  Schedule Information  
Ship: Atlantis Schedule Status: Final Schedule ID: 14061
Schedule Year: 2019 Schedule Name: Version 12
Notes: 12/15: Vessel arrives Manz.,MX 2 days early Dec 12th (was the 14th)
12/5: Changed 10 OOI days to OCE days as per 12/4 email. There is not a Kelley STR for OCE funding. Added this account manually.
12/4: Removed Marum STR to reflect billing to UW, not "Other" which is what the STR comes up as.
11/15/2019: Scheduler error, Put 4N instead of 4S...3 days additional transit, -1 day from 2019 GoFar ops, transferring it to 2020 ops on Revelle, -2 days from Manzanillo mobe, keeping the next cruise on schedule
9/30/2019: Atlantis pitstop (9/25-26) on Pythias Oasis cruise into Newport d/t wx & family emergency
7/17: Added 2 days to 9n for Fornari
7/8: Add 1 day to Boettcher cruise & 1 more demobe day d/t MX
6/10: Kelley's 1st leg, delayed arrival by 1 day (6/10), d/t wx. Delayed departure as well (now the 13th)
5/2: Sylvan arrives 1 day early. Was 4/24th now 23rd (recent hull cleaning)
3/22: OOI Legs added
3/6: Drazen after Sylvan d/t Atlantis maintenance issue
ONR eng dive added to Sylvan from Drazen
Shift Ohman cruise onto Sikuliaq to keep Drazen/ Alvin cruise
2/16: -1 day/ ONR from Alvin Eng Dive on Hansel
2/11: Changed DD dock from SFO to Vallejo
1/19/2019: Added 19d Valentine (2020) work in SD, B4 transiting Panama
1/9/2019: Removed Hueber's 7 days from Lang (not funded)
12/12: Add 2 Alvin Eng Dives onto Sylvan
& add 1 day to Ohman's 1st cruise for NOAA
10/12: Add 7 days to Lang (Huber & Rogers)
10/1: Add Drazen Alvin Cruise...Remove Resing (Sally Ride)...Add 2 days on Kelley's Pythias for Rob Harris.
9/28: Ref Email from UW: Take 10 charge days from Kelley's OOI & bill it to IPS
AND Corrected transit to Orcutt cruise from MGG to OOI d/t schedule changes
9/7: Ohman: 2 days of NOAA funding may be added to Spring cruise. TBC?
8/30: squeeze Hansel inbetween newport>SD transit.
8/21: change Jason eng dive from Kelley to Abers/ Sikuliaq and take 1 mobe day off Kelley OOI
8/3: Hansel can NOT go before Sept d/t an August cruise elsewhere & her instruments will not be ready until Sept. They are flexible in location and can go from Sept-Dec, no prob.
8/2: Lang in 2020, Hansel before Resing then Boettcher (using Manta, Equador)
7/17: This schedule delays the vessel from DD to start USWC Jason work later to give Jason a week to get from Charleston to Newport (provided Adams/ Brown goes in April)
6/27: "W" -3 days Rappe off Orcutt
6/25: Confirmed Resing can not work at EPR in OCT d/t wx
6/12: Add SSSG STR for Multibeam calibrations 2 days on a seamount/ deepwater
5/18: Orcutt:"The CORKs that are the primary target for my Jason cruise are at 2.6km water depth. We could do either Jason deployment mode - single body or double body. If my cruise is bracketed by OOI work, I imagine that single body might be the mode of choice to limit configuration changes? If single body, we would want to have the science tool sled instead of the heavy lift sled, since we will not have any heavy lift needs on my cruise."
5/14: Ohman needs mid June/ July for filament "spin up" and windfields (too still in Aug) Also needs berthing for 36 (no DSOG?)
3/30: Reimers on the Cabled array (not Endurance)
3/28: Sikuliaq will cover Ohman
3/26: Added 2nd Abers & Reimer
3/6: Orcutt "There is a good chance that I will be invited to participate in a IODP drilling expedition off Costa Rica within the same optimal time window for the JdF cruise (July-September 2019)."
2/8: Cohen "W" (-19 days)
1/31: Hansel can do late summer/ early fall near Caymans (flexible).
Out of DRY DOCK...? March/ April? (Al-TBD)
Funded STR's for Kelley (CA), Orcutt (OR) & Abers (AK) need to be covered
Remove 2 SWIFT cruises in the Indian Ocean (too far & no Alvin work)
Add Armstrong's: Chave, McGillicuddy & Fall Pioneer?
1/22: Young W (-22 days w/ Alvin Sentry) as per scientist
1/18/18: Karson W (-33 days w/ Sentry & Jason)
12/15/17: Resenbach W (-7days w/ Alvin)
  Cruise Information  
Ship Request Information
Operator Cruise ID: AT42-20
Chief Scientist: Jessica M. Warren, UDEL
Activity Type: At Sea for Science
Created By: Kerry Strom
Compare Request:
Project Short Title: Gofar TF Earthquakes
Requested Year: 2019
Requested Ship: Global  
Request Type: Primary  
Created By: Margaret Boettcher  
Load Non-charge Days: 0
Load Charge Days: 3   Load Date: 11/13/2019
Activity Days: 13 Adjustment Days Start Date: 11/16/2019
Transit Days: 14 0 End Date: 12/12/2019
Unload Charge Days: 1   Unload Date: 12/13/2019
Unload Non-charge Days: 0
Mob Days: 2  
Science Days: 12 Optimum Start Date: 4/1/2019
Transit Estimate: 8 Earliest Start Date: 4/1/2019
Demob Days: 2 Latest Start Date: 9/1/2019
Repeating Cruise: No Dates To Avoid: N/A
Number of Repeating Cruises: 0 Repeating Interval:
Repeating Cruise Comments: N/A
Justification/Comments: N/A
PI   Project/Purpose   Agency   Funding Status   Op Days
Margaret Boettcher, UNH   Gofar TF Earthquakes   NSF/OCE/MGG   Funded   31
  Start Port: San Diego, CA, USA
  End Port: Manzanillo, Mexico
Requested Start Port: Puerto Ayora, Galapagos Islands, Ecuador
Intermediate Port(s): None,
Requested End Port: Puerto Ayora, Galapagos Islands, Ecuador
Port Comments: Puerto Ayora is the closest port to our study area.
  Lat/Long Marsden Grid Navy Op Area
Beginning
4.6° S / 106.2° W map
310 map
SP03 map
Ending
3.8° S / 103° W map
310 map
SP03 map
  Show Degrees Minutes    
 
Op Area Description: Gofar TF, EPR
  Lat/Long Marsden Grid Navy Op Area
Beginning
4.6° S / 106.2° W map
310 map
SP03 map
Ending
3.8° S / 103° W map
310 map
SP03 map
  Show Degrees Minutes    
 
Op Area Description: Gofar TF, EPR
Coastal States Requiring Clearance: NONE(T)
Foreign Clearance Required: No
NONE
Foreign Clearance Comments: N/A
Ancil Facilities:
Instrumentation Requested: Dynamic Positioning
ADCP
Multibeam
Dredging/Coring/Large Dia. Trawl Wire
Other Operator Provided Inst. - Describe
PI-Provided Vans - briefly describe
Instrumentation Comments: We will be deploying 51 Ocean Bottom Seismometers and will need to coordinate with OBSIP. OBSIP will bring 2 vans.

Additionally, we require USBL beacons, a Hydro Winch, and XBT.
Ancil Facilities Requested: Ocean Bottom Seismograph Instrument Pool (OBSIP)
Portable Winch
Ancil Facility Comments: We require rock dredge capability with wire for 3000-5000 m water depth, along with a ship technician who has dredging experience.

And we require coordination with OBSIP.
External Cruise Webpage:
Cruise Notes: 7/9/19: 1 more day of science added to compensate for dredging method (was 13, now 14)
11/15/2019: Scheduler error, Put 4N instead of 4S...3 days additional transit, -1 day from 2019 GoFar ops, transferring it to 2020 ops on Revelle, -2 days from Manzanillo mobe, keeping the next cruise on schedule