Ship Time Request System
Search Public Records
Funded Projects
Funded Requests
Published Schedules
Search Funded Projects/Requests
All Ports
All Ancillary Facilities
UNOLS Equipment Inventory
All Ships
Help
Suggestions/Request Help
Frequently Asked Questions
Log In
View Schedule
or
schedule as:
Expanded (Text)
Condensed (Text)
Expanded (PDF)
Send schedule email to:
*
One or more invalid email addresses
Note for recipient(s):
the schedule as:
Excel XML
CSV
Google Earth Map (KML)
ICal Calendar
2018
-
Roger Revelle
With Naif/Torres/Naif after GEOTRACES
Final
- ID #
13695
Version #
2
-
1/22/2019
Scheduling Contact(s)
Hannah Delapp
shipsked*%*%*ucsd^%^%^edu
(858) 534-2841
Notes:
Begin Mid-life refit through January of 2020.
Includes 10 days of unscheduled UC ship funded cruises.
Rocap SD RT.
Klein in May on Ride.
Pythia's Oasis deferred to 2019.
Keil's departure date is based on Mexican clearance request, it could run a bit later.
10/3 Per con with D. Siegel, rearrange EXPORTS port days.
10/9 ONR to pay for the transit Papeete to San Diego after GEOTRACES
10/17 Eliminate the Kodiak personnel stop, redistribute cost share, add one additional day in Papeete port stop.
11/13 Shipyard confirmed-Vigor Portland, OR
11/21 Add a UC component (Constable instrument recovery/student participation) to transit San Diego- Newport
11/28 Change personnel exchange-port days in Manzanillo per chief scientist.
12/07 Convert 14 days UW/Other to NSF on Rocap/Keil. Convert 10 NSF/OOI on OOI Cabled Array/Kelley to NSF.
12/8 Added the non-op transit to the shipyard.
12/20 Removed Brodsky, added Jason engineering test. Added Derosier UC funded cruise.
12/29 Delay sailing to the shipyard.
1/12 To conserve science transit time, the starting port for D.Kelley and end port for D. Chadwell has been changed from Seattle, WA to Newport, OR.
2/5 Revised OOI operations for D. Kelley, split project into 4 legs. Advanced departure from San Diego one day.
2/27 Add sea trial 2/27 and advance return to San Diego from the shipyard.
3/1 Replaced two days of NASA funding with NSF funding on EXPORTS.
3/20 The proportional transit cost allocation was revised for transit San Diego to Newport.
6/5 Delay Mid-Life refit to carry out two NSF projects off New Zealand. I will continue to make adjustments to the cruises in and out of New Zealand as needed.
6/25 Chief scientist re-assignment for 2 of the Kelley OOI cruises.
10/11 Hull cleaning to take place in Papeete
10/16 Changed transit San Diego to Newport in May as "at sea for science".
1/14 Changed 16 days from "Available for Service" to "Stand By Days".
1/22 Lost one day-date line crossing in December = 364 day year.
View Summary
Set Default
Associated Cruises
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
01 Jan 2018
Dep:
01 Jan 2018
Arr:
03 Jan 2018
Unload:
03 Jan 2018
San Diego, CA, USA
San Diego, CA, USA
homeport/
NP09
NP09
33N/117W
33N/117W
Stephen Z. Kelety
Outreach
3/3
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Notes:
Outreach dates: 2/2, 5/26, 9/8
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
04 Jan 2018
Dep:
04 Jan 2018
Arr:
08 Jan 2018
Unload:
08 Jan 2018
San Diego, CA, USA
San Diego, CA, USA
homeport/
NP09
NP09
33N/117W
33N/117W
Stephen Z. Kelety
Standby Days
5/5
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
09 Jan 2018
Dep:
09 Jan 2018
Arr:
13 Jan 2018
Unload:
13 Jan 2018
San Diego, CA, USA
Portland, OR, USA
to the shipyard/
NP09
NP09
48N/122W
33N/117W
Bruce Appelgate
Transit Cruise
5/5
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Jan 2018
Dep:
14 Jan 2018
Arr:
26 Feb 2018
Unload:
26 Feb 2018
Portland, OR, USA
Portland, OR, USA
Vigor Portland/
NP09
NP09
33N/117W
33N/117W
Stephen Z. Kelety
Maintenance
44/44
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Notes:
Regulatory shipyard Vigor Portland, OR
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
27 Feb 2018
Dep:
27 Feb 2018
Arr:
27 Feb 2018
Unload:
27 Feb 2018
Portland, OR, USA
Portland, OR, USA
Sea Trials/
NP09
NP09
33N/117W
33N/117W
Stephen Z. Kelety
1/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Notes:
Sea Trials Portland, OR
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
28 Feb 2018
Dep:
28 Feb 2018
Arr:
02 Mar 2018
Unload:
02 Mar 2018
Portland, OR, USA
Portland, OR, USA
Vigor Portland/
NP09
NP09
33N/117W
33N/117W
Stephen Z. Kelety
Maintenance
3/3
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Notes:
Regulatory shipyard Vigor Portland, OR
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
03 Mar 2018
Dep:
03 Mar 2018
Arr:
07 Mar 2018
Unload:
07 Mar 2018
Portland, OR, USA
San Diego, CA, USA
transit OR-SD/
NP09
NP09
48N/122W
33N/117W
Bruce Appelgate
Transit Cruise
5/5
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Relocation for Keil
Not Specified
5/NSF-OCE-BIO/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
08 Mar 2018
Dep:
08 Mar 2018
Arr:
23 Mar 2018
Unload:
23 Mar 2018
San Diego, CA, USA
San Diego, CA, USA
homeport/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
16/16
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Notes:
To fuel pier 3/14
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
24 Mar 2018
Dep:
27 Mar 2018
Arr:
13 Apr 2018
Unload:
13 Apr 2018
San Diego, CA, USA
Manzanillo, Mexico
western Mexico/
NP12
NP13
9N/138W
14N/114W
Richard G. Keil
18/21
Clearances:
Mexico(A)
Ancil Facs:
Cold Lab Van, General Purpose Lab Van
Project
PI/Institution
Project #
Days/Agency/Status
Exchange for UW/othe
Gabrielle Rocap
/
UW
Not Specified
14/NSF-OCE-IPS/F
ODZ dimensions
Gabrielle Rocap
/
UW
1542240 (Diversity)
4/NSF-OCE-BIO/F
OMZ expansions
Allan Devol
/
UW
1657958
0/NSF-OCE-CO/F
Notes:
14 days-- UW Institutional funds exchanged with NSF funds. Personnel exchange only.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Apr 2018
Dep:
14 Apr 2018
Arr:
02 May 2018
Unload:
04 May 2018
Manzanillo, Mexico
San Diego, CA, USA
western Mexico/
NP12
NP13
9N/138W
14N/114W
Richard G. Keil
19/21
Clearances:
Mexico(A)
Ancil Facs:
Cold Lab Van, General Purpose Lab Van
Project
PI/Institution
Project #
Days/Agency/Status
ODZ dimensions
Gabrielle Rocap
/
UW
1542240 (Diversity)
17/NSF-OCE-BIO/F
OMZ expansions
Allan Devol
/
UW
1657958
2/NSF-OCE-CO/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
05 May 2018
Dep:
05 May 2018
Arr:
14 May 2018
Unload:
14 May 2018
San Diego, CA, USA
San Diego, CA, USA
homeport/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
10/10
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
15 May 2018
Dep:
19 May 2018
Arr:
23 May 2018
Unload:
25 May 2018
San Diego, CA, USA
San Diego, CA, USA
offshore CA/
NP09
NP09
32N/121W
34N/124W
Matt Heintz
5/11
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Jason Engineering
Matt Heintz
/
WHOI
Not Specified
5/NSF-OCE-IPS/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
26 May 2018
Dep:
30 May 2018
Arr:
10 Jun 2018
Unload:
11 Jun 2018
San Diego, CA, USA
Newport, OR, USA
California/
NP09
NP09
42N/132W
37N/132W
Valeria Reyes
12/17
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Mendocino
Steven Constable
/
SIO
Not Specified
5/INST-UCSD-SIO/F
Oregon vibracoring
Boe Derosier
/
SIO
Not Specified
4/INST-UCSD-SIO/F
transitNSF STEM-SEAS
Not Specified
2/NSF-OCE-IPS/F
transit EXPORTS
Not Specified
1/NASA/F
transit Kelley OOI
Not Specified
1/NSF-OOI-OOI/F
Notes:
The transit cost distribution was proportionally allocated per the UNOLS Transit Policy. Additional UC funded projects were added to the project.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
12 Jun 2018
Dep:
13 Jun 2018
Arr:
17 Jun 2018
Unload:
18 Jun 2018
Newport, OR, USA
Newport, OR, USA
off Newport/
NP09
NP09
33N/117W
33N/117W
C. D. Chadwell
5/7
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Cascadia GPS-A
C. D. Chadwell
/
SIO
1657961
7/NSF-OCE-MGG/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
19 Jun 2018
Dep:
23 Jun 2018
Arr:
29 Jun 2018
Unload:
30 Jun 2018
Newport, OR, USA
Newport, OR, USA
Juan de Fuca/
NP09
NP09
45N/127W
44N/125W
Deborah S. Kelley
7/12
Clearances:
NONE(T)
Ancil Facs:
Jason
Project
PI/Institution
Project #
Days/Agency/Status
Cabled Array O&M
Deborah S. Kelley
/
UW
Not Specified
11/NSF-OOI-OOI/F
MARUM
Deborah S. Kelley
/
UW
Not Specified
1/OTHER/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
01 Jul 2018
Dep:
01 Jul 2018
Arr:
11 Jul 2018
Unload:
13 Jul 2018
Newport, OR, USA
Newport, OR, USA
Juan de Fuca/
NP09
NP09
45N/127W
44N/125W
Deborah S. Kelley
11/13
Clearances:
NONE(T)
Ancil Facs:
Jason
Project
PI/Institution
Project #
Days/Agency/Status
Cabled Array O&M
Deborah S. Kelley
/
UW
Not Specified
9/NSF-OOI-OOI/F
Cabled SCPR
Mark A. Zumberge
/
SIO
1657797
1/NSF-OCE-MGG/F
Heat flow at ASHES
Karen Bemis
/
Rutgers_IMCS
1736702
1/NSF-OCE-MGG/F
Heat flow at ASHES
Karen Bemis
/
Rutgers_IMCS
1736702
1/NSF-OCE-OTIC/F
HTVE-UE
Jeffrey Breedlove
/
Creare
N68335-16-C-0383
1/NAVY-ONR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Jul 2018
Dep:
14 Jul 2018
Arr:
18 Jul 2018
Unload:
19 Jul 2018
Newport, OR, USA
Newport, OR, USA
Juan de Fuca/
NP09
NP09
45N/127W
44N/125W
Gerald (Skip) Denny
5/6
Clearances:
NONE(T)
Ancil Facs:
Jason
Project
PI/Institution
Project #
Days/Agency/Status
Cabled Array O&M
Deborah S. Kelley
/
UW
Not Specified
5/NSF-OOI-OOI/F
Flipping Tilt
William S. Wilcock
/
UW
1634103
1/NSF-OCE-OTIC/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
20 Jul 2018
Dep:
20 Jul 2018
Arr:
03 Aug 2018
Unload:
05 Aug 2018
Newport, OR, USA
Seattle, WA, USA
Juan de Fuca/
NP09
NP09
45N/127W
44N/125W
Orest Kawka
15/17
Clearances:
NONE(T)
Ancil Facs:
Jason
Project
PI/Institution
Project #
Days/Agency/Status
Exchange for UW fund
Deborah S. Kelley
/
UW
Not Specified
10/NSF-OCE-IPS/F
Cabled Array O&M
Deborah S. Kelley
/
UW
Not Specified
5/NSF-OOI-OOI/F
Heat flow at ASHES
Karen Bemis
/
Rutgers_IMCS
1736702
1/NSF-OCE-MGG/F
Heat flow at ASHES
Karen Bemis
/
Rutgers_IMCS
1736702
1/NSF-OCE-OTIC/F
Notes:
Note: Per ONR/NSF and UW 10 days will be charged to NSF for OOI Cabled Array cruise (Kelley).
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
06 Aug 2018
Dep:
10 Aug 2018
Arr:
12 Sep 2018
Unload:
13 Sep 2018
Seattle, WA, USA
Seattle, WA, USA
NE Pacific/
NP06
NP06
50N/145W
50N/145W
Deborah Steinberg
34/39
Clearances:
Canada(A)
Project
PI/Institution
Project #
Days/Agency/Status
EXPORTS
Paula Bontempi
/
NASA Headquarters
Not Specified
37/NASA/F
Diatoms and EXPORTS
Bethany Jenkins
/
URI-Kingston
1756816
2/NSF-OCE-BIO/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Sep 2018
Dep:
18 Sep 2018
Arr:
21 Oct 2018
Unload:
22 Oct 2018
Seattle, WA, USA
Hilo, HI, USA
152 W/
NP06
SP02
57N/152W
18S/150W
Gregory A. Cutter
34/39
Clearances:
Canada(A)
Ancil Facs:
Other Facility, General Purpose Lab Van
Project
PI/Institution
Project #
Days/Agency/Status
US GPMT
Gregory A. Cutter
/
ODU_OEAS
1658318
38/NSF-OCE-CO/F
add. tran. cost dist
Phoebe J. Lam
/
UCSC
Not Specified
1/NASA/F
Notes:
Hilo, Hawaii for fueling and re-provisioning. One day savings starting from Seattle vs. Seattle to Kodiak. 4 additional days starting in Seattle vs. Seward 1 NASA 3 NSF Canadian clearance requested for EXPORTS and GEOTRACES Outreach/tours during port stop.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
23 Oct 2018
Dep:
24 Oct 2018
Arr:
24 Nov 2018
Unload:
27 Nov 2018
Hilo, HI, USA
Papeete, Tahiti, French Polynesia
152 W/
NP06
SP02
57N/152W
18S/150W
Gregory A. Cutter
32/36
Clearances:
French Polynesia(A), Kiribati(A)
Ancil Facs:
Other Facility, General Purpose Lab Van
Project
PI/Institution
Project #
Days/Agency/Status
US GPMT
Gregory A. Cutter
/
ODU_OEAS
1658318
36/NSF-OCE-CO/F
Notes:
Hull cleaning to begin 11/27. Sail date to Wellington may be adjusted earlier depending on hull cleaning progress. Transit time calculation assumes a 0800 departure. Allowed a total of 5 days for cleaning in addition to 3 days Geotraces offload days.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
28 Nov 2018
Dep:
01 Dec 2018
Arr:
10 Dec 2018
Unload:
13 Dec 2018
Papeete, Tahiti, French Polynesia
Wellington, New Zealand
transit to NZ/
SP02
SP04
18S/150W
41S/175E
Bruce Appelgate
Transit Cruise
9/15
Clearances:
New Zealand(A)
Project
PI/Institution
Project #
Days/Agency/Status
Relocation to NZ
Bruce Appelgate
/
SIO
Not Specified
15/NSF-OCE-MGG/F
Notes:
Cross Dateline, from (UTC -10) to (UTC +12) One day lost. NZ clearance requested beginning 7 December.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Dec 2018
Dep:
16 Dec 2018
Arr:
13 Jan 2019
Unload:
14 Jan 2019
Wellington, New Zealand
Wellington, New Zealand
New Zealand/
SP04
SP04
42S/176E
38S/180W
Samer Naif
16/18
Clearances:
New Zealand(A)
Project
PI/Institution
Project #
Days/Agency/Status
HT-RESIST
Samer Naif
/
GaTech
1737328
18/NSF-OCE-MGG/F
Notes:
29 sea days 3 port days.
Agency
Funded
Pending
Total
INST
9
0
9
NASA
39
0
39
NAVY
1
0
1
NSF
181
0
181
NSF-OOI
31
0
31
OTHER
1
0
1
Total
262
0
262
<
Day Type
Total
Available for Service
10
Transit Cruise
19
Standby Days
21
Maintenance
47
At Sea for Science
214
Outreach
3
Total
314
<
Load/Unload Days
Total
ChargeLoad
19
ChargeUnload
16
NonChargeLoad
11
NonChargeUnload
4
Total
50