  2020 - Savannah  
RV Savannah 2020
Final - ID #14240    Version #4 - 1/8/2021

Scheduling Contact(s)
John B. Bichy jbichy*%*%*uga^%^%^edu (912) 667-0855

  Notes:   2020 US Academic Research Fleet vessel schedules are subject to change as the COVID-19 pandemic evolves. Scheduled cruise Chief Scientists are urged to keep in close contact with the vessel operators to remain aware of any updates/changes.
18 Aug: NMFS SEFIS project cancelled due to COVID. Removed 30 days from schedule.
12 June: Taillefert project deferred to last year of project in 2022-23.
11 June 20: Hetland project deferred to 2021 due to COVID impacts.
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jan 2020
Dep:01 Jan 2020
Arr:01 Jan 2020
Unload:01 Jan 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
Standby Days
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: New Years Day Holiday

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Jan 2020
Dep:02 Jan 2020
Arr:03 Jan 2020
Unload:03 Jan 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
General Upkeep and Outfitting
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:04 Jan 2020
Dep:04 Jan 2020
Arr:05 Jan 2020
Unload:05 Jan 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Jan 2020
Dep:06 Jan 2020
Arr:10 Jan 2020
Unload:10 Jan 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
General Upkeep and Outfitting
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:11 Jan 2020
Dep:11 Jan 2020
Arr:12 Jan 2020
Unload:12 Jan 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:13 Jan 2020
Dep:13 Jan 2020
Arr:24 Jan 2020
Unload:24 Jan 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
Available for Service
  12/12

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:25 Jan 2020
Dep:25 Jan 2020
Arr:26 Jan 2020
Unload:26 Jan 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:27 Jan 2020
Dep:27 Jan 2020
Arr:27 Jan 2020
Unload:27 Jan 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
General Upkeep and Outfitting
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:28 Jan 2020
Dep:28 Jan 2020
Arr:28 Jan 2020
Unload:28 Jan 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/80W
31N/80W
 
  Clark Alexander
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
UGA/SKIO Inst Clark Alexander/Skidaway Not Specified 1/INST-UGA-SKIO/F
 
Notes: Institutional Day

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:29 Jan 2020
Dep:29 Jan 2020
Arr:31 Jan 2020
Unload:31 Jan 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
General Upkeep and Outfitting
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Feb 2020
Dep:02 Feb 2020
Arr:09 Feb 2020
Unload:09 Feb 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NC ODMDS/
NA06
NA06
 
 
 
32N/81W
32N/81W
 
  Mel Parsons
  8/9

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
NC ODMDS Survey Mel Parsons/US-EPA R4/LSASD Not Specified 8/EPA/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:10 Feb 2020
Dep:10 Feb 2020
Arr:12 Feb 2020
Unload:12 Feb 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
General Upkeep and Outfitting
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:13 Feb 2020
Dep:13 Feb 2020
Arr:14 Feb 2020
Unload:14 Feb 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/81W
31N/81W
 
  John B. Bichy
Outreach
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: CCGA Student Tours - Takagi

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:15 Feb 2020
Dep:15 Feb 2020
Arr:16 Feb 2020
Unload:16 Feb 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Feb 2020
Dep:17 Feb 2020
Arr:26 Feb 2020
Unload:26 Feb 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
Available for Service
  10/10

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:27 Feb 2020
Dep:27 Feb 2020
Arr:27 Feb 2020
Unload:27 Feb 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
General Upkeep and Outfitting
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:28 Feb 2020
Dep:28 Feb 2020
Arr:28 Feb 2020
Unload:28 Feb 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/80W
31N/80W
 
  Clark Alexander
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
UGA/SKIO Inst Clark Alexander/Skidaway Not Specified 1/INST-UGA-SKIO/F
 
Notes: Education Days - Harper

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:29 Feb 2020
Dep:29 Feb 2020
Arr:01 Mar 2020
Unload:01 Mar 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Mar 2020
Dep:02 Mar 2020
Arr:06 Mar 2020
Unload:06 Mar 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
General Upkeep and Outfitting
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Mar 2020
Dep:07 Mar 2020
Arr:08 Mar 2020
Unload:08 Mar 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Mar 2020
Dep:09 Mar 2020
Arr:11 Mar 2020
Unload:11 Mar 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
Long Bay, NC/
NA06
NA06
 
 
 
34N/79W
33N/79W
 
  Christopher LaClair
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
CORMP Christopher LaClair/UNCW Not Specified 3/NOAA-NWS-NDBC/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:12 Mar 2020
Dep:12 Mar 2020
Arr:13 Mar 2020
Unload:13 Mar 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
General Upkeep and Outfitting
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Mar 2020
Dep:14 Mar 2020
Arr:15 Mar 2020
Unload:15 Mar 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:16 Mar 2020
Dep:16 Mar 2020
Arr:15 Jun 2020
Unload:15 Jun 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
Standby Days
  92/92

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: COVID-19 out of service

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:16 Jun 2020
Dep:16 Jun 2020
Arr:20 Sep 2020
Unload:20 Sep 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
Standby Days
  97/97

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:21 Sep 2020
Dep:21 Sep 2020
Arr:23 Sep 2020
Unload:23 Sep 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
General Upkeep and Outfitting
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:24 Sep 2020
Dep:25 Sep 2020
Arr:25 Sep 2020
Unload:25 Sep 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
SAB Shelf/
NA06
NA06
 
 
 
31N/81W
31N/81W
 
  Marc Frischer
  1/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
DolMICROBE Marc Frischer/Skidaway 2023133 1/NSF-OCE-BIO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:26 Sep 2020
Dep:26 Sep 2020
Arr:27 Sep 2020
Unload:27 Sep 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/80W
31N/80W
 
  Clark Alexander
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
UGA/SKIO Inst Clark Alexander/Skidaway Not Specified 2/INST-UGA-SKIO/F
 
Notes: Education Days

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:28 Sep 2020
Dep:28 Sep 2020
Arr:16 Oct 2020
Unload:16 Oct 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
Available for Service
  19/19

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Oct 2020
Dep:17 Oct 2020
Arr:18 Oct 2020
Unload:18 Oct 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Oct 2020
Dep:19 Oct 2020
Arr:21 Oct 2020
Unload:21 Oct 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
General Upkeep and Outfitting
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:22 Oct 2020
Dep:23 Oct 2020
Arr:19 Nov 2020
Unload:20 Nov 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
Louisiana Shelf/
NA09
NA09
 
 
 
29N/89W
29N/91W
 
  Martial Taillefert
  28/30

Clearances: NONE(T)

Ancil Facs: MC800 multicorer w/ MISO camera/telemetry
 
Project PI/Institution Project # Days/Agency/Status
Alkalinity flux Martial Taillefert/GaTech 1948914 28/NSF-OCE-CO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:21 Nov 2020
Dep:21 Nov 2020
Arr:22 Nov 2020
Unload:22 Nov 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:23 Nov 2020
Dep:23 Nov 2020
Arr:27 Nov 2020
Unload:27 Nov 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
General Upkeep and Outfitting
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:28 Nov 2020
Dep:28 Nov 2020
Arr:29 Nov 2020
Unload:29 Nov 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Nov 2020
Dep:30 Nov 2020
Arr:04 Dec 2020
Unload:04 Dec 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
General Upkeep and Outfitting
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:05 Dec 2020
Dep:05 Dec 2020
Arr:06 Dec 2020
Unload:06 Dec 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
Standby Days
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Dec 2020
Dep:08 Dec 2020
Arr:09 Dec 2020
Unload:09 Dec 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
SAB Shelf/
NA06
NA06
 
 
 
31N/81W
31N/81W
 
  Marc Frischer
  2/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
DolMICROBE Marc Frischer/Skidaway 2023133 2/NSF-OCE-BIO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:10 Dec 2020
Dep:10 Dec 2020
Arr:12 Dec 2020
Unload:13 Dec 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
Ga shelf/
NA06
NA06
 
 
 
32N/81W
32N/81W
 
  Christopher J. Hintz
  3/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
REU 2020-2025 Tara Cox/SavState 1950016 3/NSF-OCE-EDU/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Dec 2020
Dep:14 Dec 2020
Arr:16 Dec 2020
Unload:16 Dec 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
General Upkeep and Outfitting
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Dec 2020
Dep:17 Dec 2020
Arr:18 Dec 2020
Unload:18 Dec 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 2/NSF-OCE/F
 
Notes: Crew Performance Crusie

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Dec 2020
Dep:19 Dec 2020
Arr:31 Dec 2020
Unload:31 Dec 2020
 
Savannah, GA, USA
Savannah, GA, USA
 
NA6/
NA06
NA06
 
 
 
31N/82W
31N/82W
 
  John B. Bichy
Standby Days
  13/13

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Agency   Funded   Pending   Total
EPA   8   0   8
INST   4   0   4
NOAA   3   0   3
NSF   36   0   36
Total  51 0 51
<
Day Type   Total
Available for Service   41
General Upkeep and Outfitting   41
Standby Days   225
At Sea for Science   51
Outreach   2
Total  360
<
Load/Unload Days   Total
ChargeLoad   4
ChargeUnload   2
Total  6