OOI 55 South
-
2015
-
Global
|
|
|
Project Title: |
OOI CGSN Global Site at 55 S, 90 W |
Project Status: |
Submitted |
Principal Investigator: |
Paul Matthias, WHOI |
Project Institution: |
WHOI |
Project ID: |
101766 |
Version #: |
10 |
Date Submitted: |
10/1/2008 3:04:00 PM |
Created By: |
Paul Matthias |
Date Last Modified: |
3/7/2018 10:41:00 AM |
URI Serial #: |
None |
Funding Agencies: |
NSF-OOI/OOI - NONE - Funded |
Summary of Field Work: |
Establish global site at 55S, 90W. CGSN of OOI will deploy surface mooring, dual profiler mooring, two flanking subsurface moorings, and three gliders. |
Summary of Facility Requirements: |
Global class, rigged for mooring operations, Sea Beam desired, 7000 lb crane, dynamic positioning, 10000 lb A-frame, 100,000 deck load, trawl winch with 9000 m 9/16 inch wire, 30 berths, 30 day endurance, experience with mooring operations. |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1002455 |
Created By: |
Paul Matthias |
Date Last Modified: |
3/7/2018 10:40:00 AM |
Date Submitted: |
10/1/2008 3:04:00 PM |
|
Year: |
2015
|
Ship/Facility: |
Global
|
Optimum Start Date:
|
2/10/2015 |
Dates to Avoid: |
Seek window of days of climatological lowest winds and waves; avoid other days due to risk of failing to deploy moorings or unsafe working. |
|
|
|
|
Earliest Start Date: |
1/1/2015 |
Multi-Ship Op: |
No |
Latest Start Date: |
3/15/2015 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
13 |
3 |
2 |
6 |
24 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
|
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
|
|
Short Description of Op Area
for use in schedules: |
55S 90W |
Description of Op Area: |
55S 90W, west of southern Chile |
Op Area Size/Dia.: |
100 nm |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
|
|
|
Ending
|
|
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Rada Punta Arenas, Chile |
None |
Rada Punta Arenas, Chile |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Ports to be confirmed with NSF and Ship operator |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Paul Matthias, WHOI |
# in Science Party |
11 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
Chief Scientist, mooring techs, glider techs, sampling tech, instrumentation/systems/engineers |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
Trawl in case of need to drag for moorings.
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
Global class, rigged for mooring operations, Sea Beam desired, 7000 lb crane, dynamic positioning, 10000 lb A-frame, 100,000 deck load, trawl winch with 9000 m 9/16 inch wire, 30 berths, 30 day endurance, experience with mooring operations. |
|