  2012 - Marcus Langseth  
MGL 2012 Operations
Final - ID #11204    Version #5 - 1/8/2013

Scheduling Contact(s)
Sean Higgins sean*%*%*ldeo^%^%^columbia^%^%^edu (845) 365-8528

  Notes:   (26 November)
Added transit from Astoria to Newport

(27 Aug)
Changed San Diego transit from NSF-funded to OTHER.

(22 Aug)
Dropped Fisher placemarker.
Adjusted Tivey/Butterfield days to reflect the mob & demob days (5 total)
OPERATING DAYS = 211

(7 Aug)
Added Tivey et al to the schedule - transferred from Thompson.
Added "TBD" place marker for Fisher
OPERATING DAYS = 206 (exclusive of Fisher days @ 18)

(2 May)
Amended schedule as follows:
* Added 1 day to port call in Honolulu after Lynch-Stieglitz mission. Done to avoid conflict in Oregon with Rose Festival. Fueling will be done on this day in Honolulu rather than Astoria.
* Dropped 1 day from first Astoria port call after transit. This was to be fueling day.
* Rest of the schedule remains the same.
OPERATING DAYS = 195

(30 March)
Amended schedule to show maintenance period in Astoria - changed from San Diego. Astoria - SD transit moved to post-maintenance period. Ship yard possibility during maintenance period now dropped. JMS inspection is still undecided - ongoing discussions between Marine Operations LDEO & Matt Hawkins @ NSF regarding this.

(27 Oct)
Dropped transit from Guam to Yokohama.
Korenaga mission now sails out of Guam.
Korenaga sail date moved up to 24 March (mob date = 23rd).
OP DAYS = 195

(3 Oct)
PUBLISHED. OP DAYS = 199
Amended schedule to add 1 more day for all the OBS transfers in Guam per discussions with Thompson scheduler.
Adjusted sail date from Guam to match 7 day lag between Thompson sail date of 24 Jan & Langseth departure, Wiens Mariana Trench mission

(19 Aug)
Amended schedule per changes for the Wiens mission

(5 Aug)
Raised to LOI
Shortened maintenance period in January.
Early arrival & stand down in Guam (waiting on Thompson)
Added 2nd OBS recovery leg to Wiens mission.

(4 Aug)
Amended Wiens cruise to multi-leg mission

(27 July)
30-day maintenance period @ start of year.
Coring mission slotted in after Shatskiy Rise.
Shatskiy ends in Honolulu.
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jan 2012
Dep:01 Jan 2012
Arr:08 Jan 2012
Unload:08 Jan 2012
 
Honolulu, HI, USA
Honolulu, HI, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
Maintenance
  8/8
 
Project PI/Institution Project # Days/Agency/Status
MAINTENANCE Jeff Rupert/LDEO Not Specified 0/INST-Columbia-LDEO/F
 
Notes: MGL12-01

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Jan 2012
Dep:09 Jan 2012
Arr:24 Jan 2012
Unload:24 Jan 2012
 
Honolulu, HI, USA
Apra Harbor, Guam
 
 /
NP12
NP10
 
 
 
21N/158W
13N/145E
 
 
Transit
  15/15
 
Project PI/Institution Project # Days/Agency/Status
TRANSIT Not Specified 15/NSF-OCE-EDU/F
 
Notes: MGL12-02

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:25 Jan 2012
Dep:25 Jan 2012
Arr:31 Jan 2012
Unload:31 Jan 2012
 
Apra Harbor, Guam
Apra Harbor, Guam
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
Maintenance
  7/7
 
Project PI/Institution Project # Days/Agency/Status
MAINTENANCE Jeff Rupert/LDEO Not Specified 0/INST-Columbia-LDEO/F
 
Notes: MGL12-03

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Feb 2012
Dep:02 Feb 2012
Arr:29 Feb 2012
Unload:02 Mar 2012
 
Apra Harbor, Guam
Apra Harbor, Guam
 
 /
NP10
NP10
 
 
 
16N/146E
19N/150E
 
 
  28/31
 
Project PI/Institution Project # Days/Agency/Status
Mantle serpentinizat Douglas Wiens/WUSTL 0841074 31/NSF-OCE-MGG/F
 
Notes: MGL12-04

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:03 Mar 2012
Dep:04 Mar 2012
Arr:21 Mar 2012
Unload:22 Mar 2012
 
Apra Harbor, Guam
Apra Harbor, Guam
 
 /
NP10
NP10
 
 
 
16N/146E
19N/150E
 
 
  18/20
 
Project PI/Institution Project # Days/Agency/Status
Mantle serpentinizat Douglas Wiens/WUSTL 0841074 20/NSF-OCE-MGG/F
 
Notes: Leg 2 for OBS recovery. MGL12-05

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:23 Mar 2012
Dep:24 Mar 2012
Arr:16 Apr 2012
Unload:17 Apr 2012
 
Apra Harbor, Guam
Honolulu, HI, USA
 
 /
NP07
NP07
 
 
 
33N/156E
32N/160E
 
 
  25/27
 
Project PI/Institution Project # Days/Agency/Status
Geophysical Constrai Jun Korenaga/Yale ARRA 0927001 27/NSF-OCE-MGG/F
 
Notes: MGL12-06

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:18 Apr 2012
Dep:18 Apr 2012
Arr:30 Apr 2012
Unload:30 Apr 2012
 
Honolulu, HI, USA
Honolulu, HI, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
  13/13
 
Project PI/Institution Project # Days/Agency/Status
CORING WINCH INSTALL Jeff Rupert/LDEO Not Specified 13/NSF-OCE-EDU/F
 
Notes: TIME ESTIMATES AS FOLLOWS: 6 days - winch loading/installation 4 days - wiring/plumbing & loading of 10k of coring wire 2 days - installation of level wind & overboard blocks 1 day - load testing & commissioning of system MGL12-07

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 May 2012
Dep:01 May 2012
Arr:26 May 2012
Unload:28 May 2012
 
Honolulu, HI, USA
Honolulu, HI, USA
 
 /
SP02
NP11
 
 
 
2S/150W
12N/175W
 
 
  26/28

Clearances: Kiribati(S)
 
Project PI/Institution Project # Days/Agency/Status
Line Islands Coring Jean Lynch-Stieglitz/GaTech Not Specified 28/NSF-OCE-MGG/F
 
Notes: MGL12-08

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:29 May 2012
Dep:29 May 2012
Arr:07 Jun 2012
Unload:07 Jun 2012
 
Honolulu, HI, USA
Astoria, OR, USA
 
 /
NP12
NP09
 
 
 
21N/158W
46N/124W
 
 
Transit
  10/10
 
Project PI/Institution Project # Days/Agency/Status
TRANSIT Not Specified 10/NSF-OCE-EDU/F
 
Notes: Honolulu - Astoria: 2250nm (10 days) MGL12-09

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:08 Jun 2012
Dep:08 Jun 2012
Arr:09 Jun 2012
Unload:09 Jun 2012
 
Astoria, OR, USA
Astoria, OR, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
  2/2
 
Project PI/Institution Project # Days/Agency/Status
CORING GROUP DEMOB Jeff Rupert/LDEO Not Specified 2/NSF-OCE-EDU/F
 
Notes: MGL12-10

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:10 Jun 2012
Dep:11 Jun 2012
Arr:08 Jul 2012
Unload:09 Jul 2012
 
Astoria, OR, USA
Astoria, OR, USA
 
 /
NP09
NP09
 
 
 
45N/126W
44N/124W
 
  Suzanne M. Carbotte
  28/30

Clearances: Canada(S)
 
Project PI/Institution Project # Days/Agency/Status
Ridge to Trench Suzanne M. Carbotte/LDEO 1029411 27/NSF-OCE-MGG/F
Cascad ship-to-shore Helene D. Carton/LDEO EAR 1147622 3/NSF-EAR/F
 
Notes: MGL12-11 Vessel had to stand down until 13 June for IHA issuance.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:10 Jul 2012
Dep:12 Jul 2012
Arr:23 Jul 2012
Unload:24 Jul 2012
 
Astoria, OR, USA
Astoria, OR, USA
 
 /
NP09
NP09
 
 
 
46N/126W
47N/124W
 
 
  12/15
 
Project PI/Institution Project # Days/Agency/Status
Cascadia 2D Seismic W. S. Holbrook/UWYO 1150628 15/NSF-OCE-MGG/F
 
Notes: Added cruise per NSF/Sean Higgins discussions. MGL12-12

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:25 Jul 2012
Dep:25 Jul 2012
Arr:30 Jul 2012
Unload:30 Jul 2012
 
Astoria, OR, USA
Astoria, OR, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
Maintenance
  6/6
 
Project PI/Institution Project # Days/Agency/Status
MAINTENANCE Jeff Rupert/LDEO Not Specified 0/INST-Columbia-LDEO/F
 
Notes: MGL12-13

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:31 Jul 2012
Dep:31 Jul 2012
Arr:01 Aug 2012
Unload:01 Aug 2012
 
Astoria, OR, USA
Astoria, OR, USA
 
 /
NP09
NP09
 
 
 
46N/124W
46N/124W
 
 
NSF Inspec
  2/2
 
Project PI/Institution Project # Days/Agency/Status
JMS Inspection Not Specified 0/INST-Columbia-LDEO/NonOp
 
Notes: MGL12-14

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Aug 2012
Dep:02 Aug 2012
Arr:11 Aug 2012
Unload:11 Aug 2012
 
Astoria, OR, USA
Astoria, OR, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
Maintenance
  10/10
 
Project PI/Institution Project # Days/Agency/Status
MAINTENANCE Not Specified 0/INST-Columbia-LDEO/F
 
Notes: MAINTENANCE MGL12-15

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:12 Aug 2012
Dep:16 Aug 2012
Arr:26 Aug 2012
Unload:27 Aug 2012
 
Astoria, OR, USA
Astoria, OR, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
  11/16
 
Project PI/Institution Project # Days/Agency/Status
Mob/demob days Not Specified 5/NSF-OCE-EDU/F
VENTS-NeMO David Butterfield/UW Not Specified 4/NSF-OCE-IPS/F
CORK-OTS Maurice A. Tivey/WHOI 0926849 3/NSF-OCE-OTIC/F
HSOpticalComms Norman Farr/WHOI 0942835 3/NSF-OCE-OTIC/F
PGPR at Axial Mark A. Zumberge/SIO ARRA 0851540 1/NSF-OCE-OTIC/F
maggie ocean drifter Maurice A. Tivey/WHOI 0961163 0/NSF-OCE-OTIC/F
VENTS-NeMO David Butterfield/UW Not Specified 0/NOAA/F
 
Notes: MGL12-16

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:28 Aug 2012
Dep:28 Aug 2012
Arr:28 Aug 2012
Unload:26 Nov 2012
 
Astoria, OR, USA
Astoria, OR, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
Maintenance
  0/90
 
Project PI/Institution Project # Days/Agency/Status
MAINTENANCE Jeff Rupert/LDEO Not Specified 0/INST-Columbia-LDEO/F
 
Notes: MGL12-17

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:25 Nov 2012
Dep:25 Nov 2012
Arr:25 Nov 2012
Unload:25 Nov 2012
 
Astoria, OR, USA
Newport, OR, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
Transit
  1/1
 
Project PI/Institution Project # Days/Agency/Status
TRANSIT Not Specified 1/NSF-OCE-MGG/F
 
Notes: MGL12-18

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:26 Nov 2012
Dep:26 Nov 2012
Arr:26 Nov 2012
Unload:31 Dec 2012
 
Newport, OR, USA
Newport, OR, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
  0/35
 
Project PI/Institution Project # Days/Agency/Status
MAINTENANCE Not Specified 0/INST-Columbia-LDEO/NonOp
 
Notes: MGL12-19
Agency   Funded   Pending   Total
INST   0   0   0
NOAA   0   0   0
NSF   208   0   208
Total  208 0 208
<
<