
  47/47

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: IMACS upgrade needs 5 weeks

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:04 Mar 2021
Dep:04 Mar 2021
Arr:08 Mar 2021
Unload:08 Mar 2021
 
Seattle, WA, USA
Seattle, WA, USA
 
Pac NW/
NP09
NP09
 
 
 
48N/122W
48N/122W
 
  Ethan H. Roth
Transit Cruise
  5/5

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Post-IMACS upgrade shakedown and acoustics calibration (MBES Patch Test and EK-80 cal)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Mar 2021
Dep:09 Mar 2021
Arr:10 Mar 2021
Unload:10 Mar 2021
 
Seattle, WA, USA
Seattle, WA, USA
 
Seattle/
NP09
NP09
 
 
 
48N/122W
48N/122W
 
  Doug Baird
Inspection
  2/2

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: USCG and ABS annual inspection

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:11 Mar 2021
Dep:12 Mar 2021
Arr:17 Mar 2021
Unload:18 Mar 2021
 
Seattle, WA, USA
Newport, OR, USA
 
West Coast/
NP09
NP09
 
 
 
48N/122W
33N/117W
 
  David Schmidt
  6/8

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status
Cascadia GPS-A C. D. Chadwell/SIO 1657961 8/NSF-OCE-MGG/F
 
Notes: Postponed from 2020 (COVID-19)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Mar 2021
Dep:19 Mar 2021
Arr:21 Mar 2021
Unload:21 Mar 2021
 
Newport, OR, USA
Newport, OR, USA
 
Newport/
NP09
NP09
 
 
 
45N/124W
45N/124W
 
  Doug Baird
General Upkeep and Outfitting
  3/3

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: 3 days to allow for delay in crossing Yaquina Bay bar

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:22 Mar 2021
Dep:24 Mar 2021
Arr:07 Apr 2021
Unload:08 Apr 2021
 
Newport, OR, USA
Newport, OR, USA
 
W Coast/
NP09
NP09
 
 
 
45N/124W
45N/124W
 
  Edward P. Dever
  15/18

Clearances: US EEZ(A)

Ancil Facs: Mooring Spooler, Portable Winch
 
Project PI/Institution Project # Days/Agency/Status
Endurance Array OM Edward P. Dever/OSU-CEOAS Not Specified 18/NSF-OOI-OOI/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Apr 2021
Dep:09 Apr 2021
Arr:10 Apr 2021
Unload:10 Apr 2021
 
Newport, OR, USA
Newport, OR, USA
 
Newport/
NP09
NP09
 
 
 
45N/124W
45N/124W
 
  Doug Baird
General Upkeep and Outfitting
  2/2

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:11 Apr 2021
Dep:11 Apr 2021
Arr:16 Apr 2021
Unload:16 Apr 2021
 
Newport, OR, USA
Seward, AK, USA
 
N Pac Ocean/
NP09
NP03
 
 
 
45N/124W
60N/149W
 
  Doug Baird
Transit Cruise
  6/6

Clearances: NONE(A), US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status
Endurance Array OM Edward P. Dever/OSU-CEOAS Not Specified 5/NSF-OOI-OOI/F
Cascadia GPS-A C. D. Chadwell/SIO 1657961 1/NSF-OCE-MGG/F
 
Notes: Transit Policy: Dever (79%) 4.7 days, Chadwell ( 21%) 1.3 days

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Apr 2021
Dep:17 Apr 2021
Arr:20 Apr 2021
Unload:20 Apr 2021
 
Seward, AK, USA
Seward, AK, USA
 
Seward/
NP03
NP03
 
 
 
60N/149W
60N/149W
 
  Doug Baird
General Upkeep and Outfitting
  4/4

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Fuel and resupply

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:21 Apr 2021
Dep:23 Apr 2021
Arr:06 May 2021
Unload:07 May 2021
 
Seward, AK, USA
Seward, AK, USA
 
Gulf of Alaska/
NP03
NP03
 
 
 
60N/149W
60N/149W
 
  Russell R. Hopcroft
  14/17

Clearances: US EEZ(A)

Ancil Facs: Clean Lab Van, Portable Winch
 
Project PI/Institution Project # Days/Agency/Status
NGA LTER Russell R. Hopcroft/UAF_CFOS 1656070 17/NSF-OCE-BIO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:08 May 2021
Dep:08 May 2021
Arr:08 May 2021
Unload:08 May 2021
 
Seward, AK, USA
Seward, AK, USA
 
Homeport/
NP03
NP03
 
 
 
60N/149W
60N/149W
 
  Doug Baird
General Upkeep and Outfitting
  1/1

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 May 2021
Dep:10 May 2021
Arr:17 May 2021
Unload:18 May 2021
 
Seward, AK, USA
Dutch Harbor, AK, USA
 
Aleutians/
NP03
NP05
 
 
 
60N/150W
54N/166W
 
  Tyler D. Hennon
  8/10

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status
AK SKQ Program 2021 Bradley Moran/UAF_CFOS ASP 2021 9/INST-UAF/F
Hg cycling in Arctic Robert P. Mason/UCONN 1854462 1/NSF-OPP-ARC/F
 
Notes: Mobilize Kadko/Mason gear prior to departure

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 May 2021
Dep:20 May 2021
Arr:14 Jun 2021
Unload:16 Jun 2021
 
Dutch Harbor, AK, USA
Seward, AK, USA
 
Bering/Chukchi/
NP05
NP03
 
 
 
54N/166W
60N/150W
 
  Robert P. Mason
  26/29

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status
Hg cycling in Arctic Robert P. Mason/UCONN 1854462 26/NSF-OPP-ARC/F
Winter Chukchi Sea Robert S. Pickart/WHOI OPP-2110148 3/NSF-OPP-ARC/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Jun 2021
Dep:17 Jun 2021
Arr:23 Jun 2021
Unload:23 Jun 2021
 
Seward, AK, USA
Seward, AK, USA
 
Seward/
NP03
NP03
 
 
 
60N/149W
60N/149W
 
  Doug Baird
Overhaul or Repair
  7/7

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:24 Jun 2021
Dep:24 Jun 2021
Arr:24 Jun 2021
Unload:24 Jun 2021
 
Seward, AK, USA
Seward, AK, USA
 
Homeport/
NP03
NP03
 
 
 
60N/149W
60N/149W
 
  Doug Baird
General Upkeep and Outfitting
  1/1

Clearances: NONE(A)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:25 Jun 2021
Dep:27 Jun 2021
Arr:12 Jul 2021
Unload:13 Jul 2021
 
Seward, AK, USA
Seward, AK, USA
 
Gulf of Alaska/
NP03
NP03
 
 
 
60N/149W
60N/149W
 
  Russell R. Hopcroft
  16/19

Clearances: US EEZ(A)

Ancil Facs: Clean Lab Van, Portable Winch
 
Project PI/Institution Project # Days/Agency/Status
NGA LTER Russell R. Hopcroft/UAF_CFOS 1656070 13/NSF-OCE-BIO/F
AK SKQ Program 2021 Bradley Moran/UAF_CFOS ASP 2021 6/INST-UAF/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Jul 2021
Dep:14 Jul 2021
Arr:14 Jul 2021
Unload:14 Jul 2021
 
Seward, AK, USA
Seward, AK, USA
 
Homeport/
NP03
NP03
 
 
 
60N/149W
60N/149W
 
  Doug Baird
Overhaul or Repair
  1/1

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:15 Jul 2021
Dep:18 Jul 2021
Arr:02 Aug 2021
Unload:04 Aug 2021
 
Seward, AK, USA
Seward, AK, USA
 
Seward/
NP03
NP03
 
 
 
60N/149W
60N/149W
 
  Kristopher Newhall
  16/21

Clearances: NONE(A), US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status
OOI Papa Kristopher Newhall/WHOI Not Specified 21/NSF-OOI-OOI/F
 
Notes: Seward is 300 miles closer to Station Papa than is Newport

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:05 Aug 2021
Dep:05 Aug 2021
Arr:05 Aug 2021
Unload:05 Aug 2021
 
Seward, AK, USA
Seward, AK, USA
 
Homeport/
NP03
NP03
 
 
 
60N/149W
60N/149W
 
  Doug Baird
General Upkeep and Outfitting
  1/1

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Fuel and resupply

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Aug 2021
Dep:10 Aug 2021
Arr:16 Aug 2021
Unload:16 Aug 2021
 
Seward, AK, USA
Nome, AK, USA
 
AK EEZ/
NP03
NP02
 
 
 
60N/149W
64N/164W
 
  Bernard Coakley
Transit Cruise
  7/11

Clearances: US EEZ(A)

Ancil Facs: Other AUV, Mooring Spooler
 
Project PI/Institution Project # Days/Agency/Status
Chukchi Edges II Bernard Coakley/UAF_G&G 1916575 9/NSF-OPP-ARC/F
AMOS Craig M. Lee/UW_APL Not Specified 2/NAVY-ONR/F
Chukchi Edges II Bernard Coakley/UAF_G&G Not Specified 0/NSF-OCE-MGG/T
 
Notes: Transit Policy: Coakley (61%) 4.7 days, Lee (39%) 2.3 days; plus 4 days for loading Coakley's gear in Seward prior to transit; arrived August 17th which was originally scheduled for fueling and taking on stores.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Aug 2021
Dep:17 Aug 2021
Arr:30 Sep 2021
Unload:01 Oct 2021
 
Nome, AK, USA
Nome, AK, USA
 
Chukchi Sea/
NP02
NP02
 
 
 
64N/165W
64N/165W
 
  Bernard Coakley
  45/46

Clearances: US EEZ(A)

Ancil Facs: Ocean Bottom Seismograph Instrument Pool (OBSIP), Other Seismic/OBS Facility
 
Project PI/Institution Project # Days/Agency/Status
Chukchi Edges II Bernard Coakley/UAF_G&G 1916575 46/NSF-OPP-ARC/F
Chukchi Edges II Bernard Coakley/UAF_G&G Not Specified 0/NSF-OCE-MGG/T

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Oct 2021
Dep:02 Oct 2021
Arr:05 Oct 2021
Unload:05 Oct 2021
 
Nome, AK, USA
Nome, AK, USA
 
Nome/
NP02
NP02
 
 
 
64N/165W
64N/165W
 
  Doug Baird
Overhaul or Repair
  4/4

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Install rebuilt #2 SSDG and take on fuel and stores for cruise

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Oct 2021
Dep:08 Oct 2021
Arr:04 Nov 2021
Unload:05 Nov 2021
 
Nome, AK, USA
Nome, AK, USA
 
Arctic Ocean/
NP02
NP02
 
 
 
64N/165W
64N/165W
 
  Craig M. Lee
  28/31

Clearances: Canada(T), NONE(A), US EEZ(A)

Ancil Facs: Other AUV, Mooring Spooler
 
Project PI/Institution Project # Days/Agency/Status
AMOS Craig M. Lee/UW_APL Not Specified 31/NAVY-ONR/F
 
Notes: Mobilization occurred during engine installation, and waited for ABS inspection - delayed departure by 2 days

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Nov 2021
Dep:06 Nov 2021
Arr:06 Nov 2021
Unload:06 Nov 2021
 
Nome, AK, USA
Nome, AK, USA
 
Nome/
NP02
NP02
 
 
 
64N/165W
64N/165W
 
  Doug Baird
General Upkeep and Outfitting
  1/1

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Fuel and take on stores

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Nov 2021
Dep:08 Nov 2021
Arr:16 Nov 2021
Unload:17 Nov 2021
 
Nome, AK, USA
Nome, AK, USA
 
Chukchi Sea/
NP02
NP02
 
 
 
64N/165W
64N/165W
 
  Seth Danielson
  9/11

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status
Arctic DBO Seth Danielson/UAF_CFOS Not Specified 9/NSF-OPP-ARC/F
Arctic DBO Seth Danielson/UAF_CFOS Not Specified 1/OTHER/F
Arctic DBO Seth Danielson/UAF_CFOS Not Specified 1/BOEM/F
 
Notes: Arctic DBO-EcoFOCI cruise rescheduled aboard SKQ after cancellation abd M/V Discovery in late September; NSF will fund 10 days, BOEM will fund 1 day, AMBON/AOOS/NPRB will fund 1 day.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:18 Nov 2021
Dep:18 Nov 2021
Arr:23 Nov 2021
Unload:23 Nov 2021
 
Nome, AK, USA
Seward, AK, USA
 
W AK-GoAK/
NP02
NP03
 
 
 
64N/165W
60N/149W
 
  Doug Baird
Transit Cruise
  6/6

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status
Chukchi Edges II Bernard Coakley/UAF_G&G 1916575 3/NSF-OPP-ARC/F
AMOS Craig M. Lee/UW_APL Not Specified 2/NAVY-ONR/F
Seth Danielson/UAF_CFOS Not Specified 1/NSF-OPP-ARC/F
Chukchi Edges II Bernard Coakley/UAF_G&G Not Specified 0/NSF-OCE-MGG/T
 
Notes: Transit Policy: Coakley (52%) 3.1 days, Lee (35%) 2.1 days, and Danielson (13%) 0.8 days

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:25 Nov 2021
Dep:25 Nov 2021
Arr:31 Dec 2021
Unload:31 Dec 2021
 
Seward, AK, USA
Seward, AK, USA
 
Homeport/
NP03
NP03
 
 
 
60N/149W
60N/149W
 
  Doug Baird
General Upkeep and Outfitting
  37/37

Clearances: US EEZ(A)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Prepare for January-February 2022 regulatory shipyard & inspection. Shipyard location TBD
Agency   Funded   Pending   Total
BOEM   1   0   1
INST   15   0   15
NAVY   35   0   35
NSF   137   0   137
NSF-OOI   44   0   44
OTHER   1   0   1
Total  233 0 233
<
Day Type   Total
Transit Cruise   26
General Upkeep and Outfitting   63
Inspection   2
Overhaul or Repair   59
At Sea for Science   183
Total  333
<
Load/Unload Days   Total
ChargeLoad   19
ChargeUnload   12
Total  31