  2012 - Atlantis  
Atlantis 2012 Final
Final - ID #11597    Version #5 - 3/7/2018

Scheduling Contact(s)
Kerry Strom kstrom*%*%*whoi^%^%^edu (508) 289-3938

  Notes:   Jan 15 Made Final.
11/5: Scheduled Transit to shipyard Nov 5 - 8 and dry dock period Nov 8 - Dec 31 2012.
8/15: Changed Armstrong Departure to Aug 15 and arrival Sept 10. Still 27 op days.
8/10/12: Added NAVY INSURV inspection Oct 22 - 26, Woods Hole Ma.
7/25/12: Removed "Hickey" Alvin Eng Sea Trial. Added 7 days to Forbes / Armstrong cruise. Changed Dep. to Aug 14 and arrival port to Woods Hole Sept 9.
7/9/12: Added 2 days onto this transit for NOAA Dart buoy service on buoy #41424 @ 32.922N, 72.466W . New ETA Aug 9 into WHOI.
6/19/12: Added NOAA/Canada joint collaboration cruise Aug 11 - 31, plus 8 day transit from Barbados to WHOI. Total of 29 days added. Boston still being used as a place holder until a shipyard is chosen for A Frame Modification in September.
6/11/12: May 28 Sea Trial for Traction / Markey winch. Used 1 mob day from Van Dover (NSF/OCE/BIO). Van Dover cruise end 1 day early June 17. D. Smith begin 1 day early June 21.
2/3/12: Removed German Alvin Sci Verification cruise. Shifted Hickey to Dec 1.
Added Debbie Smith cruise June 22 - * 20 days total . Shifted Yager to July 12 sailing. Shifted Swift mid cruise port stop to April 17 - 19 in Barbados.
12/21/11: a} Added 2 days to Feb transit to WHOI for multibeam training (Konsburg). b} Added Yager cruise June 23 - July 9. c} Boston added as port place holder for A Frame work. d} Shifted A Frame modifications to July 19 - Sep 16. e} Added Oct 1 dock trails. f} Shifted Hickey / Alvin Engineering sea trials to Nov 1.
10/27/11: Transit days from Barbados to US east coast port (7) now NON OP days (per nsf). Added maintenance periods (2) at WHOI.
10/20/11: Added 1 transit day Jan 1st & Shifted German, NSF inspection and transit PE to WHOI 3 days later.
10/17/11: Recalculated Van Dover sea days. Cruise ends June 18.
10/11/11: Updated transit dates from WHOI to Barbados. Added 1 Jason engineering dive day to Van Dover cruise. Added one mob day for Van Dover. Adjusted Transit dates Bridgetown to JAX June 21 - June 27. Added 1 demob day for Hickey.
10/4/11: Added two day NSF inspection schedule Jan 27 - 28 2012. Port Everglades to Port Everglades.
10/3/11: Published AT 2012 schedule.
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:12 Dec 2011
Dep:12 Dec 2011
Arr:01 Jan 2012
Unload:01 Jan 2012
 
Piraievs, Greece
Port Everglades, FL, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
  21/21
 
Project PI/Institution Project # Days/Agency/Status
Transit Not Specified 1/NSF-OCE-MGG/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Jan 2012
Dep:06 Jan 2012
Arr:28 Jan 2012
Unload:29 Jan 2012
 
Port Everglades, FL, USA
Port Everglades, FL, USA
 
Cayman Trench/
NA09
NA09
 
 
 
15N/85W
15N/85W
 
  Christopher German
  23/28

Clearances: United Kingdom(A)
 
Project PI/Institution Project # Days/Agency/Status
Jason Cayman Vents Christopher German/WHOI 1061863 27/NSF-OCE-MGG/F
Jason Engineering Dv Andrew D. Bowen/WHOI Not Specified 1/NSF-OCE-IPS/F
ROV JASON Not Specified 0/OTHER/P
 
Notes: 9/28/11: added 1 engineering dive day (from 2011 Johnson cruise) and added 1 extra transit day by changing mob / demob port. (Port Everglades).

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Jan 2012
Dep:30 Jan 2012
Arr:31 Jan 2012
Unload:31 Jan 2012
 
Port Everglades, FL, USA
Port Everglades, FL, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
  2/2
 
Project PI/Institution Project # Days/Agency/Status
NSF/JMS inspection Not Specified 0/NSF-OCE-IPS/F
 
Notes: Jan 30 Monday, Jan 31 Tuesday NSF inspection in Port Everglades Fl.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Feb 2012
Dep:01 Feb 2012
Arr:07 Feb 2012
Unload:07 Feb 2012
 
Port Everglades, FL, USA
Woods Hole, MA, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
Transit
  7/7
 
Project PI/Institution Project # Days/Agency/Status
Transit + EM122 trng Not Specified 7/NSF-OCE-IPS/F
 
Notes: 12/5/11: Added two transit days for EM122 (multibeam) Konsburg training. 9/28/11: PE to WHOI 1042nm = 3.9/4 + 1 = 5 day transit KW to WHOI=1192 = 5d + 1 = 6 day transit. Ship up Jason for off load & vsl. maintenance

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:08 Feb 2012
Dep:08 Feb 2012
Arr:18 Feb 2012
Unload:18 Feb 2012
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
./
NA06
NA06
 
 
 
41N/71W
41N/71W
 
  None /transit
Maintenance
  11/11

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 0/OTHER/P

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Feb 2012
Dep:22 Feb 2012
Arr:17 Mar 2012
Unload:18 Mar 2012
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
Off N.Carolina/
NA06
NA06
 
 
 
35N/75W
35N/75W
 
  Jody Klymak
  25/29
 
Project PI/Institution Project # Days/Agency/Status
LATMIX2012 Craig M. Lee/UW_APL N00014-09-1-0266 25/NAVY-ONR-OAS/F
 
Notes: 8/31: Made this WHOI to WHOI. Have to add 2 days transit to station and 2 days transit back to WHOI (4 total) = 25 op days.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:18 Mar 2012
Dep:18 Mar 2012
Arr:23 Mar 2012
Unload:23 Mar 2012
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
Maintenance
  6/6
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 Mar 2012
Dep:24 Mar 2012
Arr:17 Apr 2012
Unload:18 Apr 2012
 
Woods Hole, MA, USA
Bridgetown, Barbados
 
North Atlantic/
NA06
NA09
 
 
 
45N/55W
15N/55W
 
  Ruth Curry
  25/30

Clearances: Bermuda(A), Dominican Republic(A), France(A), Netherlands(A), Suriname(A)
 
Project PI/Institution Project # Days/Agency/Status
CO2/ReptHydro-A20/22 James Swift/SIO 1153145 26/NSF-OCE-PO/F
 
Notes: Added Bridgetown Barbados as mid cruise port stop and new dates April 17 - 19.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Apr 2012
Dep:19 Apr 2012
Arr:15 May 2012
Unload:17 May 2012
 
Bridgetown, Barbados
Woods Hole, MA, USA
 
North Atlantic/
NA06
NA09
 
 
 
45N/55W
15N/55W
 
  Michael McCartney
  27/29

Clearances: Bermuda(A), Dominican Republic(A), France(A), Netherlands(A), Suriname(A)
 
Project PI/Institution Project # Days/Agency/Status
CO2/ReptHydro-A20/22 James Swift/SIO 1153145 27/NSF-OCE-PO/F
 
Notes: Bridgetown Barbados selected as better mid cruise port call location. April 17 - 19. can not transit through Venezuelan EEZ (200nm). Must go around which will add 1 day extra transit to station #1 off Suriname. 1,340nm = 5 day transit. 12/21/11: Aruba port call 4/13 - 4/15.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:16 May 2012
Dep:16 May 2012
Arr:19 May 2012
Unload:19 May 2012
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
Maintenance
  4/4
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 May 2012
Dep:20 May 2012
Arr:28 May 2012
Unload:28 May 2012
 
Woods Hole, MA, USA
Bridgetown, Barbados
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
  9/9
 
Project PI/Institution Project # Days/Agency/Status
Transit Not Specified 9/NSF-OCE-BIO/F
 
Notes: Added 1 transit day (9 total) for sea trial 5/28 to test Markey Traction Winch. 1831nm @11kt=6.9/7day + 1 = 8 day transit down.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:29 May 2012
Dep:01 Jun 2012
Arr:17 Jun 2012
Unload:19 Jun 2012
 
Bridgetown, Barbados
Bridgetown, Barbados
 
North Atlantic/
NA09
NA09
 
 
 
15N/65W
15N/65W
 
  Cindy L. Van Dover
  17/22

Clearances: Barbados(A), Trinidad and Tobago(D)
 
Project PI/Institution Project # Days/Agency/Status
Seep Connectivity Cindy L. Van Dover/DUML 1031050 21/NSF-OCE-BIO/F
Jason Engineering Dv Andrew D. Bowen/WHOI Not Specified 1/NSF-OCE-IPS/F
ROV JASON Not Specified 0/OTHER/P
 
Notes: 6/11: End Van Dover 1 day early and put 1 day onto Smith cruise to recover 3 moorings inside Trinidad Tobago. Cindy Van Dover's cruise dates are as firm as possible due to Jason shipping constraints. 10/7/11: Added 1 engineering dive day for Jason

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 Jun 2012
Dep:21 Jun 2012
Arr:09 Jul 2012
Unload:10 Jul 2012
 
Bridgetown, Barbados
Bridgetown, Barbados
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
  Deborah Smith
  19/21
 
Project PI/Institution Project # Days/Agency/Status
Equatorial MAR Deborah Smith/NSF 1062165 20/NSF-EAR/F
Van Dover moorings Not Specified 1/NSF-OCE-BIO/F
 
Notes: 6/11: Smith cruise to depart 1 day early for recovery of Van Dover moorings (3) inside Trinidad Tobago EEZ. Recovery unsuccessful. Will try in 2013.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:11 Jul 2012
Dep:13 Jul 2012
Arr:29 Jul 2012
Unload:30 Jul 2012
 
Bridgetown, Barbados
Bridgetown, Barbados
 
coast of Brazil/
NA09
NA09
 
 
 
13N/60W
13N/60W
 
  Patricia L. Yager
  17/20

Clearances: Brazil(A), France(A), Barbados(A)
 
Project PI/Institution Project # Days/Agency/Status
ANACONDAS Patricia L. Yager/Georgia 0934095 20/NSF-OCE-BIO/F
ANACONDAS Patricia L. Yager/Georgia Not Specified 0/NSF-BIO/F
 
Notes: This cruise is off the coast of Barbados, Brazil and French Guiana.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:31 Jul 2012
Dep:31 Jul 2012
Arr:09 Aug 2012
Unload:09 Aug 2012
 
Bridgetown, Barbados
Woods Hole, MA, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
  10/10
 
Project PI/Institution Project # Days/Agency/Status
Transit Not Specified 8/NOAA/F
NOAA DART BUOY svc Not Specified 2/NOAA-NWS-NDBC/F
 
Notes: 7/9/12: Added 2 days onto this transit for NOAA Dart buoy service on buoy #41424 @ 32.922N, 72.466W . New ETA Aug 9 into WHOI. 1884 @ 11kt = 7.1/7 day + 1 = 8 day transit funded by following NOAA / Canada Hydro cruise (NOAA).

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:15 Aug 2012
Dep:15 Aug 2012
Arr:10 Sep 2012
Unload:10 Sep 2012
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
Cont. Shelf Brk/
NA06
NA06
 
 
 
45N/65W
35N/65W
 
 
  27/27

Clearances: Canada(A)
 
Project PI/Institution Project # Days/Agency/Status
NOAACanada Hydrogphc Andrew Armstrong/NOAA JHC Not Specified 27/NOAA/F
 
Notes: Research Clearance handled by Canada Hydrographic Service - Approved.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:22 Oct 2012
Dep:22 Oct 2012
Arr:26 Oct 2012
Unload:26 Oct 2012
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
Navy INSURV
  5/5
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:05 Nov 2012
Dep:05 Nov 2012
Arr:08 Nov 2012
Unload:08 Nov 2012
 
Woods Hole, MA, USA
Charleston, SC, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
  4/4
 
Project PI/Institution Project # Days/Agency/Status
Transit to Shipyard Not Specified 0/OTHER/NonOp
 
Notes: Deytens Shipyard is Atlantis dry dock location Nov 8 - mid Jan 2013.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:08 Nov 2012
Dep:08 Nov 2012
Arr:31 Dec 2012
Unload:31 Dec 2012
 
Charleston, SC, USA
Charleston, SC, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
 
Shipyard
  54/54
 
Project PI/Institution Project # Days/Agency/Status
Agency   Funded   Pending   Total
NAVY   25   0   25
NOAA   37   0   37
NSF   161   0   161
OTHER   0   0   0
Total  223 0 223
<
<