Ship Time Request System
Search Public Records
Funded Projects
Funded Requests
Published Schedules
Search Funded Projects/Requests
All Ports
All Ancillary Facilities
UNOLS Equipment Inventory
All Ships
Help
Suggestions/Request Help
Frequently Asked Questions
Log In
View Schedule
or
schedule as:
Expanded (Text)
Condensed (Text)
Expanded (PDF)
Send schedule email to:
*
One or more invalid email addresses
Note for recipient(s):
the schedule as:
Excel XML
CSV
Google Earth Map (KML)
ICal Calendar
2013
-
Atlantis
VERSION 10_Nov 27
Final
- ID #
12089
Version #
3
-
1/6/2014
Scheduling Contact(s)
Kerry Strom
kstrom*%*%*whoi^%^%^edu
(508) 289-3938
Notes:
1/6/13: Final 2013 Sched.
11/27: Hickey Part II arrived Nov 19. No change in # op days.
10/25: Extended HICKEY Alvin Cert Trials Pt. II, 7 days to Nov 21. Changed Transit to CR to Nov 24 - Dec 3. G.WHEAT cruise changed to Dec 7 - Dec 23.
10/2: Extended HIckey Part II cruise (HOV Cert trials) to Nov 14. Girguis will be postponed until 2014. Changed Sievert NDSF vehicle to ROV JASON. Removed Alvin engineering dive from Sievert cruise.
7/17: (1) Added 1 day to Sept HICKEY cruise. (2) Moved Valentine 1 day to the right. (3) Filled time between VALENTINE and GIRGUIS with more HICKEY / ALVIN CERT TRIALS II. (4) Move Wheat back to Nov 30 so that demob can occur on Dec 24 crane ops.
7/15: Updated Toomey cruise end date July 8.
6/21: Shifted Alvin SVC Girguis cruise later to Oct 30 - Nov 14. Shifted Jason/Sentry mob day to Nov 17. Shifted transit to Costa Rica to Nov 18 - 27. Shift Wheat cruise to Dec 1 - 24 and Stefan Sievert cruise to Dec 29 - Jan 28 with NEW END PORT of Balboa Panama.
5/6: 1) Added 4 day Hydro Winch cruise May 3 -6 (2) Changed ETD WHOI to May 25 for transit direct to Astoria (27 days). (3) Differed Tim Crone, Kang Ding, Maurice Tivey, Norm Farr, cruise to 2014. (4) Added Jason Eng Dive to Johnson cruise (5) Shifted HICKEY Alvin Cert cruise to 8/31 - 9/16. (6) Valentine Shifts to Sept 25 - Oct 16 (7) Griguis moved to Oct 21 - Nov 5. (8) Wheat and Sievert shifted 2 weeks later (9) Added 3 days onto WHEAT cruise
2/27: Shifted P.Hickey cruise (Cert Trials) to May 1 - 25. Cancelled P.Girguis cruise (SVC Alvin). New transit Bermuda to Astoria May 28 - June 20. Operational days decrease to 244 (-30).
2/8/13: Girguis cruise, added mid cruise stop ONE day only MAY 19.
1/29/13: Added 1 Sentry Engineering dive day on Geoff Wheat cruise. Shifted Sievert one day to the right - Start Dec 1.
1/23/13: Confirmed transit dates from Charleston SC to WHOI. Jan 24 - 27.
11/8/12: Published 2013 Atlantis schedule Version #1.
View Summary
Set Default
Associated Cruises
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
01 Jan 2013
Dep:
01 Jan 2013
Arr:
20 Jan 2013
Unload:
20 Jan 2013
Charleston, SC, USA
Charleston, SC, USA
/
0N/0E
0N/0E
20/20
Project
PI/Institution
Project #
Days/Agency/Status
Dry Dock
Not Specified
20/OTHER/NonOp
Notes:
End date Jan 20 as place holder ONLY. End of Ship Yard "tbd". Will update in December with float date and departure date.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
24 Jan 2013
Dep:
24 Jan 2013
Arr:
27 Jan 2013
Unload:
27 Jan 2013
Charleston, SC, USA
Woods Hole, MA, USA
/
0N/0E
0N/0E
4/4
Project
PI/Institution
Project #
Days/Agency/Status
Transit
Not Specified
2/NSF-OCE-IPS/F
Not Specified
2/NAVY-ONR/F
Notes:
4 day transit from Charleston SC to WHOI
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
28 Jan 2013
Dep:
28 Jan 2013
Arr:
22 May 2013
Unload:
22 May 2013
Woods Hole, MA, USA
Woods Hole, MA, USA
/
0N/0E
0N/0E
115/115
Project
PI/Institution
Project #
Days/Agency/Status
ALVIN UPGRADE
Not Specified
115/OTHER/NonOp
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
03 May 2013
Dep:
03 May 2013
Arr:
06 May 2013
Unload:
06 May 2013
Woods Hole, MA, USA
Woods Hole, MA, USA
/
0N/0E
0N/0E
4/4
Project
PI/Institution
Project #
Days/Agency/Status
Hydro Winch Testing
Not Specified
2/NSF-OCE-IPS/F
Hydro Winch Testing
Not Specified
2/NAVY-ONR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
25 May 2013
Dep:
25 May 2013
Arr:
17 Jun 2013
Unload:
20 Jun 2013
Woods Hole, MA, USA
Astoria, OR, USA
/
0N/0E
0N/0E
Transit
24/27
Project
PI/Institution
Project #
Days/Agency/Status
Transit
Not Specified
26/NSF-OCE-MGG/F
Not Specified
1/NAVY-ONR/F
Notes:
WHOI to Cristiobal = 2026 = 9 days Panama Canal = 1 day Balboa to Astoria = 3853nm = 16 days 26 day total transit
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
21 Jun 2013
Dep:
25 Jun 2013
Arr:
08 Jul 2013
Unload:
10 Jul 2013
Astoria, OR, USA
Astoria, OR, USA
/
0N/0E
0N/0E
14/20
Ancil Facs:
Jason
Project
PI/Institution
Project #
Days/Agency/Status
Cascadia Initiative
Douglas R. Toomey
/
Oregon
1139701
20/NSF-OCE-MGG/F
ROV JASON
Not Specified
0/OTHER/P
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
11 Jul 2013
Dep:
13 Jul 2013
Arr:
26 Jul 2013
Unload:
28 Jul 2013
Astoria, OR, USA
Astoria, OR, USA
/
0N/0E
0N/0E
14/18
Clearances:
Canada(A)
Ancil Facs:
Jason
Project
PI/Institution
Project #
Days/Agency/Status
JFR flank hydrogeo
Andrew T. Fisher
/
UCSC
1031808
18/NSF-OCE-ODP/F
ROV JASON
Not Specified
0/OTHER/F
Notes:
2013 carry over cruise from Thompson. Will use URI INNER SPACE CENTER Telepresence
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
29 Jul 2013
Dep:
31 Jul 2013
Arr:
26 Aug 2013
Unload:
28 Aug 2013
Astoria, OR, USA
Astoria, OR, USA
NP9/
NP09
NP09
39N/130W
39N/130W
Harlan P. Johnson
27/31
Ancil Facs:
OSU Coring Facility (MARSSAM), Jason
Project
PI/Institution
Project #
Days/Agency/Status
Cascadia Heat Flow
Harlan P. Johnson
/
UW
1144164
30/NSF-OCE-MGG/F
Jason Eng Dive
Not Specified
1/NSF-OCE-IPS/F
ROV JASON
Not Specified
0/OTHER/P
Notes:
San Fran to station = 3 days transit + 1 to transit into Astoria
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
29 Aug 2013
Dep:
31 Aug 2013
Arr:
20 Sep 2013
Unload:
21 Sep 2013
Astoria, OR, USA
San Francisco, CA, USA
/
0N/0E
0N/0E
21/24
Ancil Facs:
Alvin
Project
PI/Institution
Project #
Days/Agency/Status
HOV Sea Trials
Patrick Hickey
/
WHOI
Not Specified
23/NSF-OCE-IPS/F
ALVIN CERT TRIALS I
Not Specified
1/NAVY-ONR/F
Notes:
6/21: Atlantis will transit directly to S.F. dock to begin Alvin incline test and harbor trials. Those plans are still tbd. Once those are completed Atlantis will move out to sea for the remainder barring anything from NAVSEA or Alvin. 9/22: Will continue cert trials Oct 21 in San Diego. 4/17/13: HICKEY cruise = Alvin Cert dives w/ NAVSEA. Astoria to S.Fran harbor = 564nm = 3 days 613nm Astoria to Mont Bay = 2 days 80 nm to San Fran = 8 hrs * Differed Crone, Ding, Tivey, Farr, Kinsey (Sentry & Alvin time) to 2014. Monterrey Bay op area. ** NEED to be in San Francisco to Mob Valentine no later than 9/30.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
22 Sep 2013
Dep:
26 Sep 2013
Arr:
17 Oct 2013
Unload:
19 Oct 2013
San Francisco, CA, USA
San Diego, CA, USA
/
0N/0E
0N/0E
22/28
Ancil Facs:
Sentry, Jason
Project
PI/Institution
Project #
Days/Agency/Status
SEEPS 13
David L. Valentine
/
UCSB
1046144
14/NSF-OCE-BIO/F
Fate of Natural Gas
David L. Valentine
/
UCSB
1155855
13/NSF-OCE-CO/F
Sentry Eng Dive
Not Specified
1/NSF-OCE-IPS/F
JASON + SENTRY
Not Specified
0/OTHER/P
Notes:
Jason coming from RV Thompson. Offload 9/20 Seattle WA.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
20 Oct 2013
Dep:
21 Oct 2013
Arr:
19 Nov 2013
Unload:
22 Nov 2013
San Diego, CA, USA
San Diego, CA, USA
/
0N/0E
0N/0E
30/34
Ancil Facs:
Alvin
Project
PI/Institution
Project #
Days/Agency/Status
HOV Sea Trials
Patrick Hickey
/
WHOI
Not Specified
34/NSF-OCE-IPS/F
HOV ALVIN
Not Specified
0/INST/F
PART II
Not Specified
0/OTHER/F
Notes:
Alvin Certification Cruise part II. San Diego for dock and harbor trials. Then move off shore to do open sea trials. Finish San Diego.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
22 Nov 2013
Dep:
23 Nov 2013
Arr:
23 Nov 2013
Unload:
23 Nov 2013
San Diego, CA, USA
San Diego, CA, USA
/
0N/0E
0N/0E
0/1
Ancil Facs:
Sentry, Jason
Project
PI/Institution
Project #
Days/Agency/Status
Doroda Outcrop
Charles G. Wheat
/
UAF_CFOS
1130146
1/NSF-OCE-MGG/F
Reload JASON SENTRY
Not Specified
0/OTHER/P
Notes:
This is a 1 day mob to re-load AUV Sentry and ROV Jason on main deck.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
24 Nov 2013
Dep:
24 Nov 2013
Arr:
03 Dec 2013
Unload:
03 Dec 2013
San Diego, CA, USA
Puntarenas, Costa Rica
/
0N/0E
0N/0E
10/10
Project
PI/Institution
Project #
Days/Agency/Status
Transit
Not Specified
5/NSF-OCE-MGG/F
Not Specified
5/NSF-BIO-DEB/F
Notes:
San Fran to Puntarenas = 2850 = 12 days San Diego to Puntarenas = 2479nm = 9 + 1= 10 days. Pre Load Jason ?
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
04 Dec 2013
Dep:
07 Dec 2013
Arr:
23 Dec 2013
Unload:
25 Dec 2013
Puntarenas, Costa Rica
Puntarenas, Costa Rica
Costa Rica/
NP13
NP13
9N/87W
9N/84W
Charles G. Wheat
17/22
Clearances:
Costa Rica(S)
Ancil Facs:
Sentry, Jason
Project
PI/Institution
Project #
Days/Agency/Status
Doroda Outcrop
Charles G. Wheat
/
UAF_CFOS
1130146
21/NSF-OCE-MGG/F
Jason Eng Dive
Not Specified
1/NSF-OCE-IPS/F
JASON + SENTRY
Not Specified
0/OTHER/P
Notes:
10/25/13: Reduced this cruise 7 days to allow more ALVIN Cert time in November. The 7 days will be made up in 2014. 4/17/13: Added 3 days onto WHEAT cruise (per NSF).
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
26 Dec 2013
Dep:
29 Dec 2013
Arr:
27 Jan 2014
Unload:
29 Jan 2014
Puntarenas, Costa Rica
Balboa, Panama
9 North / EPR/
0N/0E
0N/0E
30/35
Ancil Facs:
Jason
Project
PI/Institution
Project #
Days/Agency/Status
Deep-sea vent micro
Stefan M. Sievert
/
WHOI
1136727
6/NSF-BIO-DEB/F
ROV JASON
Not Specified
0/OTHER/F
Notes:
10/1: Sievert switched NDSF vehicle to JASON. Removed 1 Alvin Eng. Dive day from cruise. 4/17/13: Shifted SIEVERT cruise 3 days later (Wheat added 3 days). Subtract 1 day for 2013 op days (1/1/14). 1575 from EPR to Balboa = 7 days 550 station to Manz = 2 days 1175nm Puntatreanas CR to EPR = 4.5 days 1560 nm 9.8N to S.D = 7 day transit. 4 day mob 2 day demob with Jason (+4 more days).
Agency
Funded
Pending
Total
INST
0
0
0
NAVY
6
0
6
NSF
223
0
223
OTHER
0
0
0
Total
229
0
229
<
<