View Schedule
or
schedule as:
Expanded (Text)
Condensed (Text)
Expanded (PDF)
Send schedule email to:
Note for recipient(s):
the schedule as:
Excel XML
CSV
Google Earth Map (KML)
ICal Calendar
2017
-
Neil Armstrong
FOY
Final
- ID #
13492
Version #
2
-
4/16/2018
Scheduling Contact(s)
Kerry Strom
kstrom*%*%*whoi^%^%^edu
(508) 289-3938
Notes:
12/14: Arrived one day earlier d/t WX. ONR funds the lost day so day count stays the same.
11/17: Miksis-Olds cruise will depart 1 day later d/t wx, ONR kindly funding the lost day.
11/2: OOI Pioneer (Fall) Leg A, arrived a day early d/t wx, & departed a day early (Same day count)
10/3: Captain updates WHOI arrival to Oct 12th for Behn transit
9/28: Keigwin arriving a day early
9/25: Reduce the last cruise of the year, ADEON by 2 days as per the PI.
9/18: Corrected drydock departure from Feb 16th to 15th (was double billed [47-46 days])
9/18: Also corrected Keigwin arrival departure dates as UNOLS will not accept the 2nd of Oct to be an arrival & departure day.
8/24: 6 day earlier arrival d/t good wx & operations. OOI will pay for 3 of the 6 lost days. 1 crew member/ medical evacuation.
7/25: Shift WHOI days 1 day to left
7/1: Added 1 funded day to Geyer as per email 6/28.
5/23: Add 3/25 as an operational day.
5/22: Keigwin will arrive/ depart on the same day. Transit will be 10 funded days.
5/19: 1 day added to Azores transit for magnatometer tow work.
5/17: Extra port day in 3rd leg of OOI, ONR "In Port Days" for NYC Event.
4/24: Added 3 legs to Fall OOI Pioneer, Corrected Keigwin's days from 25 to 22.
4/21: Added 2 WHOI Inst. Days before Keigwin & removed 1 day in Azores
4/5: Added 4 mobe days to Keigwin and 1 demobe in Azores for replenishment.
...Put WHOI Inst. Days to "Non-Op"
...Vessel arrived 1730/4 d/t wx, keeping operational days the same to maintain annual funded day count in schedule.
4/3: Corrected March 3 (wx day) to count, so departed 3/2 to get proper 9 days.
3/22: Depart 1 day earlier for NYC PR (5/23)
3/22: Demobe only 1 day so Geyer can depart earlier (6/23)
3/20: Becker unplanned returned to WHOI to pick up winch (3/16-17)-added a voyage/ port call (no Voyage number).
3/3: Becker departure was delayed 1 day d/t wx
2/17: Departed ship yard 2 days later than planned (was 2/15)
2/7: 2nd leg of Becker changed from March 16th to the 17th.
2/2: Split out OOI legs as per email 2/2
1/27: Added a 4th leg to Becker
1/23: OOI Pioneer (Fall) keep Oct.22-Nov.11.
1/23: Add Newport, RI pitstop to Becker (3/16)
1/18: Remove SVC coring from Keigwin until further notice.
1/9: Geyer asks to deduct 1 science day d/t vessel traffic holiday weekend. Left 4th of July open at WHOI.
1/5: Agreed to shorten the PR event by 2 days
11/7: SVC7 for coring will be done at the front of the Keigwin voyage.
11/3: Savidge and Geyer need to go back to original schedule due to personnel/ vsl traffic respectively.
10/25: PR Event after Becker, VanMooy & Savidge...
10/24: Coring arm install, SVC, WHOI Days, PR
9/01: SVC7 2016 pushed into 2017 (Coring), maybe during WHOI institutional days in Block Isl. Sound w/ Donnelly & Kegwin...TBD
8/30: Savidge transit removed
2017 schedule adjusted for 10 knots as per Port Ops.
Becker is a 3 ship operation. Armstrong + Endeavor + Sharp. March 31st was the agreed start date in March 2016 scheduling meeting.
Adjusted Navy dates 6/23 (Jon's email 6/23)
7/25: A. Bower & Saito deleted d/t denied funding
View Summary
Set Default
Associated Cruises
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
01 Jan 2017
Dep:
01 Jan 2017
Arr:
15 Feb 2017
Unload:
15 Feb 2017
Charleston, SC, USA
Charleston, SC, USA
TBD/
SA02
SA02
0N/0E
0N/0E
Albert Suchy
Maintenance
46/46
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
16 Feb 2017
Dep:
16 Feb 2017
Arr:
20 Feb 2017
Unload:
20 Feb 2017
Charleston, SC, USA
Woods Hole, MA, USA
Transit/
SA02
SA02
0N/0E
0N/0E
Albert Suchy
5/5
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Testing
Not Specified
2/NAVY-ONR/F
2 days NON OP
Not Specified
0/OTHER/F
Notes:
2 days of transit are funded by ONR for testing. 4 days of transit are non-op, but can't show both in 1 transit, so have day count as "0"
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
21 Feb 2017
Dep:
21 Feb 2017
Arr:
26 Feb 2017
Unload:
26 Feb 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
None/
SA02
SA02
0N/0E
0N/0E
Albert Suchy
Standby Days
6/6
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
27 Feb 2017
Dep:
02 Mar 2017
Arr:
10 Mar 2017
Unload:
10 Mar 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
NE Mud Patch/
NA06
NA06
40N/70W
40N/70W
Preston S. Wilson
9/12
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Seabed Acoustics
Kyle M. Becker
/
ONR
Not Specified
9/NAVY-ONR/F
Notes:
3/3: Departure was delayed 1 day d/t wx This is a 3 ship operation. Armstrong + Endevor + Sharp. Email 6/23 from Jon: (7 days shorter than previous schedule) "Armstrong: Depart WHOI 2 March - Return WHOI 10 April (Mob/De-mob as necessary before and after these dates) There will be 2 additional returns to WHOI during this period for change-out of gear and/or scientists as determined by project progress, weather, etc."
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
11 Mar 2017
Dep:
11 Mar 2017
Arr:
15 Mar 2017
Unload:
15 Mar 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
NE Mud Patch/
SA02
SA02
0N/0E
0N/0E
Kyle M. Becker
5/5
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Seabed Acoustics
Kyle M. Becker
/
ONR
Not Specified
5/NAVY-ONR/F
Notes:
Pit stop to pick up a winch
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
16 Mar 2017
Dep:
16 Mar 2017
Arr:
16 Mar 2017
Unload:
16 Mar 2017
Woods Hole, MA, USA
Newport, RI, USA
NE Mud Patch/
NA06
NA06
40N/70W
40N/70W
David P. Knobles
1/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Seabed Acoustics
Kyle M. Becker
/
ONR
Not Specified
1/NAVY-ONR/F
Notes:
Pitstop in Newport RI to pick up hazmat/ personnel. (6hr transit)
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
17 Mar 2017
Dep:
17 Mar 2017
Arr:
24 Mar 2017
Unload:
24 Mar 2017
Newport, RI, USA
Woods Hole, MA, USA
NE Mud Patch/
NA06
NA06
40N/70W
40N/70W
David P. Knobles
8/8
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Seabed Acoustics
Kyle M. Becker
/
ONR
Not Specified
8/NAVY-ONR/F
Notes:
Charging only 7 days (not 8) because we have already charged the 17th March on Leg 2. On the 3rd leg there may be a tender to the vessel for personnel.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
25 Mar 2017
Dep:
25 Mar 2017
Arr:
05 Apr 2017
Unload:
05 Apr 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
NE Mud Patch/
NA06
NA06
40N/70W
40N/70W
Charles Holland
12/12
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Seabed Acoustics
Kyle M. Becker
/
ONR
Not Specified
12/NAVY-ONR/F
Notes:
5/23: Add 3/25 as an operational day as per Al & ONR's request.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
06 Apr 2017
Dep:
06 Apr 2017
Arr:
10 Apr 2017
Unload:
12 Apr 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
NE Mud Patch/
NA06
NA06
40N/70W
40N/70W
David P. Knobles
5/7
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Seabed Acoustics
Kyle M. Becker
/
ONR
Not Specified
5/NAVY-ONR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
13 Apr 2017
Dep:
15 Apr 2017
Arr:
29 Apr 2017
Unload:
30 Apr 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
Hatteras/
NA06
NA06
37N/76W
37N/76W
Magdalena Andres
15/18
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
PEACH
Dana K. Savidge
/
Skidaway
1559476
15/NSF-OCE-PO/F
Notes:
Transit WHOI to NFK, VA: 360nm > (1.5) 2+1 = 3 days
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
01 May 2017
Dep:
03 May 2017
Arr:
22 May 2017
Unload:
22 May 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
North Atlantic/
NA06
NA06
42N/71W
42N/71W
Benjamin Van Mooy
20/22
Clearances:
Bermuda(A), Canada(A)
Project
PI/Institution
Project #
Days/Agency/Status
P redox
Benjamin Van Mooy
/
WHOI
1536346
14/NSF-OCE-CO/F
Algal-derived HCs
Christopher Reddy
/
WHOI
1634478
3/NSF-OCE-CO/F
organic phosphorus
Daniel Repeta
/
WHOI
1634080
3/NSF-OCE-CO/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
23 May 2017
Dep:
23 May 2017
Arr:
24 May 2017
Unload:
24 May 2017
Woods Hole, MA, USA
New York, NY, USA
PR Event/
SA02
SA02
0N/0E
0N/0E
Kerry Strom
Outreach
2/2
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
NYC PR Event
Not Specified
2/INST-WHOI/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
25 May 2017
Dep:
26 May 2017
Arr:
27 May 2017
Unload:
27 May 2017
New York, NY, USA
Woods Hole, MA, USA
NYC PR Event/
SA02
SA02
0N/0E
0N/0E
Kerry Strom
Outreach
2/3
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Port Days
Not Specified
2/NAVY-ONR/F
NYC PR Event
Not Specified
1/INST-WHOI/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
28 May 2017
Dep:
30 May 2017
Arr:
03 Jun 2017
Unload:
03 Jun 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
NE shelf/
NA06
NA06
39N/69W
41N/71W
Al Plueddemann
5/7
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
OOI Pioneer
Al Plueddemann
/
WHOI
Not Specified
5/NSF-OOI-OOI/F
Notes:
Leg 1
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
04 Jun 2017
Dep:
05 Jun 2017
Arr:
12 Jun 2017
Unload:
12 Jun 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
NE shelf/
NA06
NA06
39N/69W
41N/71W
Al Plueddemann
8/9
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
OOI Pioneer
Al Plueddemann
/
WHOI
Not Specified
8/NSF-OOI-OOI/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
13 Jun 2017
Dep:
14 Jun 2017
Arr:
20 Jun 2017
Unload:
20 Jun 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
NE shelf/
NA06
NA06
39N/69W
41N/71W
Al Plueddemann
7/8
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
OOI Pioneer
Al Plueddemann
/
WHOI
Not Specified
8/NSF-OOI-OOI/F
Notes:
7 days at sea but 8 charge days due to 5/17 change by OOI.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
21 Jun 2017
Dep:
21 Jun 2017
Arr:
21 Jun 2017
Unload:
21 Jun 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
None/
SA02
SA02
0N/0E
0N/0E
Albert Suchy
Standby Days
1/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
22 Jun 2017
Dep:
23 Jun 2017
Arr:
01 Jul 2017
Unload:
02 Jul 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
LIS/
NA06
NA06
41N/72W
41N/72W
Wayne R. Geyer
9/11
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
USRS
Wayne R. Geyer
/
WHOI
Not Specified
9/NAVY-ONR/F
Notes:
6/29 Geyer says after Memorial day and 2 weeks before 6/16 for better current flow. Multi boat operation. Tioga Wiker (40 foot boat) REMUS Hurricane for auv's Daily personnel transfers in / out of Conn River
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
03 Jul 2017
Dep:
05 Jul 2017
Arr:
09 Jul 2017
Unload:
10 Jul 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
OOI Pioneer/
SA02
SA02
0N/0E
0N/0E
John A. Breier
5/8
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Clio Sea Trials
John A. Breier
/
UTRGV
1333212
5/NSF-OCE-OTIC/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
11 Jul 2017
Dep:
11 Jul 2017
Arr:
24 Jul 2017
Unload:
24 Jul 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
Install Coring/
NA06
NA06
41N/70W
41N/70W
Albert Suchy
Maintenance
14/14
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Notes:
Install Coring Arm
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
25 Jul 2017
Dep:
28 Jul 2017
Arr:
24 Aug 2017
Unload:
26 Aug 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
Irminger Sea/
NA01
NA01
60N/39W
60N/39W
George H. Tupper
28/33
Clearances:
Greenland(A)
Project
PI/Institution
Project #
Days/Agency/Status
OOI Irminger Sea
Weller OOI Project Team
/
WHOI
Not Specified
31/NSF-OOI-OOI/F
Notes:
Transit from WHOI to OOI Irminger 1770nm > 7+1 + 8 days Irminger to Reykjavik 545nm > 2+1 = 3 days
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
27 Aug 2017
Dep:
27 Aug 2017
Arr:
01 Sep 2017
Unload:
01 Sep 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
Early Arrival/
SA02
SA02
0N/0E
0N/0E
Albert Suchy
Standby Days
6/6
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
02 Sep 2017
Dep:
02 Sep 2017
Arr:
03 Sep 2017
Unload:
04 Sep 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
-/
SA02
SA02
0N/0E
0N/0E
Glen Gawarkiewicz
2/3
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
WHOI Inst Sci Days
Glen Gawarkiewicz
/
WHOI
Not Specified
2/INST-WHOI/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
05 Sep 2017
Dep:
05 Sep 2017
Arr:
06 Sep 2017
Unload:
06 Sep 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
None/
SA02
SA02
0N/0E
0N/0E
Albert Suchy
Standby Days
2/2
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
07 Sep 2017
Dep:
11 Sep 2017
Arr:
01 Oct 2017
Unload:
01 Oct 2017
Woods Hole, MA, USA
Ponta Delgada, Azores (Acores), Portugal
Western N.A./
NA06
NA06
41N/70W
41N/70W
Lloyd D. Keigwin
21/25
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
deep water hydro
Lloyd D. Keigwin
/
WHOI
1558307
21/NSF-OCE-MGG/F
Notes:
4/5: Changed mobe to 4 days to accomodate the new coring system. Changed mobe/ demobe from 2 days each to 1. Added a 3 day overall transit Transits: Job Finish to Azores = 500nm/10/24 = 2 days Deadhead: Azores to WHOI = 2135nm/10/24 = 9 days WHOI to Job Start = 100nm/10/24 = .4 day ~1 day Job Finish to WHOI = 1875nm/10/24 = 8 days...~9days
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
02 Oct 2017
Dep:
02 Oct 2017
Arr:
12 Oct 2017
Unload:
13 Oct 2017
Ponta Delgada, Azores (Acores), Portugal
Woods Hole, MA, USA
Deadhead/
SA02
SA02
0N/0E
0N/0E
Mark D. Behn
11/12
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Deadhead Transit
Not Specified
10/NSF-OCE-MGG/F
Magnatometer
Mark D. Behn
/
WHOI
Not Specified
1/INST-WHOI/F
Notes:
5/22: Change Keigwin transit from the 2nd to the 3rd to account for charge days. Vessel will actually depart on the 2nd. Will demobe Keigwin at WHOI.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Oct 2017
Dep:
14 Oct 2017
Arr:
19 Oct 2017
Unload:
19 Oct 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
WHOI/
SA02
SA02
0N/0E
0N/0E
Albert Suchy
Standby Days
6/6
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
20 Oct 2017
Dep:
22 Oct 2017
Arr:
25 Oct 2017
Unload:
26 Oct 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
NE shelf/
NA06
NA06
41N/70W
41N/70W
Al Plueddemann
4/7
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
OOI Pioneer
Al Plueddemann
/
WHOI
Not Specified
4/NSF-OOI-OOI/F
Notes:
Arrived a day early d/t wx, & departed a day early. 4/5: Eric said to keep the 10/22 departure date for needed OOI preparation. He will add 2 legs in shortly...
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
27 Oct 2017
Dep:
27 Oct 2017
Arr:
04 Nov 2017
Unload:
04 Nov 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
NE shelf/
NA06
NA06
39N/69W
41N/71W
Al Plueddemann
9/9
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
OOI Pioneer
Al Plueddemann
/
WHOI
Not Specified
9/NSF-OOI-OOI/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
05 Nov 2017
Dep:
05 Nov 2017
Arr:
12 Nov 2017
Unload:
13 Nov 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
NE shelf/
NA06
NA06
39N/69W
41N/71W
Al Plueddemann
8/9
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
OOI Pioneer
Al Plueddemann
/
WHOI
Not Specified
8/NSF-OOI-OOI/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Nov 2017
Dep:
20 Nov 2017
Arr:
14 Dec 2017
Unload:
16 Dec 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
OCS - Atlantic/
NA06
NA06
36N/74W
33N/75W
Kyle M. Becker
25/33
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
ADEON
Jennifer Miksis-Olds
/
UNH
Not Specified
27/NAVY-ONR/F
Notes:
12/14: Arrived 1 day earlier d/t WX. ONR funds the lost day so the days count stays the same. 11/17: "The science party on Armstrong decided to delay sailing from Sunday to Monday 20 Nov at 1130 to avoid some weather. Tim has graciously agreed to keep Sunday 19 Nov as a paid day in port at WHOI so the number of paid days on Armstrong will remain the same. "
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
17 Dec 2017
Dep:
17 Dec 2017
Arr:
31 Dec 2017
Unload:
31 Dec 2017
Woods Hole, MA, USA
Woods Hole, MA, USA
None/
SA02
SA02
0N/0E
0N/0E
Albert Suchy
Standby Days
15/15
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Agency
Funded
Pending
Total
INST
6
0
6
NAVY
80
0
80
NSF
71
0
71
NSF-OOI
73
0
73
OTHER
0
0
0
Total
230
0
230
<
Day Type
Total
Standby Days
36
Maintenance
60
At Sea for Science
222
Outreach
4
Total
322
<
Load/Unload Days
Total
ChargeLoad
1
NonChargeLoad
29
NonChargeUnload
13
Total
43