View Schedule

or schedule as:
the schedule as:
  2015 - Atlantis  
Final 2015 Sched (ver 10)
Final - ID #12660    Version #3 - 1/7/2016

Scheduling Contact(s)
Kerry Strom kstrom*%*%*whoi^%^%^edu (508) 289-3938

  Notes:   1/7/16: Published final schedule

12/2: Moved final departure for Charleston SC to Dec 6. New ETA Charleston Sc Dec 10.
11/17: OOI leg C (Oct 27 - Nov1) added 1 day onto leg.
9/9: Shifted OOI Pioneer fall cruise dates. Oct 11 - Oct 31st, 3 legs, still 20 days total.
5/14: Added OOI Pioneer port call May 2nd.
4/27: Adjusted A.Plueddemann OOI Pioneer mid cruise port call to May 4 - May 6 (1 day earlier). Op days remain the same.
4/1/15: Changed Uwe Send OOI arrival date to March 25.
3/12:(1) Reduced April OOI Pioneer cruise by 4 days. And made only 2 legs A & B. Departure will be April 28. (2) Updated Weller 55S cruise arrival date to March 4th.
2/3/15: Adjusted early arrival for Mulholland 1/22, 2 demobe days 1/23, 1/24.
11/3: (1) Added 4 days to each OOI Pioneer April spring and October fall cruises and separated into short voyages for mid cruise port stops. (2) moved the maintenance period to May 15, 22 days. (3) Shifted JMS inspection to June 5 - 6. (4) Moved Reddy and Van Dover start dates after to June 15 and July 8. Rest of year schedule shifted to the right to end on Dec 1.
10/17: Published 2015 schedule
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 Dec 2014
Dep:20 Dec 2014
Arr:28 Dec 2014
Unload:28 Dec 2014
 
Puntarenas, Costa Rica
Rada de Arica, Chile
 
transit/
NP13
SP03A
 
 
 
10N/85W
18S/70W
 
  None /transit
Transit
  9/9

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 0/NSF-OCE-BIO/F
 
Notes: 2003nm Puntarenas to Arica = 9day

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:29 Dec 2014
Dep:31 Dec 2014
Arr:22 Jan 2015
Unload:24 Jan 2015
 
Rada de Arica, Chile
Rada de Arica, Chile
 
ETSP/
SP03A
SP06A
 
 
 
13S/85W
30S/70W
 
  Margaret R. Mulholland
  23/27

Clearances: Peru(A)
 
Project PI/Institution Project # Days/Agency/Status
ETP N2 fixation Margaret R. Mulholland/ODU_OEAS 1356056 24/NSF-OCE-BIO/F
NON ALVIN Margaret R. Mulholland/ODU_OEAS Not Specified 0/OTHER/P
 
Notes: Peru clearance wasn't granted until 1/12. (late) ALVIN NOT USED

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:25 Jan 2015
Dep:25 Jan 2015
Arr:29 Jan 2015
Unload:29 Jan 2015
 
Rada de Arica, Chile
Rada de Arica, Chile
 
20S,73W/
SP03A
SP03A
 
 
 
20S/73W
20S/73W
 
  W. Bruce Strickrott
  5/5

Clearances: NONE(T)

Ancil Facs: Alvin
 
Project PI/Institution Project # Days/Agency/Status
ALVIN 4500m Cert dve Not Specified 5/NSF-OCE-IPS/F
 
Notes: US NAVSEA 4500 meter certification dives

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Jan 2015
Dep:30 Jan 2015
Arr:08 Feb 2015
Unload:08 Feb 2015
 
Rada de Arica, Chile
Rada Punta Arenas, Chile
 
Transit/
SP03A
SP09A
 
 
 
18S/70W
53S/70W
 
  None /transit
  10/10

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
transit to OOI Not Specified 10/NSF-OOI-OOI/F
 
Notes: 2285nm Arica to PA = 10 day

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Feb 2015
Dep:12 Feb 2015
Arr:04 Mar 2015
Unload:06 Mar 2015
 
Rada Punta Arenas, Chile
Rada Punta Arenas, Chile
 
55South/
NA04A
NA04A
 
 
 
55N/90W
55N/90W
 
  Weller OOI Project Team
  21/26

Clearances: Chile(A)
 
Project PI/Institution Project # Days/Agency/Status
OOI 55 South Paul Matthias/WHOI Not Specified 26/NSF-OOI-OOI/F
NON ALVIN CRUISE Weller OOI Project Team/WHOI Not Specified 0/OTHER/F
 
Notes: 1/8/14: NOTE that this cruise may be swapped with the OOI Argentine Basin deployment depending on weather in Dec 14' Jan 15'.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Mar 2015
Dep:08 Mar 2015
Arr:25 Mar 2015
Unload:27 Mar 2015
 
Rada Punta Arenas, Chile
Montevideo, Uruguay
 
Argentine Basin/
SA03
SA03
 
 
 
42S/42W
42S/42W
 
  Uwe Send
  18/21

Clearances: Chile(A), Argentina(A), United Kingdom(A)
 
Project PI/Institution Project # Days/Agency/Status
OOI Argentine Basin Weller OOI Project Team/WHOI OOI MREFC 21/NSF-OOI-OOI/F
NON ALVIN CRUISE Uwe Send/SIO Not Specified 0/OTHER/F
 
Notes: Rada PA to OOI mooring Argentine Basin = 1,350nm = 6 days. OO mooring site to Montevideo = 791nm = 4 days

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:28 Mar 2015
Dep:28 Mar 2015
Arr:19 Apr 2015
Unload:19 Apr 2015
 
Montevideo, Uruguay
Woods Hole, MA, USA
 
Transit/
SP09A
SA03A
 
 
 
50S/70W
34S/56W
 
  None /transit
Transit
  23/23

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 13/NSF-OCE-IPS/F
Not Specified 10/NSF-OOI-OOI/F
 
Notes: Monte to WHOI = 5750nm = 23 d

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 Apr 2015
Dep:20 Apr 2015
Arr:27 Apr 2015
Unload:27 Apr 2015
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
 /
NA06
NA06
 
 
 
42N/71W
42N/71W
 
 
Maintenance
  8/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 0/INST-WHOI/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:26 Apr 2015
Dep:28 Apr 2015
Arr:02 May 2015
Unload:02 May 2015
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
Pioneer Aray/
NA06
NA06
 
 
 
39N/69W
41N/71W
 
  Al Plueddemann
  5/7

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI Pioneer Al Plueddemann/WHOI Not Specified 5/NSF-OOI-OOI/F
 
Notes: Atlantis arrived and departed May 2nd to clear tangled line from thruster.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:03 May 2015
Dep:03 May 2015
Arr:04 May 2015
Unload:04 May 2015
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
Pioneer Aray/
NA06
NA06
 
 
 
39N/69W
41N/71W
 
  Al Plueddemann
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI Pioneer Al Plueddemann/WHOI Not Specified 2/NSF-OOI-OOI/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:05 May 2015
Dep:06 May 2015
Arr:14 May 2015
Unload:15 May 2015
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
Pioneer Aray/
NA06
NA06
 
 
 
39N/69W
41N/71W
 
  Al Plueddemann
  9/11

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI Pioneer Al Plueddemann/WHOI Not Specified 9/NSF-OOI-OOI/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:16 May 2015
Dep:16 May 2015
Arr:05 Jun 2015
Unload:05 Jun 2015
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
 /
NA06
NA06
 
 
 
42N/71W
42N/71W
 
 
Maintenance
  21/21

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:03 Jun 2015
Dep:03 Jun 2015
Arr:05 Jun 2015
Unload:05 Jun 2015
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
Vineyard Sound/
NA06
NA06
 
 
 
42N/71W
42N/71W
 
  Peter Lemmond
NSF Inspec
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
JMS Inspection Not Specified 3/NSF-OCE-IPS/NonOp
 
Notes: 11/13: JMS Confirms dates for inspection 6/3 - 6/5. Preload Reddy and Sentry prior to 6/3.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Jun 2015
Dep:06 Jun 2015
Arr:12 Jun 2015
Unload:12 Jun 2015
 
Woods Hole, MA, USA
St. Petersburg, FL, USA
 
Transit/
NA06
NA09
 
 
 
42N/71W
28N/82W
 
  None /transit
Transit
  7/7

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 7/NSF-OCE-CO/F
 
Notes: 1500 = 7day

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:13 Jun 2015
Dep:15 Jun 2015
Arr:29 Jun 2015
Unload:30 Jun 2015
 
St. Petersburg, FL, USA
St. Petersburg, FL, USA
 
GOM/
NA09
NA09
 
 
 
26N/91W
26N/91W
 
  David L. Valentine
  15/18

Clearances: NONE(T)

Ancil Facs: Sentry, Alvin
 
Project PI/Institution Project # Days/Agency/Status
Oxyhydrocarbons Christopher Reddy/WHOI 1333148 17/NSF-OCE-CO/F
ALVIN ENG DIVE Not Specified 1/NAVY-ONR/F
ALVIN & SENTRY Not Specified 0/OTHER/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jul 2015
Dep:01 Jul 2015
Arr:05 Jul 2015
Unload:05 Jul 2015
 
St. Petersburg, FL, USA
Morehead City, NC, USA
 
Transit/
NA09
NA06
 
 
 
28N/82W
35N/77W
 
  None /transit
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Transit Not Specified 5/NSF-OCE-BIO/F
 
Notes: BBds to Mobile = 1965nm = 8 days Bds to MHC = 1,597nm =7days Bds to WH =1,804nm = 8days KEEP SENTRY ON BOARD. Off load at WHOI after arrival

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Jul 2015
Dep:08 Jul 2015
Arr:28 Jul 2015
Unload:30 Jul 2015
 
Morehead City, NC, USA
Woods Hole, MA, USA
 
Atlantic Seeps/
NA06
NA06
 
 
 
35N/77W
42N/71W
 
  Cindy L. Van Dover
  21/25

Clearances: NONE(T)

Ancil Facs: Sentry, Alvin
 
Project PI/Institution Project # Days/Agency/Status
SeepC REVISED 12/12 Cindy L. Van Dover/DUML OCE-1031050 22/NSF-OCE-BIO/F
ALVIN ENG DIVE Not Specified 1/NSF-OCE-IPS/F
HOV ALVIN & SENTRY Not Specified 0/OTHER/F
DOPS on Sentry Carl Kaiser/WHOI Not Specified 0/NSF-OCE-OTIC/P
 
Notes: 9/17: Put Kaiser 3 days for net sampler into OCE-BIO. OTIC did not fund this. 9 sci / dive days = 3 ACK, 2 VA, 3 BR 6 transit days 7/9/14: Cindy asking for 3 more sci days for Sentry net testing. PENDING but I put them in for place holder.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:03 Aug 2015
Dep:03 Aug 2015
Arr:03 Aug 2015
Unload:03 Aug 2015
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
WHOI/
NA06
NA06
 
 
 
42N/71W
42N/71W
 
  W. Bruce Strickrott
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
NAVSEA SHIP AUDIT Not Specified 1/NAVY/NonOp
 
Notes: This is day 1 of a 5 day ALVIN and LARS NAVSEA Functional Audit. THIS SHOULD NOT EFFECT LOADING OOI and C. LEE. August 3rd will be on Atlantis. Aug 2 - 5 will be shore side with ALOPS and Alvin in the highbay.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Aug 2015
Dep:05 Aug 2015
Arr:01 Sep 2015
Unload:02 Sep 2015
 
Woods Hole, MA, USA
Nuuk (Godthab), Greenland
 
IrmingerSea/
NA01
NA01
 
 
 
60N/39W
60N/39W
 
  Weller OOI Project Team
  28/32

Clearances: Greenland(A)
 
Project PI/Institution Project # Days/Agency/Status
OOI Irminger Sea Weller OOI Project Team/WHOI Not Specified 29/NSF-OOI-OOI/F
NON ALVIN CRUISE Weller OOI Project Team/WHOI Not Specified 0/OTHER/P
 
Notes: 1900nm up to OOI station = 8 days 565 nm from OOI station to Nuuk = 3 days 11 transit days total

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:03 Sep 2015
Dep:06 Sep 2015
Arr:25 Sep 2015
Unload:26 Sep 2015
 
Nuuk (Godthab), Greenland
Nuuk (Godthab), Greenland
 
Davis Straits/
AR11
AR09
 
 
 
61N/68W
72N/51W
 
  Craig M. Lee
  20/24

Clearances: Canada(A), Greenland(A)
 
Project PI/Institution Project # Days/Agency/Status
AON Davis Strait Craig M. Lee/UW_APL arc 1022472 24/NSF-OPP-ARC/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:27 Sep 2015
Dep:27 Sep 2015
Arr:04 Oct 2015
Unload:04 Oct 2015
 
Nuuk (Godthab), Greenland
Woods Hole, MA, USA
 
Transit/
AR11
NA06
 
 
 
64N/62W
42N/71W
 
  None /transit
Transit
  8/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 4/NSF-OPP-ARC/F
Not Specified 4/NSF-OOI-OOI/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Oct 2015
Dep:11 Oct 2015
Arr:18 Oct 2015
Unload:18 Oct 2015
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
Pioneer Aray/
NA06
NA06
 
 
 
39N/69W
41N/71W
 
  Al Plueddemann
  8/10

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI Pioneer Al Plueddemann/WHOI Not Specified 8/NSF-OOI-OOI/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Oct 2015
Dep:19 Oct 2015
Arr:25 Oct 2015
Unload:25 Oct 2015
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
Pioneer Aray/
NA06
NA06
 
 
 
39N/69W
41N/71W
 
  Al Plueddemann
  7/7

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI Pioneer Al Plueddemann/WHOI Not Specified 7/NSF-OOI-OOI/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:26 Oct 2015
Dep:27 Oct 2015
Arr:01 Nov 2015
Unload:02 Nov 2015
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
Pioneer Aray/
NA06
NA06
 
 
 
39N/69W
41N/71W
 
  Al Plueddemann
  6/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI Pioneer Al Plueddemann/WHOI Not Specified 6/NSF-OOI-OOI/F
 
Notes: Added 1 day onto final leg due to weather.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:05 Nov 2015
Dep:06 Nov 2015
Arr:01 Dec 2015
Unload:02 Dec 2015
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
North Atlantic/
NA06
NA06
 
 
 
41N/71W
42N/71W
 
  Michael Behrenfeld
  26/28

Clearances: Canada(A)
 
Project PI/Institution Project # Days/Agency/Status
NAAMES Michael J. Behrenfeld/OSU_Oregon State Not Specified 26/NASA/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Dec 2015
Dep:06 Dec 2015
Arr:10 Dec 2015
Unload:10 Dec 2015
 
Woods Hole, MA, USA
Charleston, SC, USA
 
Transit/
NA06
NA06
 
 
 
40N/71W
33N/80W
 
  None /transit
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Transit to shipyard Not Specified 5/OTHER/NonOp

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:11 Dec 2015
Dep:11 Dec 2015
Arr:05 Feb 2016
Unload:05 Feb 2016
 
Charleston, SC, USA
Charleston, SC, USA
 
drydock/
SA02
SA02
 
 
 
0N/0E
0N/0E
 
  None /transit
Shipyard
  57/57

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Detyens Shipyard Charleston SC
Agency   Funded   Pending   Total
INST   0   0   0
NASA   26   0   26
NAVY   1   0   1
NSF   122   0   122
NSF-OOI   137   0   137
OTHER   0   0   0
Total  286 0 286
<
<