View Schedule

or schedule as:
the schedule as:
  2018 - Roger Revelle  
With Naif/Torres/Naif after GEOTRACES
Final - ID #13695    Version #2 - 1/22/2019

Scheduling Contact(s)
Hannah Delapp shipsked*%*%*ucsd^%^%^edu (858) 534-2841

  Notes:   Begin Mid-life refit through January of 2020.
Includes 10 days of unscheduled UC ship funded cruises.
Rocap SD RT.
Klein in May on Ride.
Pythia's Oasis deferred to 2019.
Keil's departure date is based on Mexican clearance request, it could run a bit later.
10/3 Per con with D. Siegel, rearrange EXPORTS port days.
10/9 ONR to pay for the transit Papeete to San Diego after GEOTRACES
10/17 Eliminate the Kodiak personnel stop, redistribute cost share, add one additional day in Papeete port stop.
11/13 Shipyard confirmed-Vigor Portland, OR
11/21 Add a UC component (Constable instrument recovery/student participation) to transit San Diego- Newport
11/28 Change personnel exchange-port days in Manzanillo per chief scientist.
12/07 Convert 14 days UW/Other to NSF on Rocap/Keil. Convert 10 NSF/OOI on OOI Cabled Array/Kelley to NSF.
12/8 Added the non-op transit to the shipyard.
12/20 Removed Brodsky, added Jason engineering test. Added Derosier UC funded cruise.
12/29 Delay sailing to the shipyard.
1/12 To conserve science transit time, the starting port for D.Kelley and end port for D. Chadwell has been changed from Seattle, WA to Newport, OR.
2/5 Revised OOI operations for D. Kelley, split project into 4 legs. Advanced departure from San Diego one day.
2/27 Add sea trial 2/27 and advance return to San Diego from the shipyard.
3/1 Replaced two days of NASA funding with NSF funding on EXPORTS.
3/20 The proportional transit cost allocation was revised for transit San Diego to Newport.
6/5 Delay Mid-Life refit to carry out two NSF projects off New Zealand. I will continue to make adjustments to the cruises in and out of New Zealand as needed.
6/25 Chief scientist re-assignment for 2 of the Kelley OOI cruises.
10/11 Hull cleaning to take place in Papeete
10/16 Changed transit San Diego to Newport in May as "at sea for science".
1/14 Changed 16 days from "Available for Service" to "Stand By Days".
1/22 Lost one day-date line crossing in December = 364 day year.
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jan 2018
Dep:01 Jan 2018
Arr:03 Jan 2018
Unload:03 Jan 2018
 
San Diego, CA, USA
San Diego, CA, USA
 
homeport/
NP09
NP09
 
 
 
33N/117W
33N/117W
 
  Stephen Z. Kelety
Outreach
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Outreach dates: 2/2, 5/26, 9/8

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:04 Jan 2018
Dep:04 Jan 2018
Arr:08 Jan 2018
Unload:08 Jan 2018
 
San Diego, CA, USA
San Diego, CA, USA
 
homeport/
NP09
NP09
 
 
 
33N/117W
33N/117W
 
  Stephen Z. Kelety
Standby Days
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Jan 2018
Dep:09 Jan 2018
Arr:13 Jan 2018
Unload:13 Jan 2018
 
San Diego, CA, USA
Portland, OR, USA
 
to the shipyard/
NP09
NP09
 
 
 
48N/122W
33N/117W
 
  Bruce Appelgate
Transit Cruise
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Jan 2018
Dep:14 Jan 2018
Arr:26 Feb 2018
Unload:26 Feb 2018
 
Portland, OR, USA
Portland, OR, USA
 
Vigor Portland/
NP09
NP09
 
 
 
33N/117W
33N/117W
 
  Stephen Z. Kelety
Maintenance
  44/44

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Regulatory shipyard Vigor Portland, OR

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:27 Feb 2018
Dep:27 Feb 2018
Arr:27 Feb 2018
Unload:27 Feb 2018
 
Portland, OR, USA
Portland, OR, USA
 
Sea Trials/
NP09
NP09
 
 
 
33N/117W
33N/117W
 
  Stephen Z. Kelety
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Sea Trials Portland, OR

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:28 Feb 2018
Dep:28 Feb 2018
Arr:02 Mar 2018
Unload:02 Mar 2018
 
Portland, OR, USA
Portland, OR, USA
 
Vigor Portland/
NP09
NP09
 
 
 
33N/117W
33N/117W
 
  Stephen Z. Kelety
Maintenance
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Regulatory shipyard Vigor Portland, OR

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:03 Mar 2018
Dep:03 Mar 2018
Arr:07 Mar 2018
Unload:07 Mar 2018
 
Portland, OR, USA
San Diego, CA, USA
 
transit OR-SD/
NP09
NP09
 
 
 
48N/122W
33N/117W
 
  Bruce Appelgate
Transit Cruise
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Relocation for Keil Not Specified 5/NSF-OCE-BIO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:08 Mar 2018
Dep:08 Mar 2018
Arr:23 Mar 2018
Unload:23 Mar 2018
 
San Diego, CA, USA
San Diego, CA, USA
 
homeport/
NP09
NP09
 
 
 
33N/117W
33N/117W
 
  Bruce Appelgate
Standby Days
  16/16

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: To fuel pier 3/14

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:24 Mar 2018
Dep:27 Mar 2018
Arr:13 Apr 2018
Unload:13 Apr 2018
 
San Diego, CA, USA
Manzanillo, Mexico
 
western Mexico/
NP12
NP13
 
 
 
9N/138W
14N/114W
 
  Richard G. Keil
  18/21

Clearances: Mexico(A)

Ancil Facs: Cold Lab Van, General Purpose Lab Van
 
Project PI/Institution Project # Days/Agency/Status
Exchange for UW/othe Gabrielle Rocap/UW Not Specified 14/NSF-OCE-IPS/F
ODZ dimensions Gabrielle Rocap/UW 1542240 (Diversity) 4/NSF-OCE-BIO/F
OMZ expansions Allan Devol/UW 1657958 0/NSF-OCE-CO/F
 
Notes: 14 days-- UW Institutional funds exchanged with NSF funds. Personnel exchange only.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Apr 2018
Dep:14 Apr 2018
Arr:02 May 2018
Unload:04 May 2018
 
Manzanillo, Mexico
San Diego, CA, USA
 
western Mexico/
NP12
NP13
 
 
 
9N/138W
14N/114W
 
  Richard G. Keil
  19/21

Clearances: Mexico(A)

Ancil Facs: Cold Lab Van, General Purpose Lab Van
 
Project PI/Institution Project # Days/Agency/Status
ODZ dimensions Gabrielle Rocap/UW 1542240 (Diversity) 17/NSF-OCE-BIO/F
OMZ expansions Allan Devol/UW 1657958 2/NSF-OCE-CO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:05 May 2018
Dep:05 May 2018
Arr:14 May 2018
Unload:14 May 2018
 
San Diego, CA, USA
San Diego, CA, USA
 
homeport/
NP09
NP09
 
 
 
33N/117W
33N/117W
 
  Bruce Appelgate
Available for Service
  10/10

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:15 May 2018
Dep:19 May 2018
Arr:23 May 2018
Unload:25 May 2018
 
San Diego, CA, USA
San Diego, CA, USA
 
offshore CA/
NP09
NP09
 
 
 
32N/121W
34N/124W
 
  Matt Heintz
  5/11

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Jason Engineering Matt Heintz/WHOI Not Specified 5/NSF-OCE-IPS/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:26 May 2018
Dep:30 May 2018
Arr:10 Jun 2018
Unload:11 Jun 2018
 
San Diego, CA, USA
Newport, OR, USA
 
California/
NP09
NP09
 
 
 
42N/132W
37N/132W
 
  Valeria Reyes
  12/17

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Mendocino Steven Constable/SIO Not Specified 5/INST-UCSD-SIO/F
Oregon vibracoring Boe Derosier/SIO Not Specified 4/INST-UCSD-SIO/F
transitNSF STEM-SEAS Not Specified 2/NSF-OCE-IPS/F
transit EXPORTS Not Specified 1/NASA/F
transit Kelley OOI Not Specified 1/NSF-OOI-OOI/F
 
Notes: The transit cost distribution was proportionally allocated per the UNOLS Transit Policy. Additional UC funded projects were added to the project.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:12 Jun 2018
Dep:13 Jun 2018
Arr:17 Jun 2018
Unload:18 Jun 2018
 
Newport, OR, USA
Newport, OR, USA
 
off Newport/
NP09
NP09
 
 
 
33N/117W
33N/117W
 
  C. D. Chadwell
  5/7

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Cascadia GPS-A C. D. Chadwell/SIO 1657961 7/NSF-OCE-MGG/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Jun 2018
Dep:23 Jun 2018
Arr:29 Jun 2018
Unload:30 Jun 2018
 
Newport, OR, USA
Newport, OR, USA
 
Juan de Fuca/
NP09
NP09
 
 
 
45N/127W
44N/125W
 
  Deborah S. Kelley
  7/12

Clearances: NONE(T)

Ancil Facs: Jason
 
Project PI/Institution Project # Days/Agency/Status
Cabled Array O&M Deborah S. Kelley/UW Not Specified 11/NSF-OOI-OOI/F
MARUM Deborah S. Kelley/UW Not Specified 1/OTHER/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jul 2018
Dep:01 Jul 2018
Arr:11 Jul 2018
Unload:13 Jul 2018
 
Newport, OR, USA
Newport, OR, USA
 
Juan de Fuca/
NP09
NP09
 
 
 
45N/127W
44N/125W
 
  Deborah S. Kelley
  11/13

Clearances: NONE(T)

Ancil Facs: Jason
 
Project PI/Institution Project # Days/Agency/Status
Cabled Array O&M Deborah S. Kelley/UW Not Specified 9/NSF-OOI-OOI/F
Cabled SCPR Mark A. Zumberge/SIO 1657797 1/NSF-OCE-MGG/F
Heat flow at ASHES Karen Bemis/Rutgers_IMCS 1736702 1/NSF-OCE-MGG/F
Heat flow at ASHES Karen Bemis/Rutgers_IMCS 1736702 1/NSF-OCE-OTIC/F
HTVE-UE Jeffrey Breedlove/Creare N68335-16-C-0383 1/NAVY-ONR/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Jul 2018
Dep:14 Jul 2018
Arr:18 Jul 2018
Unload:19 Jul 2018
 
Newport, OR, USA
Newport, OR, USA
 
Juan de Fuca/
NP09
NP09
 
 
 
45N/127W
44N/125W
 
  Gerald (Skip) Denny
  5/6

Clearances: NONE(T)

Ancil Facs: Jason
 
Project PI/Institution Project # Days/Agency/Status
Cabled Array O&M Deborah S. Kelley/UW Not Specified 5/NSF-OOI-OOI/F
Flipping Tilt William S. Wilcock/UW 1634103 1/NSF-OCE-OTIC/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 Jul 2018
Dep:20 Jul 2018
Arr:03 Aug 2018
Unload:05 Aug 2018
 
Newport, OR, USA
Seattle, WA, USA
 
Juan de Fuca/
NP09
NP09
 
 
 
45N/127W
44N/125W
 
  Orest Kawka
  15/17

Clearances: NONE(T)

Ancil Facs: Jason
 
Project PI/Institution Project # Days/Agency/Status
Exchange for UW fund Deborah S. Kelley/UW Not Specified 10/NSF-OCE-IPS/F
Cabled Array O&M Deborah S. Kelley/UW Not Specified 5/NSF-OOI-OOI/F
Heat flow at ASHES Karen Bemis/Rutgers_IMCS 1736702 1/NSF-OCE-MGG/F
Heat flow at ASHES Karen Bemis/Rutgers_IMCS 1736702 1/NSF-OCE-OTIC/F
 
Notes: Note: Per ONR/NSF and UW 10 days will be charged to NSF for OOI Cabled Array cruise (Kelley).

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Aug 2018
Dep:10 Aug 2018
Arr:12 Sep 2018
Unload:13 Sep 2018
 
Seattle, WA, USA
Seattle, WA, USA
 
NE Pacific/
NP06
NP06
 
 
 
50N/145W
50N/145W
 
  Deborah Steinberg
  34/39

Clearances: Canada(A)
 
Project PI/Institution Project # Days/Agency/Status
EXPORTS Paula Bontempi/NASA Headquarters Not Specified 37/NASA/F
Diatoms and EXPORTS Bethany Jenkins/URI-Kingston 1756816 2/NSF-OCE-BIO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Sep 2018
Dep:18 Sep 2018
Arr:21 Oct 2018
Unload:22 Oct 2018
 
Seattle, WA, USA
Hilo, HI, USA
 
152 W/
NP06
SP02
 
 
 
57N/152W
18S/150W
 
  Gregory A. Cutter
  34/39

Clearances: Canada(A)

Ancil Facs: Other Facility, General Purpose Lab Van
 
Project PI/Institution Project # Days/Agency/Status
US GPMT Gregory A. Cutter/ODU_OEAS 1658318 38/NSF-OCE-CO/F
add. tran. cost dist Phoebe J. Lam/UCSC Not Specified 1/NASA/F
 
Notes: Hilo, Hawaii for fueling and re-provisioning. One day savings starting from Seattle vs. Seattle to Kodiak. 4 additional days starting in Seattle vs. Seward 1 NASA 3 NSF Canadian clearance requested for EXPORTS and GEOTRACES Outreach/tours during port stop.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:23 Oct 2018
Dep:24 Oct 2018
Arr:24 Nov 2018
Unload:27 Nov 2018
 
Hilo, HI, USA
Papeete, Tahiti, French Polynesia
 
152 W/
NP06
SP02
 
 
 
57N/152W
18S/150W
 
  Gregory A. Cutter
  32/36

Clearances: French Polynesia(A), Kiribati(A)

Ancil Facs: Other Facility, General Purpose Lab Van
 
Project PI/Institution Project # Days/Agency/Status
US GPMT Gregory A. Cutter/ODU_OEAS 1658318 36/NSF-OCE-CO/F
 
Notes: Hull cleaning to begin 11/27. Sail date to Wellington may be adjusted earlier depending on hull cleaning progress. Transit time calculation assumes a 0800 departure. Allowed a total of 5 days for cleaning in addition to 3 days Geotraces offload days.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:28 Nov 2018
Dep:01 Dec 2018
Arr:10 Dec 2018
Unload:13 Dec 2018
 
Papeete, Tahiti, French Polynesia
Wellington, New Zealand
 
transit to NZ/
SP02
SP04
 
 
 
18S/150W
41S/175E
 
  Bruce Appelgate
Transit Cruise
  9/15

Clearances: New Zealand(A)
 
Project PI/Institution Project # Days/Agency/Status
Relocation to NZ Bruce Appelgate/SIO Not Specified 15/NSF-OCE-MGG/F
 
Notes: Cross Dateline, from (UTC -10) to (UTC +12) One day lost. NZ clearance requested beginning 7 December.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Dec 2018
Dep:16 Dec 2018
Arr:13 Jan 2019
Unload:14 Jan 2019
 
Wellington, New Zealand
Wellington, New Zealand
 
New Zealand/
SP04
SP04
 
 
 
42S/176E
38S/180W
 
  Samer Naif
  16/18

Clearances: New Zealand(A)
 
Project PI/Institution Project # Days/Agency/Status
HT-RESIST Samer Naif/GaTech 1737328 18/NSF-OCE-MGG/F
 
Notes: 29 sea days 3 port days.
Agency   Funded   Pending   Total
INST   9   0   9
NASA   39   0   39
NAVY   1   0   1
NSF   181   0   181
NSF-OOI   31   0   31
OTHER   1   0   1
Total  262 0 262
<
Day Type   Total
Available for Service   10
Transit Cruise   19
Standby Days   21
Maintenance   47
At Sea for Science   214
Outreach   3
Total  314
<
Load/Unload Days   Total
ChargeLoad   19
ChargeUnload   16
NonChargeLoad   11
NonChargeUnload   4
Total  50