  2020 - Hugh R. Sharp  
COVID-19 impacts Reschedule for CY2020
Final - ID #14211    Version #12 - 12/17/2020

Scheduling Contact(s)
Jon Swallow jswallow*%*%*udel^%^%^edu (302) 396-8565

  Notes:   2020 US Academic Research Fleet vessel schedules are subject to change as the COVID-19 pandemic evolves. Scheduled cruise Chief Scientists are urged to keep in close contact with the vessel operators to remain aware of any updates/changes.

11/19/2020 - EPA returned one day early.
11/13/2020 - add ABS Insp in Dec.
10/26/20 - add EPA ROV cruise
9/18/20 - Shift JO from Nov to Oct.
8/21/20 - cnx GG#2 per PI request.
8/10/20 - shift GG#2 left
8/03/20 - NRL missions Fialkowski and Liu post poned due to COVID per PI request.
7/08/20 - NOAA Scallop mission Jul-Aug cancelled due to COVID impacts to science prep, virus trajectory, and need for personnel to work in close proximity to each other.
5/22/20 - Shift GG left and ZL right
5/20/20 - Update and move from LOI to Secure.
- JKessler mission moved to 2022 due to COVID-19 impacts to schedule - GG cruise 1 cancelled - Other missions rescheduled and/or reduced.
NOTE: Days for outfitting etc. between science missions to be updated on future date.
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jan 2020
Dep:01 Jan 2020
Arr:01 Jan 2020
Unload:01 Jan 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
Home Port/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: New Year's Day

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Jan 2020
Dep:02 Jan 2020
Arr:03 Jan 2020
Unload:03 Jan 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Upkeep and Outfitting days in port.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:04 Jan 2020
Dep:04 Jan 2020
Arr:05 Jan 2020
Unload:05 Jan 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Weekend day(s) in home port

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Jan 2020
Dep:06 Jan 2020
Arr:06 Jan 2020
Unload:06 Jan 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Upkeep and Outfitting days in port.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Jan 2020
Dep:07 Jan 2020
Arr:11 Mar 2020
Unload:11 Mar 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
Shipyard TBD/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Overhaul or Repair
  65/65

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Shipyard period in Jacksonville, FL. Includes 9 days of transit time.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:12 Mar 2020
Dep:12 Mar 2020
Arr:13 Mar 2020
Unload:13 Mar 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Upkeep and Outfitting days in port.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Mar 2020
Dep:14 Mar 2020
Arr:15 Mar 2020
Unload:15 Mar 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Weekend day(s) in home port

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:16 Mar 2020
Dep:16 Mar 2020
Arr:18 Mar 2020
Unload:18 Mar 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Prep ship for COVID Stand down. GG cruise starting 3/16 cancelled per UNOLS sea mission stand down (effective 3/13/2020).

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Mar 2020
Dep:19 Mar 2020
Arr:20 Mar 2020
Unload:20 Mar 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Inspection
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Moved ABS inspection up to complete asap during COVID outbreak. Prep 3/19, ABS Annuals 3/20

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:21 Mar 2020
Dep:21 Mar 2020
Arr:31 May 2020
Unload:31 May 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  72/72

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Suspension of Ops and limited on-site work due to COVID-19 shut down.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jun 2020
Dep:01 Jun 2020
Arr:27 Jun 2020
Unload:27 Jun 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  27/27

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Gradual ramp up of outfitting and maintenance during UNOLS Suspension of Ops due to COVID-19.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:28 Jun 2020
Dep:30 Jun 2020
Arr:02 Jul 2020
Unload:06 Jul 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
Delaware shelf/
NA06
NA06
 
 
 
39N/74W
39N/74W
 
  Glen Gawarkiewicz
  3/6

Clearances: US EEZ(T)

Ancil Facs: Other Towed Underwater Vehicle
 
Project PI/Institution Project # Days/Agency/Status
Shelfbreak PO TFO Glen Gawarkiewicz/WHOI TBD 6/NAVY-ONR/F
 
Notes: Scan fish testing in-port and underway. dmob scanfish after July 4 weekend. Returned one day early after successful test.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:03 Jul 2020
Dep:03 Jul 2020
Arr:05 Jul 2020
Unload:05 Jul 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: July 4 holiday weekend in home port. dmob ship the following Monday.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Jul 2020
Dep:07 Jul 2020
Arr:10 Jul 2020
Unload:10 Jul 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  4/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Standby Days charged due to COVID cruise cancellations. Full ramp up for operations complete. Days used for upkeep and outfitting and crew time off.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:11 Jul 2020
Dep:11 Jul 2020
Arr:12 Jul 2020
Unload:12 Jul 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Weekend in port.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:13 Jul 2020
Dep:13 Jul 2020
Arr:31 Jul 2020
Unload:31 Jul 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  19/19

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: NOAA cancelled Scallop cruise due to COVID impacts to mission prep (their labs remain closed) and outbreak risk due to the trajectory of the virus as of June 29. No other mission can be scheduled in time (and due to COVID) to fill the gap of lost days in July. Crew will continue outfitting and maintenance and using earned leave.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Aug 2020
Dep:01 Aug 2020
Arr:16 Aug 2020
Unload:16 Aug 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  16/16

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: NOAA cancelled Scallop cruise due to COVID impacts to mission prep (their labs remain closed) and outbreak risk due to the trajectory of the virus as of June 29. No other mission could be scheduled in time (and due to COVID) to fill the gap of lost days in August. Crew will continue outfitting and maintenance and using earned leave.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Aug 2020
Dep:17 Aug 2020
Arr:21 Aug 2020
Unload:21 Aug 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Upkeep and outfitting between cruises.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:22 Aug 2020
Dep:22 Aug 2020
Arr:23 Aug 2020
Unload:23 Aug 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Weekend day(s) in home port

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:24 Aug 2020
Dep:24 Aug 2020
Arr:24 Aug 2020
Unload:24 Aug 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Upkeep and outfitting between cruises.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:25 Aug 2020
Dep:26 Aug 2020
Arr:31 Aug 2020
Unload:01 Sep 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
Chesapeake Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Bess B. Ward
  6/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
N2O production Bess B. Ward/Princeton Not Specified 8/NSF-OCE-CO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Sep 2020
Dep:02 Sep 2020
Arr:30 Sep 2020
Unload:30 Sep 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  29/29

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Standby Days due to COVID cruise cancellations. Used for upkeep and outfitting and crew time off.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Oct 2020
Dep:01 Oct 2020
Arr:02 Oct 2020
Unload:02 Oct 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Upkeep and Outfitting days in port.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:03 Oct 2020
Dep:03 Oct 2020
Arr:04 Oct 2020
Unload:04 Oct 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Weekend in port.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:05 Oct 2020
Dep:05 Oct 2020
Arr:12 Oct 2020
Unload:12 Oct 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  8/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: COVID testing and heightened protocols prior to JO cruise. 10/12 science arrived but wx too bad to set up gear.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:13 Oct 2020
Dep:15 Oct 2020
Arr:23 Oct 2020
Unload:23 Oct 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
Coastal waters/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jeffrey Ouellette
  9/11

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Passive Radar SWH Jeffrey Ouellette/NRL-DC Not Specified 11/NAVY-NRL/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:24 Oct 2020
Dep:24 Oct 2020
Arr:25 Oct 2020
Unload:25 Oct 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Weekend in port between cruises.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:26 Oct 2020
Dep:26 Oct 2020
Arr:30 Oct 2020
Unload:30 Oct 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Upkeep and Outfitting days in port.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:31 Oct 2020
Dep:31 Oct 2020
Arr:01 Nov 2020
Unload:01 Nov 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Weekend in port between cruises.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Nov 2020
Dep:02 Nov 2020
Arr:02 Nov 2020
Unload:02 Nov 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Upkeep and Outfitting day(s) in port.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:03 Nov 2020
Dep:03 Nov 2020
Arr:03 Nov 2020
Unload:03 Nov 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Election Day (UD Holiday). Can sail if needed.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:04 Nov 2020
Dep:04 Nov 2020
Arr:06 Nov 2020
Unload:06 Nov 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Upkeep and Outfitting days in port. COVID testing prior to EPA cruise.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Nov 2020
Dep:07 Nov 2020
Arr:08 Nov 2020
Unload:08 Nov 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Weekend in port. COVID testing and heightened protocols prior to EPA ROV cruise.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Nov 2020
Dep:10 Nov 2020
Arr:18 Nov 2020
Unload:18 Nov 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
NY bight/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
  9/10

Clearances: NONE(T)

Ancil Facs: Other ROV
 
Project PI/Institution Project # Days/Agency/Status
Battelle EPA Jon Swallow/u/del Not Specified 10/OTHER/P
 
Notes: EPA cruise with NOAA ROV. Contract through Battelle. Dmob upon return 1/18.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Nov 2020
Dep:19 Nov 2020
Arr:20 Nov 2020
Unload:20 Nov 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Upkeep and Outfitting day(s) in port.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:21 Nov 2020
Dep:21 Nov 2020
Arr:29 Nov 2020
Unload:29 Nov 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  9/9

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Weekend, 3-day furlough due to Covid budget impacts then Thanksgiving Break

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Nov 2020
Dep:30 Nov 2020
Arr:04 Dec 2020
Unload:04 Dec 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Upkeep and Outfitting day(s) in port.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:05 Dec 2020
Dep:05 Dec 2020
Arr:06 Dec 2020
Unload:06 Dec 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Weekend in port.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Dec 2020
Dep:07 Dec 2020
Arr:08 Dec 2020
Unload:08 Dec 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Inspection
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: ABS inspections. Prep 12/7, inspection 12/8.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Dec 2020
Dep:09 Dec 2020
Arr:11 Dec 2020
Unload:11 Dec 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Upkeep and Outfitting day(s) in port.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:12 Dec 2020
Dep:12 Dec 2020
Arr:13 Dec 2020
Unload:13 Dec 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Weekend in port.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Dec 2020
Dep:14 Dec 2020
Arr:18 Dec 2020
Unload:18 Dec 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
General Upkeep and Outfitting
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Upkeep and Outfitting day(s) in port.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Dec 2020
Dep:19 Dec 2020
Arr:31 Dec 2020
Unload:31 Dec 2020
 
Lewes, DE, USA
Lewes, DE, USA
 
DE Bay/
NA06
NA06
 
 
 
39N/75W
39N/75W
 
  Jon Swallow
Standby Days
  13/13

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: 3-day furlough due to Covid budget impacts then Christmas Break
Agency   Funded   Pending   Total
NAVY   17   0   17
NSF   8   0   8
OTHER   0   10   10
Total  25 10 35
<
Day Type   Total
General Upkeep and Outfitting   116
Inspection   4
Standby Days   146
Overhaul or Repair   65
At Sea for Science   27
Total  358
<
Load/Unload Days   Total
ChargeLoad   6
ChargeUnload   2
Total  8