|
Flipping Tilt
-
2017
-
Thomas G. Thompson
|
|
|
Project Title: |
A Flipping Tiltmeter for Marine Geodesy: Development and Testing at Axial Seamount on the OOI Cabled Array |
Project Status: |
Submitted |
Principal Investigator: |
William S. Wilcock, UW |
Project Institution: |
UW |
Project ID: |
105152 |
Version #: |
1 |
Date Submitted: |
2/2/2016 2:44:00 PM |
Created By: |
William S. Wilcock |
Date Last Modified: |
7/28/2016 1:17:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE/OTIC - 1634103 - Funded |
Summary of Field Work: |
Deploy a new design of tiltmeter on Axial Seamount attached to the OOI Cabled observatory. |
Summary of Facility Requirements: |
1 day added to OOI cabled array Global/Jason ROV servicing cruise |
Summary of other requirements and comments: |
As per the guidelines on the OOI website (http://oceanobservatories.org/information-for-researchers/) and a discussion with the cabled array operators, this a request for 1 day of ship time to be added to the OOI cable array servicing cruise in 2017.
It is estimated that attaching the tiltmeter in 2017 will add about ~12 hours to this cruise as will recovering it in 2018 (or possibly at a later date). The requested day is therefore the combined time it is anticipated that deploying and recovering the instrument will take |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1008243 |
Created By: |
William S. Wilcock |
Date Last Modified: |
2/2/2016 2:44:00 PM |
Date Submitted: |
2/2/2016 2:44:00 PM |
|
Year: |
2017
|
Ship/Facility: |
Thomas G. Thompson
|
Optimum Start Date:
|
8/1/2017 |
Dates to Avoid: |
This needs to be added to the OOI cabled array servicing cruise |
|
|
|
|
Earliest Start Date: |
6/1/2017 |
Multi-Ship Op: |
No |
Latest Start Date: |
9/15/2017 |
Other Ship(s): |
N/A |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
1 |
0 |
0 |
0 |
1 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
N/A |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
N/A |
|
Short Description of Op Area
for use in schedules: |
Axial Seamount |
Description of Op Area: |
Axial Seamount |
Op Area Size/Dia.: |
5 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
N/A |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Newport, OR, USA |
None, , None, |
Newport, OR, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Nearest port |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
William S. Wilcock, UW |
# in Science Party |
4 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
We need a minimum of 1 berth on the OOI cruise for the engineer but preferably 3 for the PI, grad student and engineer (+ the required operator technician gives 4) |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
N/A
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
OOI cabled array servicing cruise |
|