Ship Time Request System
Search Public Records
Funded Projects
Funded Requests
Published Schedules
Search Funded Projects/Requests
All Ports
All Ancillary Facilities
UNOLS Equipment Inventory
All Ships
Help
Suggestions/Request Help
Frequently Asked Questions
Log In
View Schedule
or
schedule as:
Expanded (Text)
Condensed (Text)
Expanded (PDF)
Send schedule email to:
*
One or more invalid email addresses
Note for recipient(s):
the schedule as:
Excel XML
CSV
Google Earth Map (KML)
ICal Calendar
2009
-
Robert Gordon Sproul
Final
- ID #
10402
Version #
2
-
2/2/2010
Scheduling Contact(s)
Hannah Delapp
shipsked*%*%*ucsd^%^%^edu
(858) 534-2841
Notes:
View Summary
Set Default
Associated Cruises
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
02 Jan 2009
Dep:
03 Jan 2009
Arr:
09 Jan 2009
Unload:
09 Jan 2009
San Diego, CA, USA
San Diego, CA, USA
San Luis Obispo/
NP09
NP09
35N/121W
34N/122W
Kerry Key
7/8
Project
PI/Institution
Project #
Days/Agency/Status
mar.magnetotelluric
Brent Wheelock
/
SIO
Not Specified
7/INST-UCSD-SIO/F
San Andreas MT
Steven Constable
/
SIO
Industry funding
0/OTHER/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-wheelock/
Notes:
Carry forward from 07.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
10 Jan 2009
Dep:
11 Jan 2009
Arr:
14 Jan 2009
Unload:
14 Jan 2009
San Diego, CA, USA
San Diego, CA, USA
W. San Clemente/
NP09
NP09
32N/119W
32N/117W
Sean Wiggins
3/5
Project
PI/Institution
Project #
Days/Agency/Status
Acoustic Track & Tag
Sean Wiggins
/
SIO
Not Specified
3/NAVY-ONR-OAS/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-hildebrand01/
Notes:
1800 departure
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
15 Jan 2009
Dep:
16 Jan 2009
Arr:
16 Jan 2009
Unload:
20 Jan 2009
San Diego, CA, USA
San Diego, CA, USA
/
NP09
NP09
32N/117W
32N/117W
Richard Zimmerman
1/3
Project
PI/Institution
Project #
Days/Agency/Status
Enhancing the Flight
Gerald D'Spain
/
SIO
Not Specified
1/NAVY-ONR/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-dspain01/
Notes:
Testing of a source two to be used on the Mercer/Worcester cruises on R/V Melville in 09.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
20 Jan 2009
Dep:
21 Jan 2009
Arr:
26 Jan 2009
Unload:
26 Jan 2009
San Diego, CA, USA
San Diego, CA, USA
SB Basin/
NP09
NP09
34N/120W
34N/120W
Ingrid Hendy
5/6
Project
PI/Institution
Project #
Days/Agency/Status
Climate change in So
Ingrid Hendy
/
Umich
0752093
5/NSF-OCE-MGG/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-hendy/
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
11 Feb 2009
Dep:
12 Feb 2009
Arr:
12 Feb 2009
Unload:
13 Feb 2009
San Diego, CA, USA
San Diego, CA, USA
off San Diego/
NP09
NP09
39N/130W
39N/130W
Eric Terrill
1/3
Project
PI/Institution
Project #
Days/Agency/Status
Float Deployment
Eric Terrill
/
SIO
Not Specified
1/NAVY-ONR/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-terrill01/
Notes:
Carry forward from 07-08 N00014-03-1-0746
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
18 Feb 2009
Dep:
18 Feb 2009
Arr:
20 Feb 2009
Unload:
21 Feb 2009
San Diego, CA, USA
San Diego, CA, USA
/
NP09
NP09
33N/118W
33N/118W
Robert Pinkel
2/3
Project
PI/Institution
Project #
Days/Agency/Status
High-Resolution Vert
Robert Pinkel
/
SIO
Not Specified
2/NAVY-ONR/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-pinkel01/
Notes:
2100 Departure/Arrival
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
21 Feb 2009
Dep:
21 Feb 2009
Arr:
25 Feb 2009
Unload:
26 Feb 2009
San Diego, CA, USA
San Diego, CA, USA
Pt. Conception/
NP09
NP09
32N/123W
32N/123W
Mark D. Ohman
4/5
Project
PI/Institution
Project #
Days/Agency/Status
Errant mooring recov
Uwe Send
/
SIO
Not Specified
4/INST-UCSD-SIO/F
CCE-1
Uwe Send
/
SIO
Not Specified
0/INST-UCSD-SIO/T
CORC
Uwe Send
/
SIO
NA17RJ1231
0/NOAA/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-send01/
Notes:
Late departure after load-out for a morning/daylight recovery.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
26 Feb 2009
Dep:
27 Feb 2009
Arr:
27 Feb 2009
Unload:
28 Feb 2009
San Diego, CA, USA
San Diego, CA, USA
Tijuana River m/
NP09
NP09
33N/117W
33N/117W
Jonathan Warrick
1/3
Project
PI/Institution
Project #
Days/Agency/Status
Tijuana Sediment Fat
Jonathan Warrick
/
USGS_SantaCruz
Not Specified
1/USGS/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-warrick01/
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
09 Mar 2009
Dep:
09 Mar 2009
Arr:
14 Mar 2009
Unload:
15 Mar 2009
San Diego, CA, USA
San Diego, CA, USA
San Clemente/
NP09
NP09
39N/130W
39N/130W
Sean Wiggins
5/6
Project
PI/Institution
Project #
Days/Agency/Status
Beaked whale N Pac
John A. Hildebrand
/
SIO
Not Specified
5/NAVY-ONR/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-hildebrand02/
Notes:
Depart eve.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
22 Mar 2009
Dep:
23 Mar 2009
Arr:
27 Mar 2009
Unload:
27 Mar 2009
San Diego, CA, USA
San Diego, CA, USA
Socal/
NP09
NP09
33N/117W
33N/117W
James Conrad
4/5
Project
PI/Institution
Project #
Days/Agency/Status
Socal Hazards
James Conrad
/
USGS_Menlo
Not Specified
4/USGS/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-conrad/
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
28 Mar 2009
Dep:
28 Mar 2009
Arr:
28 Apr 2009
Unload:
28 Apr 2009
San Diego, CA, USA
San Diego, CA, USA
/
0N/0E
0N/0E
Maintenance
32/32
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
15 May 2009
Dep:
15 May 2009
Arr:
19 May 2009
Unload:
20 May 2009
San Diego, CA, USA
San Diego, CA, USA
San Clemente IS/
NP09
NP09
39N/130W
39N/130W
John A. Hildebrand
4/5
Project
PI/Institution
Project #
Days/Agency/Status
SCORE
John A. Hildebrand
/
SIO
N00014-07-WX-2037
3/NAVY-ONR/F
CORC
Uwe Send
/
SIO
NA17RJ1231
1/NOAA/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-hildebrand03/
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
22 May 2009
Dep:
26 May 2009
Arr:
28 May 2009
Unload:
28 May 2009
San Diego, CA, USA
San Diego, CA, USA
off San Diego/
NP09
NP09
32N/117W
32N/117W
Gerald D'Spain
0/4
Project
PI/Institution
Project #
Days/Agency/Status
Enhancing the Flight
Gerald D'Spain
/
SIO
Not Specified
0/NAVY-ONR/NonOp
Notes:
bay-side testing for June cruise- they will not go to sea during this time period. Some help will be required to load gear on the ship starting May 22.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
30 May 2009
Dep:
31 May 2009
Arr:
06 Jun 2009
Unload:
07 Jun 2009
San Diego, CA, USA
San Diego, CA, USA
NP9/
NP09
NA07
36N/121W
37N/23W
Thomas H. Herbers
6/8
Project
PI/Institution
Project #
Days/Agency/Status
ONR HiRes DRI
Thomas H. Herbers
/
NPS
Not Specified
6/NAVY-ONR/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-herbers/
Notes:
Dates coordinated with aircraft. Loading starts am on 29 May. depart 1200 31 May; return to San Diego early (0700 or so) on Saturday June 6 to drop off members of sci. party, then return to sea eve of June 6th.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
17 Jun 2009
Dep:
18 Jun 2009
Arr:
22 Jun 2009
Unload:
22 Jun 2009
San Diego, CA, USA
San Diego, CA, USA
Santa Barbara B/
NP09
NP09
34N/120W
34N/120W
Virginia P. Edgcomb
4/5
Project
PI/Institution
Project #
Days/Agency/Status
MIP- Protist-prokary
Virginia P. Edgcomb
/
WHOI
MCB 0604084
4/NSF-BIO-MCB/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-edgcomb/
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
11 Jul 2009
Dep:
11 Jul 2009
Arr:
11 Jul 2009
Unload:
11 Jul 2009
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
39N/130W
39N/130W
Richard Norris
1/1
Project
PI/Institution
Project #
Days/Agency/Status
2009 IGERT SIO295L
Richard Norris
/
SIO
Not Specified
1/INST-UCSD-SIO/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-norris01/
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Jul 2009
Dep:
15 Jul 2009
Arr:
15 Jul 2009
Unload:
16 Jul 2009
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
39N/130W
39N/130W
Eric Terrill
1/3
Project
PI/Institution
Project #
Days/Agency/Status
Coastal Rivers
Eric Terrill
/
SIO
N00014-07-1-0343
1/NAVY-ONR/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-terrill02/
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
18 Jul 2009
Dep:
18 Jul 2009
Arr:
18 Jul 2009
Unload:
18 Jul 2009
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
39N/130W
39N/130W
Richard Norris
1/1
Project
PI/Institution
Project #
Days/Agency/Status
2009 IGERT SIO295L
Richard Norris
/
SIO
Not Specified
1/INST-UCSD-SIO/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-norris02/
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
20 Jul 2009
Dep:
21 Jul 2009
Arr:
28 Jul 2009
Unload:
29 Jul 2009
San Diego, CA, USA
San Diego, CA, USA
San Clemente Is/
NP09
NP09
39N/130W
39N/130W
John A. Hildebrand
7/9
Project
PI/Institution
Project #
Days/Agency/Status
SOCAL and HRC
John A. Hildebrand
/
SIO
Not Specified
7/NAVY-NPS/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-hildebrand04/
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
03 Aug 2009
Dep:
03 Aug 2009
Arr:
03 Aug 2009
Unload:
23 Aug 2009
San Diego, CA, USA
San Diego, CA, USA
/
0N/0E
0N/0E
Maintenance
0/20
Project
PI/Institution
Project #
Days/Agency/Status
Notes:
Install fuel transfer pump.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
25 Aug 2009
Dep:
28 Aug 2009
Arr:
30 Aug 2009
Unload:
31 Aug 2009
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
39N/130W
39N/130W
Mark A. Zumberge
2/6
Project
PI/Institution
Project #
Days/Agency/Status
ISL
Mark A. Zumberge
/
SIO
Not Specified
2/OTHER/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-zumberge01/
Notes:
August 24 Load ship; August 25,26,27- Bay tests (work on vertical control loop etc.) The equipment will stay on board between cruises.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
01 Sep 2009
Dep:
03 Sep 2009
Arr:
05 Sep 2009
Unload:
08 Sep 2009
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
32N/117W
32N/117W
Gerald D'Spain
3/6
Project
PI/Institution
Project #
Days/Agency/Status
Enhancing the Flight
Gerald D'Spain
/
SIO
Not Specified
3/NAVY-ONR/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-dspain02/
Notes:
Keep equipment on board between cruises. Plans to arrive evening of the the 5th or early on the 6th.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
08 Sep 2009
Dep:
09 Sep 2009
Arr:
13 Sep 2009
Unload:
13 Sep 2009
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
39N/130W
39N/130W
Jules S. Jaffe
4/5
Project
PI/Institution
Project #
Days/Agency/Status
Advanced Technology
Jules S. Jaffe
/
SIO
0728305
3/NSF-OCE-OTIC/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-jaffe01/
Notes:
Includes one carry forward day from 2008 one day non-op due to winch problems- one day will be carried forward into 2010.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Sep 2009
Dep:
15 Sep 2009
Arr:
15 Sep 2009
Unload:
16 Sep 2009
San Diego, CA, USA
San Diego, CA, USA
Tijuana River m/
NP09
NP09
33N/117W
33N/117W
Jonathan Warrick
1/3
Project
PI/Institution
Project #
Days/Agency/Status
Tijuana Sediment Fat
Jonathan Warrick
/
USGS_SantaCruz
Not Specified
1/USGS/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-warrick02/
Notes:
Can share with offloading party on the 14th.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
18 Sep 2009
Dep:
19 Sep 2009
Arr:
20 Sep 2009
Unload:
21 Sep 2009
San Diego, CA, USA
San Diego, CA, USA
/
NP09
NP09
33N/117W
33N/117W
Sarah Gray
1/3
Project
PI/Institution
Project #
Days/Agency/Status
GEO-0914715
Sarah Gray
/
USD
Not Specified
1/NSF-GEO/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-kaufmann/
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
22 Sep 2009
Dep:
23 Sep 2009
Arr:
26 Sep 2009
Unload:
28 Sep 2009
San Diego, CA, USA
San Diego, CA, USA
San Clemente is/
NP09
NP09
39N/130W
39N/130W
John A. Hildebrand
3/5
Project
PI/Institution
Project #
Days/Agency/Status
Glider MM SOCAL
John A. Hildebrand
/
SIO
Not Specified
3/NAVY-ONR-OAS/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-hildebrand05/
Notes:
1800 departure
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
20 Oct 2009
Dep:
20 Oct 2009
Arr:
29 Oct 2009
Unload:
29 Oct 2009
San Diego, CA, USA
San Diego, CA, USA
/
0N/0E
0N/0E
Maintenance
10/10
Project
PI/Institution
Project #
Days/Agency/Status
Notes:
Aux. engine repairs.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
02 Nov 2009
Dep:
02 Nov 2009
Arr:
05 Nov 2009
Unload:
06 Nov 2009
San Diego, CA, USA
San Diego, CA, USA
/
NP09
NP09
32N/117W
32N/117W
Jeffrey M. Babcock
4/4
Project
PI/Institution
Project #
Days/Agency/Status
A Pacific OBSIP F
Jeffrey M. Babcock
/
SIO
0453971
4/NSF-OCE-MGG/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-babcock/
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
09 Nov 2009
Dep:
09 Nov 2009
Arr:
12 Nov 2009
Unload:
12 Nov 2009
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
39N/130W
39N/130W
Eric Terrill
3/4
Project
PI/Institution
Project #
Days/Agency/Status
Float Deployment
Eric Terrill
/
SIO
Not Specified
3/NAVY-ONR/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-terrill03/
Notes:
Carry forward from 07-08 N00014-03-1-0746 Carry forward Coastal Rivers- 2 days into 2010.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Nov 2009
Dep:
14 Nov 2009
Arr:
14 Nov 2009
Unload:
15 Nov 2009
San Diego, CA, USA
San Diego, CA, USA
/
0N/0E
0N/0E
0/1
Project
PI/Institution
Project #
Days/Agency/Status
Notes:
San Diego Maritime Week - tours
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
16 Nov 2009
Dep:
17 Nov 2009
Arr:
17 Nov 2009
Unload:
18 Nov 2009
San Diego, CA, USA
San Diego, CA, USA
Tijuana River m/
NP09
NP09
33N/117W
33N/117W
Jonathan Warrick
1/3
Project
PI/Institution
Project #
Days/Agency/Status
Tijuana Sediment Fat
Jonathan Warrick
/
USGS_SantaCruz
Not Specified
1/USGS/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-warrick03/
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
20 Nov 2009
Dep:
23 Nov 2009
Arr:
23 Nov 2009
Unload:
23 Nov 2009
San Diego, CA, USA
San Diego, CA, USA
/
NA07
NA07
32N/18W
32N/18W
C. D. Chadwell
1/2
Project
PI/Institution
Project #
Days/Agency/Status
A moored geodetic
Kevin M. Brown
/
SIO
0551363
1/NSF-OCE-OTIC/F
A moored geodetic
Kevin M. Brown
/
SIO
0551363
0/NSF-OCE-OTIC/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-brown01/
Notes:
ETD- 0700 ETA-2300
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
24 Nov 2009
Dep:
24 Nov 2009
Arr:
25 Nov 2009
Unload:
25 Nov 2009
San Diego, CA, USA
San Diego, CA, USA
/
NP09
NP09
32N/118W
32N/118W
Uwe Send
1/2
Project
PI/Institution
Project #
Days/Agency/Status
A moored geodetic
Kevin M. Brown
/
SIO
0551363
1/NSF-OCE-OTIC/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-brown02/
Notes:
ETD-0900 ETA- 2200
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
02 Dec 2009
Dep:
03 Dec 2009
Arr:
06 Dec 2009
Unload:
07 Dec 2009
San Diego, CA, USA
San Diego, CA, USA
southern CA/
NP09
NP09
39N/130W
39N/130W
Garsha Christopher J.
3/5
Project
PI/Institution
Project #
Days/Agency/Status
Glider MM SOCAL
John A. Hildebrand
/
SIO
Not Specified
2/NAVY-ONR-OAS/F
Acoustic Track & Tag
Sean Wiggins
/
SIO
Not Specified
1/NAVY-ONR-OAS/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-hildebrand06/
Notes:
Noon departure.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
11 Dec 2009
Dep:
14 Dec 2009
Arr:
16 Dec 2009
Unload:
17 Dec 2009
San Diego, CA, USA
San Diego, CA, USA
off San Diego/
NP09
NP09
32N/117W
32N/117W
Jeffrey M. Babcock
3/3
Project
PI/Institution
Project #
Days/Agency/Status
A Pacific OBSIP F
Jeffrey M. Babcock
/
SIO
0453971
3/NSF-OCE-MGG/F
External Cruise Webpage:
http://shipsked.ucsd.edu/Schedules/2009/2009-SP-babcock02/
Notes:
Intermediate port stop: Return to Marfac morning of 16 December to pick up a member of the science party,
Agency
Funded
Pending
Total
INST
13
0
13
NAVY
41
0
41
NOAA
1
0
1
NSF
22
0
22
OTHER
2
0
2
USGS
7
0
7
Total
86
0
86
<
<