Ship Time Request System
Search Public Records
Funded Projects
Funded Requests
Published Schedules
Search Funded Projects/Requests
All Ports
All Ancillary Facilities
UNOLS Equipment Inventory
All Ships
Help
Suggestions/Request Help
Frequently Asked Questions
Log In
View Schedule
or
schedule as:
Expanded (Text)
Condensed (Text)
Expanded (PDF)
Send schedule email to:
*
One or more invalid email addresses
Note for recipient(s):
the schedule as:
Excel XML
CSV
Google Earth Map (KML)
ICal Calendar
2012
-
Atlantis
Atlantis 2012 Final
Final
- ID #
11597
Version #
5
-
3/7/2018
Scheduling Contact(s)
Kerry Strom
kstrom*%*%*whoi^%^%^edu
(508) 289-3938
Notes:
Jan 15 Made Final.
11/5: Scheduled Transit to shipyard Nov 5 - 8 and dry dock period Nov 8 - Dec 31 2012.
8/15: Changed Armstrong Departure to Aug 15 and arrival Sept 10. Still 27 op days.
8/10/12: Added NAVY INSURV inspection Oct 22 - 26, Woods Hole Ma.
7/25/12: Removed "Hickey" Alvin Eng Sea Trial. Added 7 days to Forbes / Armstrong cruise. Changed Dep. to Aug 14 and arrival port to Woods Hole Sept 9.
7/9/12: Added 2 days onto this transit for NOAA Dart buoy service on buoy #41424 @ 32.922N, 72.466W . New ETA Aug 9 into WHOI.
6/19/12: Added NOAA/Canada joint collaboration cruise Aug 11 - 31, plus 8 day transit from Barbados to WHOI. Total of 29 days added. Boston still being used as a place holder until a shipyard is chosen for A Frame Modification in September.
6/11/12: May 28 Sea Trial for Traction / Markey winch. Used 1 mob day from Van Dover (NSF/OCE/BIO). Van Dover cruise end 1 day early June 17. D. Smith begin 1 day early June 21.
2/3/12: Removed German Alvin Sci Verification cruise. Shifted Hickey to Dec 1.
Added Debbie Smith cruise June 22 - * 20 days total . Shifted Yager to July 12 sailing. Shifted Swift mid cruise port stop to April 17 - 19 in Barbados.
12/21/11: a} Added 2 days to Feb transit to WHOI for multibeam training (Konsburg). b} Added Yager cruise June 23 - July 9. c} Boston added as port place holder for A Frame work. d} Shifted A Frame modifications to July 19 - Sep 16. e} Added Oct 1 dock trails. f} Shifted Hickey / Alvin Engineering sea trials to Nov 1.
10/27/11: Transit days from Barbados to US east coast port (7) now NON OP days (per nsf). Added maintenance periods (2) at WHOI.
10/20/11: Added 1 transit day Jan 1st & Shifted German, NSF inspection and transit PE to WHOI 3 days later.
10/17/11: Recalculated Van Dover sea days. Cruise ends June 18.
10/11/11: Updated transit dates from WHOI to Barbados. Added 1 Jason engineering dive day to Van Dover cruise. Added one mob day for Van Dover. Adjusted Transit dates Bridgetown to JAX June 21 - June 27. Added 1 demob day for Hickey.
10/4/11: Added two day NSF inspection schedule Jan 27 - 28 2012. Port Everglades to Port Everglades.
10/3/11: Published AT 2012 schedule.
View Summary
Set Default
Associated Cruises
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
12 Dec 2011
Dep:
12 Dec 2011
Arr:
01 Jan 2012
Unload:
01 Jan 2012
Piraievs, Greece
Port Everglades, FL, USA
/
0N/0E
0N/0E
21/21
Project
PI/Institution
Project #
Days/Agency/Status
Transit
Not Specified
1/NSF-OCE-MGG/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
02 Jan 2012
Dep:
06 Jan 2012
Arr:
28 Jan 2012
Unload:
29 Jan 2012
Port Everglades, FL, USA
Port Everglades, FL, USA
Cayman Trench/
NA09
NA09
15N/85W
15N/85W
Christopher German
23/28
Clearances:
United Kingdom(A)
Project
PI/Institution
Project #
Days/Agency/Status
Jason Cayman Vents
Christopher German
/
WHOI
1061863
27/NSF-OCE-MGG/F
Jason Engineering Dv
Andrew D. Bowen
/
WHOI
Not Specified
1/NSF-OCE-IPS/F
ROV JASON
Not Specified
0/OTHER/P
Notes:
9/28/11: added 1 engineering dive day (from 2011 Johnson cruise) and added 1 extra transit day by changing mob / demob port. (Port Everglades).
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
30 Jan 2012
Dep:
30 Jan 2012
Arr:
31 Jan 2012
Unload:
31 Jan 2012
Port Everglades, FL, USA
Port Everglades, FL, USA
/
0N/0E
0N/0E
2/2
Project
PI/Institution
Project #
Days/Agency/Status
NSF/JMS inspection
Not Specified
0/NSF-OCE-IPS/F
Notes:
Jan 30 Monday, Jan 31 Tuesday NSF inspection in Port Everglades Fl.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
01 Feb 2012
Dep:
01 Feb 2012
Arr:
07 Feb 2012
Unload:
07 Feb 2012
Port Everglades, FL, USA
Woods Hole, MA, USA
/
0N/0E
0N/0E
Transit
7/7
Project
PI/Institution
Project #
Days/Agency/Status
Transit + EM122 trng
Not Specified
7/NSF-OCE-IPS/F
Notes:
12/5/11: Added two transit days for EM122 (multibeam) Konsburg training. 9/28/11: PE to WHOI 1042nm = 3.9/4 + 1 = 5 day transit KW to WHOI=1192 = 5d + 1 = 6 day transit. Ship up Jason for off load & vsl. maintenance
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
08 Feb 2012
Dep:
08 Feb 2012
Arr:
18 Feb 2012
Unload:
18 Feb 2012
Woods Hole, MA, USA
Woods Hole, MA, USA
./
NA06
NA06
41N/71W
41N/71W
None /transit
Maintenance
11/11
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Not Specified
0/OTHER/P
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
19 Feb 2012
Dep:
22 Feb 2012
Arr:
17 Mar 2012
Unload:
18 Mar 2012
Woods Hole, MA, USA
Woods Hole, MA, USA
Off N.Carolina/
NA06
NA06
35N/75W
35N/75W
Jody Klymak
25/29
Project
PI/Institution
Project #
Days/Agency/Status
LATMIX2012
Craig M. Lee
/
UW_APL
N00014-09-1-0266
25/NAVY-ONR-OAS/F
Notes:
8/31: Made this WHOI to WHOI. Have to add 2 days transit to station and 2 days transit back to WHOI (4 total) = 25 op days.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
18 Mar 2012
Dep:
18 Mar 2012
Arr:
23 Mar 2012
Unload:
23 Mar 2012
Woods Hole, MA, USA
Woods Hole, MA, USA
/
0N/0E
0N/0E
Maintenance
6/6
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
20 Mar 2012
Dep:
24 Mar 2012
Arr:
17 Apr 2012
Unload:
18 Apr 2012
Woods Hole, MA, USA
Bridgetown, Barbados
North Atlantic/
NA06
NA09
45N/55W
15N/55W
Ruth Curry
25/30
Clearances:
Bermuda(A), Dominican Republic(A), France(A), Netherlands(A), Suriname(A)
Project
PI/Institution
Project #
Days/Agency/Status
CO2/ReptHydro-A20/22
James Swift
/
SIO
1153145
26/NSF-OCE-PO/F
Notes:
Added Bridgetown Barbados as mid cruise port stop and new dates April 17 - 19.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
19 Apr 2012
Dep:
19 Apr 2012
Arr:
15 May 2012
Unload:
17 May 2012
Bridgetown, Barbados
Woods Hole, MA, USA
North Atlantic/
NA06
NA09
45N/55W
15N/55W
Michael McCartney
27/29
Clearances:
Bermuda(A), Dominican Republic(A), France(A), Netherlands(A), Suriname(A)
Project
PI/Institution
Project #
Days/Agency/Status
CO2/ReptHydro-A20/22
James Swift
/
SIO
1153145
27/NSF-OCE-PO/F
Notes:
Bridgetown Barbados selected as better mid cruise port call location. April 17 - 19. can not transit through Venezuelan EEZ (200nm). Must go around which will add 1 day extra transit to station #1 off Suriname. 1,340nm = 5 day transit. 12/21/11: Aruba port call 4/13 - 4/15.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
16 May 2012
Dep:
16 May 2012
Arr:
19 May 2012
Unload:
19 May 2012
Woods Hole, MA, USA
Woods Hole, MA, USA
/
0N/0E
0N/0E
Maintenance
4/4
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
20 May 2012
Dep:
20 May 2012
Arr:
28 May 2012
Unload:
28 May 2012
Woods Hole, MA, USA
Bridgetown, Barbados
/
0N/0E
0N/0E
9/9
Project
PI/Institution
Project #
Days/Agency/Status
Transit
Not Specified
9/NSF-OCE-BIO/F
Notes:
Added 1 transit day (9 total) for sea trial 5/28 to test Markey Traction Winch. 1831nm @11kt=6.9/7day + 1 = 8 day transit down.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
29 May 2012
Dep:
01 Jun 2012
Arr:
17 Jun 2012
Unload:
19 Jun 2012
Bridgetown, Barbados
Bridgetown, Barbados
North Atlantic/
NA09
NA09
15N/65W
15N/65W
Cindy L. Van Dover
17/22
Clearances:
Barbados(A), Trinidad and Tobago(D)
Project
PI/Institution
Project #
Days/Agency/Status
Seep Connectivity
Cindy L. Van Dover
/
DUML
1031050
21/NSF-OCE-BIO/F
Jason Engineering Dv
Andrew D. Bowen
/
WHOI
Not Specified
1/NSF-OCE-IPS/F
ROV JASON
Not Specified
0/OTHER/P
Notes:
6/11: End Van Dover 1 day early and put 1 day onto Smith cruise to recover 3 moorings inside Trinidad Tobago. Cindy Van Dover's cruise dates are as firm as possible due to Jason shipping constraints. 10/7/11: Added 1 engineering dive day for Jason
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
20 Jun 2012
Dep:
21 Jun 2012
Arr:
09 Jul 2012
Unload:
10 Jul 2012
Bridgetown, Barbados
Bridgetown, Barbados
/
0N/0E
0N/0E
Deborah Smith
19/21
Project
PI/Institution
Project #
Days/Agency/Status
Equatorial MAR
Deborah Smith
/
NSF
1062165
20/NSF-EAR/F
Van Dover moorings
Not Specified
1/NSF-OCE-BIO/F
Notes:
6/11: Smith cruise to depart 1 day early for recovery of Van Dover moorings (3) inside Trinidad Tobago EEZ. Recovery unsuccessful. Will try in 2013.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
11 Jul 2012
Dep:
13 Jul 2012
Arr:
29 Jul 2012
Unload:
30 Jul 2012
Bridgetown, Barbados
Bridgetown, Barbados
coast of Brazil/
NA09
NA09
13N/60W
13N/60W
Patricia L. Yager
17/20
Clearances:
Brazil(A), France(A), Barbados(A)
Project
PI/Institution
Project #
Days/Agency/Status
ANACONDAS
Patricia L. Yager
/
Georgia
0934095
20/NSF-OCE-BIO/F
ANACONDAS
Patricia L. Yager
/
Georgia
Not Specified
0/NSF-BIO/F
Notes:
This cruise is off the coast of Barbados, Brazil and French Guiana.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
31 Jul 2012
Dep:
31 Jul 2012
Arr:
09 Aug 2012
Unload:
09 Aug 2012
Bridgetown, Barbados
Woods Hole, MA, USA
/
0N/0E
0N/0E
10/10
Project
PI/Institution
Project #
Days/Agency/Status
Transit
Not Specified
8/NOAA/F
NOAA DART BUOY svc
Not Specified
2/NOAA-NWS-NDBC/F
Notes:
7/9/12: Added 2 days onto this transit for NOAA Dart buoy service on buoy #41424 @ 32.922N, 72.466W . New ETA Aug 9 into WHOI. 1884 @ 11kt = 7.1/7 day + 1 = 8 day transit funded by following NOAA / Canada Hydro cruise (NOAA).
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
15 Aug 2012
Dep:
15 Aug 2012
Arr:
10 Sep 2012
Unload:
10 Sep 2012
Woods Hole, MA, USA
Woods Hole, MA, USA
Cont. Shelf Brk/
NA06
NA06
45N/65W
35N/65W
27/27
Clearances:
Canada(A)
Project
PI/Institution
Project #
Days/Agency/Status
NOAACanada Hydrogphc
Andrew Armstrong
/
NOAA JHC
Not Specified
27/NOAA/F
Notes:
Research Clearance handled by Canada Hydrographic Service - Approved.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
22 Oct 2012
Dep:
22 Oct 2012
Arr:
26 Oct 2012
Unload:
26 Oct 2012
Woods Hole, MA, USA
Woods Hole, MA, USA
/
0N/0E
0N/0E
Navy INSURV
5/5
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
05 Nov 2012
Dep:
05 Nov 2012
Arr:
08 Nov 2012
Unload:
08 Nov 2012
Woods Hole, MA, USA
Charleston, SC, USA
/
0N/0E
0N/0E
4/4
Project
PI/Institution
Project #
Days/Agency/Status
Transit to Shipyard
Not Specified
0/OTHER/NonOp
Notes:
Deytens Shipyard is Atlantis dry dock location Nov 8 - mid Jan 2013.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
08 Nov 2012
Dep:
08 Nov 2012
Arr:
31 Dec 2012
Unload:
31 Dec 2012
Charleston, SC, USA
Charleston, SC, USA
/
0N/0E
0N/0E
Shipyard
54/54
Project
PI/Institution
Project #
Days/Agency/Status
Agency
Funded
Pending
Total
NAVY
25
0
25
NOAA
37
0
37
NSF
161
0
161
OTHER
0
0
0
Total
223
0
223
<
<