  2020 - Atlantic Explorer  
2020 SCHEDULE REV 15 JANUARY 8, 2020
Secure - ID #13772    Version #14 - 1/8/2020

Scheduling Contact(s)
Quentin M. Lewis marine^%^%^superintendent*%*%*bios^%^%^edu (646) 547-1788x208

  Notes:   1/8/2020 - Add 1 additional Grundle day back on to January BATS cruise, per NSF PM
1/6/2020 - Move 1 Grundle day from 2002 BATS cruise to 2001 Hydro cruise, to recover malfunctioning glider 110NM southwest of Bermuda (Cruise departs 1645 Jan 6 and returns 1700 January 8 - 2-day cruise). Correct number of mob/de-mob days for Hydro cruises to 8 days total (not 16). Move shipyard period to November to better suit science schedule. Move 2002 BATS cruise later in January.
11/14/19 - Move BATS and HYDRO days to better accommodate science schedule, NOTE: 1 BATS day transferred from 2019 to 2020, due to weather.
11/11/19 - Girguis has not gone to panel , so not shown scheduled; added shipyard period 1/25 - 2/15 to install new deck winches at BAE Systems, Jacksonville, Florida;.EUROFLEET cruise dates are PLACEHOLDERS ONLY
7/23/19 - Girguis STR NOPP-NSF, not yet reviewed
7/23/19 - Monismith withdrawn (6 days removed), Wang - STR requests ship days, but ONR PM states ancillary cruise only - no funded ship days (7 days removed)
5/21/19 - Removed Clayson cruise (withdrawn), added in February BATS/HYDRO/GRUNDLE cruise (funded), added 6 Monismith days (pending)
2/12/19: If Clayson cruise is funded, R/V ENDEAVOR would be requested to fill in for February 6-day BATS cruise (4 BATS, 1 HYDRO, 1 GRUNDLE, plus 1 BATS mob day and 1 BATS de-mob day)
2/11/19: Clayson cruise - Bermuda to Bermuda. 10 days transit to NA9, vs. 15 days to/from Miami. 1 day port call in Barbados (Feb 19)
2/11/19: Added Girguis, including 7 days transit (Bermuda to Charleston, Wilmington to Bermuda)
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jan 2020
Dep:01 Jan 2020
Arr:05 Jan 2020
Unload:05 Jan 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA6/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Jan 2020
Dep:06 Jan 2020
Arr:08 Jan 2020
Unload:08 Jan 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
NCP-Glider Damian Grundle/BIOS 1851224 1/NSF-OCE-CO/F
Hydrostation S Nicholas R. Bates/BIOS 1633125 1/NSF-OCE-PO/F
 
Notes: AE 2001 - HYDRO/GRUNDLE CRUISE. Depart at 1645 Jan 6, and return at 1700 Jan 8: 2-day cruise.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Jan 2020
Dep:09 Jan 2020
Arr:18 Jan 2020
Unload:18 Jan 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  10/10

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Jan 2020
Dep:20 Jan 2020
Arr:25 Jan 2020
Unload:26 Jan 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  6/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
BATS Nicholas R. Bates/BIOS 1756105 4/NSF-OCE-CO/F
Hydrostation S Nicholas R. Bates/BIOS 1633125 3/NSF-OCE-PO/F
NCP-Glider Damian Grundle/BIOS 1851224 1/NSF-OCE-CO/F
 
Notes: AE 2002 - BATS/HYDRO/GRUNDLE CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:27 Jan 2020
Dep:27 Jan 2020
Arr:02 Feb 2020
Unload:02 Feb 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  7/7

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:03 Feb 2020
Dep:03 Feb 2020
Arr:03 Feb 2020
Unload:03 Feb 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Hydrostation S Nicholas R. Bates/BIOS 1633125 1/NSF-OCE-PO/F
 
Notes: AE 2003 - HYDRO CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:04 Feb 2020
Dep:04 Feb 2020
Arr:09 Feb 2020
Unload:09 Feb 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA6/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  6/6

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:10 Feb 2020
Dep:10 Feb 2020
Arr:14 Feb 2020
Unload:14 Feb 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
Out of Service
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: ABS ANNUAL SURVEYS - DOCKSIDE, BERMUDA

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:15 Feb 2020
Dep:15 Feb 2020
Arr:24 Feb 2020
Unload:24 Feb 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA6/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  10/10

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:25 Feb 2020
Dep:26 Feb 2020
Arr:01 Mar 2020
Unload:02 Mar 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  5/7

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
BATS Nicholas R. Bates/BIOS 1756105 6/NSF-OCE-CO/F
Hydrostation S Nicholas R. Bates/BIOS 1633125 1/NSF-OCE-PO/F
 
Notes: AE 2004 - BATS/HYDRO CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:03 Mar 2020
Dep:03 Mar 2020
Arr:12 Mar 2020
Unload:12 Mar 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
Available for Service
  10/10

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: AVAILABLE FOR SERVICE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:13 Mar 2020
Dep:14 Mar 2020
Arr:20 Mar 2020
Unload:21 Mar 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  7/9

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
BATS Nicholas R. Bates/BIOS 1756105 6/NSF-OCE-CO/F
BAITS Peter Sedwick/ODU_OEAS 1829833 1/NSF-OCE-CO/F
NCP-Glider Damian Grundle/BIOS 1851224 1/NSF-OCE-CO/F
Hydrostation S Nicholas R. Bates/BIOS 1633125 1/NSF-OCE-PO/F
 
Notes: AE 2005 - BATS/HYDRO/SEDWICK/GRUNDLE CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:22 Mar 2020
Dep:22 Mar 2020
Arr:02 Apr 2020
Unload:02 Apr 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
Available for Service
  12/12

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: AVAILABLE FOR SERVICE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:03 Apr 2020
Dep:03 Apr 2020
Arr:05 Apr 2020
Unload:05 Apr 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
BATS Nicholas R. Bates/BIOS 1756105 2/NSF-OCE-CO/F
Hydrostation S Nicholas R. Bates/BIOS 1633125 1/NSF-OCE-PO/F
 
Notes: AE 2006 - BATS/HYDRO BLOOM CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Apr 2020
Dep:06 Apr 2020
Arr:06 Apr 2020
Unload:06 Apr 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Apr 2020
Dep:08 Apr 2020
Arr:13 Apr 2020
Unload:14 Apr 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA6/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Steven Wilhelm
  6/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Who infects who Steven Wilhelm/UTK 1829641 8/NSF-OCE-BIO/F
 
Notes: AE 2007 - WILHELM CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:15 Apr 2020
Dep:15 Apr 2020
Arr:19 Apr 2020
Unload:19 Apr 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 Apr 2020
Dep:21 Apr 2020
Arr:26 Apr 2020
Unload:27 Apr 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  6/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
BATS Nicholas R. Bates/BIOS 1756105 6/NSF-OCE-CO/F
NCP-Glider Damian Grundle/BIOS 1851224 1/NSF-OCE-CO/F
Hydrostation S Nicholas R. Bates/BIOS 1633125 1/NSF-OCE-PO/F
 
Notes: AE 2008 - BATS/HYDRO/GRUNDLE CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:28 Apr 2020
Dep:28 Apr 2020
Arr:28 Apr 2020
Unload:28 Apr 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:29 Apr 2020
Dep:01 May 2020
Arr:06 May 2020
Unload:07 May 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Maureen H. Conte
  6/9

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Oceanic Flux Program Maureen H. Conte/BIOS 1829885 9/NSF-OCE-CO/F
 
Notes: AE 2009 - CONTE OFP CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:08 May 2020
Dep:08 May 2020
Arr:08 May 2020
Unload:08 May 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 May 2020
Dep:10 May 2020
Arr:12 May 2020
Unload:13 May 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  3/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Hydrostation S Nicholas R. Bates/BIOS 1633125 3/NSF-OCE-PO/F
BATS Nicholas R. Bates/BIOS 1756105 2/NSF-OCE-CO/F
 
Notes: AE 2010 - BATS/HYDRO BLOOM CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 May 2020
Dep:14 May 2020
Arr:17 May 2020
Unload:17 May 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  4/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:18 May 2020
Dep:19 May 2020
Arr:24 May 2020
Unload:25 May 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  6/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
BATS Nicholas R. Bates/BIOS 1756105 5/NSF-OCE-CO/F
Hydrostation S Nicholas R. Bates/BIOS 1633125 2/NSF-OCE-PO/F
NCP-Glider Damian Grundle/BIOS 1851224 1/NSF-OCE-CO/F
 
Notes: AE 2011 - BATS/HYDRO/GRUNDLE CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:26 May 2020
Dep:26 May 2020
Arr:31 May 2020
Unload:31 May 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  6/6

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jun 2020
Dep:01 Jun 2020
Arr:01 Jun 2020
Unload:02 Jun 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  1/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Hydrostation S Nicholas R. Bates/BIOS 1633125 2/NSF-OCE-PO/F
 
Notes: AE 2012 - HYDRO CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:03 Jun 2020
Dep:03 Jun 2020
Arr:06 Jun 2020
Unload:06 Jun 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  4/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Jun 2020
Dep:08 Jun 2020
Arr:12 Jun 2020
Unload:13 Jun 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA6/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Aodhan Fitzgerald
  5/7

Clearances: NONE(T)

Ancil Facs: General Purpose Lab Van, Radioisotope Lab Van
 
Project PI/Institution Project # Days/Agency/Status
EF+ Aodhan Fitzgerald/EF+ Not Specified 7/INST-BIOS/T
 
Notes: AE 2013 - EUROFLEET CRUISE (dates are placeholder only)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Jun 2020
Dep:14 Jun 2020
Arr:14 Jun 2020
Unload:14 Jun 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:15 Jun 2020
Dep:16 Jun 2020
Arr:21 Jun 2020
Unload:22 Jun 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  6/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
BATS Nicholas R. Bates/BIOS 1756105 6/NSF-OCE-CO/F
NCP-Glider Damian Grundle/BIOS 1851224 1/NSF-OCE-CO/F
Hydrostation S Nicholas R. Bates/BIOS 1633125 1/NSF-OCE-PO/F
 
Notes: AE 2014 - BATS/HYDRO/GRUNDLE CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:23 Jun 2020
Dep:23 Jun 2020
Arr:28 Jun 2020
Unload:28 Jun 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  6/6

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:29 Jun 2020
Dep:29 Jun 2020
Arr:30 Jun 2020
Unload:30 Jun 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Hydrostation S Nicholas R. Bates/BIOS 1633125 2/NSF-OCE-PO/F
 
Notes: AE 2015 - HYDRO CRUISE (2-DAY)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jul 2020
Dep:01 Jul 2020
Arr:06 Jul 2020
Unload:06 Jul 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  6/6

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Jul 2020
Dep:08 Jul 2020
Arr:11 Jul 2020
Unload:12 Jul 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/65W
32N/65W
 
  Craig A. Carlson
  4/6

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 6/INST-BIOS/F
BIOS-SCOPE Craig A. Carlson/UCSB SFI409923 0/OTHER/F
 
Notes: AE 2016 - BIOS SCOPE CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:13 Jul 2020
Dep:13 Jul 2020
Arr:13 Jul 2020
Unload:13 Jul 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Jul 2020
Dep:15 Jul 2020
Arr:20 Jul 2020
Unload:21 Jul 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  6/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
BATS Nicholas R. Bates/BIOS 1756105 6/NSF-OCE-CO/F
NCP-Glider Damian Grundle/BIOS 1851224 1/NSF-OCE-CO/F
Hydrostation S Nicholas R. Bates/BIOS 1633125 1/NSF-OCE-PO/F
 
Notes: AE 2017 - BATS/HYDRO/GRUNDLE CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:22 Jul 2020
Dep:22 Jul 2020
Arr:28 Jul 2020
Unload:28 Jul 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA6/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  7/7

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:29 Jul 2020
Dep:29 Jul 2020
Arr:29 Jul 2020
Unload:29 Jul 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Hydrostation S Nicholas R. Bates/BIOS 1633125 1/NSF-OCE-PO/F
 
Notes: AE 2018 - HYDRO CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Jul 2020
Dep:30 Jul 2020
Arr:09 Aug 2020
Unload:09 Aug 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
Available for Service
  11/11

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: AVAILABLE FOR SERVICE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:10 Aug 2020
Dep:11 Aug 2020
Arr:16 Aug 2020
Unload:17 Aug 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  6/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
BATS Nicholas R. Bates/BIOS 1756105 6/NSF-OCE-CO/F
NCP-Glider Damian Grundle/BIOS 1851224 1/NSF-OCE-CO/F
Hydrostation S Nicholas R. Bates/BIOS 1633125 1/NSF-OCE-PO/F
 
Notes: AE 2019 - BATS/HYDRO/GRUNDLE CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:18 Aug 2020
Dep:18 Aug 2020
Arr:25 Aug 2020
Unload:25 Aug 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
Available for Service
  8/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: AVAILABLE FOR SERVICE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:26 Aug 2020
Dep:26 Aug 2020
Arr:26 Aug 2020
Unload:26 Aug 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Hydrostation S Nicholas R. Bates/BIOS 1633125 1/NSF-OCE-PO/F
 
Notes: AE 2020 - HYDRO CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:27 Aug 2020
Dep:27 Aug 2020
Arr:03 Sep 2020
Unload:03 Sep 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
Available for Service
  8/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: AVAILABLE FOR SERVICE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:04 Sep 2020
Dep:05 Sep 2020
Arr:10 Sep 2020
Unload:11 Sep 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  6/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
BATS Nicholas R. Bates/BIOS 1756105 6/NSF-OCE-CO/F
NCP-Glider Damian Grundle/BIOS 1851224 1/NSF-OCE-CO/F
Hydrostation S Nicholas R. Bates/BIOS 1633125 1/NSF-OCE-PO/F
 
Notes: AE 2021 - BATS/HYDRO/GRUNDLE CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:12 Sep 2020
Dep:12 Sep 2020
Arr:14 Sep 2020
Unload:14 Sep 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA6/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:15 Sep 2020
Dep:15 Sep 2020
Arr:16 Sep 2020
Unload:16 Sep 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Hydrostation S Nicholas R. Bates/BIOS 1633125 2/NSF-OCE-PO/F
 
Notes: AE 2022 - HYDRO-OXFORD UNIVERSITY CRUISE (2-DAY)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Sep 2020
Dep:17 Sep 2020
Arr:17 Sep 2020
Unload:17 Sep 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:18 Sep 2020
Dep:19 Sep 2020
Arr:03 Oct 2020
Unload:04 Oct 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  15/17

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
BATS Nicholas R. Bates/BIOS 1756105 15/NSF-OCE-CO/F
Hydrostation S Nicholas R. Bates/BIOS 1633125 2/NSF-OCE-PO/F
 
Notes: AE 2023 - BATS VALIDATION CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:05 Oct 2020
Dep:05 Oct 2020
Arr:07 Oct 2020
Unload:07 Oct 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:08 Oct 2020
Dep:10 Oct 2020
Arr:15 Oct 2020
Unload:16 Oct 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Maureen H. Conte
  6/9

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Oceanic Flux Program Maureen H. Conte/BIOS 1829885 9/NSF-OCE-CO/F
 
Notes: AE 2024 - CONTE OFP CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Oct 2020
Dep:17 Oct 2020
Arr:18 Oct 2020
Unload:18 Oct 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Oct 2020
Dep:20 Oct 2020
Arr:25 Oct 2020
Unload:26 Oct 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  6/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
BATS Nicholas R. Bates/BIOS 1756105 6/NSF-OCE-CO/F
NCP-Glider Damian Grundle/BIOS 1851224 1/NSF-OCE-CO/F
Hydrostation S Nicholas R. Bates/BIOS 1633125 1/NSF-OCE-PO/F
 
Notes: AE 2025 - BATS/HYDRO/GRUNDLE CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:27 Oct 2020
Dep:27 Oct 2020
Arr:28 Oct 2020
Unload:28 Oct 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:29 Oct 2020
Dep:29 Oct 2020
Arr:01 Nov 2020
Unload:01 Nov 2020
 
St. George's, Bermuda
Jacksonville, FL, USA
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
30N/80W
 
  Quentin M. Lewis
Transit Cruise
  4/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: AE 2026 - Transit to Shipyard (BAE Systems, Jacksonville, Florida)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Nov 2020
Dep:02 Nov 2020
Arr:18 Nov 2020
Unload:18 Nov 2020
 
Jacksonville, FL, USA
Jacksonville, FL, USA
 
Bermuda/
NA06
NA06
 
 
 
30N/80W
30N/80W
 
  Quentin M. Lewis
Overhaul or Repair
  17/17

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: In-water shipyard repair period - BAE Systems; Jacksonville, Florida

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Nov 2020
Dep:19 Nov 2020
Arr:22 Nov 2020
Unload:22 Nov 2020
 
Jacksonville, FL, USA
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
30N/80W
32N/64W
 
  Quentin M. Lewis
Transit Cruise
  4/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: AE 2027 - Transit to Bermuda

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:23 Nov 2020
Dep:24 Nov 2020
Arr:28 Nov 2020
Unload:29 Nov 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  5/7

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
BATS Nicholas R. Bates/BIOS 1756105 5/NSF-OCE-CO/F
Hydrostation S Nicholas R. Bates/BIOS 1633125 2/NSF-OCE-PO/F
 
Notes: AE 2028 - BATS/HYDRO CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Nov 2020
Dep:30 Nov 2020
Arr:09 Dec 2020
Unload:09 Dec 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
Available for Service
  10/10

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: AVAILABLE FOR SERVICE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:10 Dec 2020
Dep:11 Dec 2020
Arr:15 Dec 2020
Unload:15 Dec 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  5/6

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
BATS Nicholas R. Bates/BIOS 1756105 4/NSF-OCE-CO/F
Hydrostation S Nicholas R. Bates/BIOS 1633125 2/NSF-OCE-PO/F
 
Notes: AE 2029 - BATS/HYDRO CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:16 Dec 2020
Dep:16 Dec 2020
Arr:19 Dec 2020
Unload:19 Dec 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  4/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 Dec 2020
Dep:20 Dec 2020
Arr:20 Dec 2020
Unload:20 Dec 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
NA06/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Rod Johnson
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Hydrostation S Nicholas R. Bates/BIOS 1633125 1/NSF-OCE-PO/F
 
Notes: AE 2030 - HYDRO CRUISE

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:21 Dec 2020
Dep:21 Dec 2020
Arr:31 Dec 2020
Unload:31 Dec 2020
 
St. George's, Bermuda
St. George's, Bermuda
 
Bermuda/
NA06
NA06
 
 
 
32N/64W
32N/64W
 
  Quentin M. Lewis
General Upkeep and Outfitting
  11/11

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting - END OF YEAR

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:TBD
Dep:TBD
Arr:TBD
Unload:TBD
 
St. George's, Bermuda
Charleston, SC, USA
 
NA6/
NA06
NA06
 
 
 
32N/64W
30N/78W
 
  Peter R. Girguis
  4/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Autonomous observing Peter R. Girguis/Harvard Not Specified 4/NOPP/T
 
Notes: AE 20XX - GIRGUIS/TRANSIT TO CHARLESTON

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:TBD
Dep:TBD
Arr:TBD
Unload:TBD
 
Charleston, SC, USA
Wilmington, NC, USA
 
NA6/
NA06
NA06
 
 
 
32N/78W
33N/77W
 
  Peter R. Girguis
  14/16

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Autonomous observing Peter R. Girguis/Harvard Not Specified 16/NOPP/T
 
Notes: AE 20XX - GIRGUIS CRUISE (NOPP_NSF)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:TBD
Dep:TBD
Arr:TBD
Unload:TBD
 
Wilmington, NC, USA
St. George's, Bermuda
 
NA6/
NA06
NA06
 
 
 
32N/64W
30N/78W
 
  Peter R. Girguis
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Autonomous observing Peter R. Girguis/Harvard Not Specified 3/NOPP/T
 
Notes: AE 20XX - GIRGUIS/TRANSIT TO BERMUDA
Agency   Funded   Pending   Total
INST   6   7   13
NOPP   0   23   23
NSF   156   0   156
OTHER   0   0   0
Total  162 30 192
<
Day Type   Total
Available for Service   59
Transit Cruise   8
General Upkeep and Outfitting   107
Overhaul or Repair   17
At Sea for Science   150
Out of Service   5
Total  346
<
Load/Unload Days   Total
ChargeLoad   22
ChargeUnload   20
Total  42