  2015 - Thomas G. Thompson  
2015 Final Schedule
Final - ID #12476    Version #4 - 1/8/2016

Scheduling Contact(s)
Robert Kamphaus kamphaus*%*%*uw^%^%^edu (206) 685-5672
Elizabeth A. Rios Brenner ebrenner2156*%*%*att^%^%^net (760) 801-9650

  Notes:   1/6/2016 - Updated & finalized schedule
12/22/15 - Updated day allocations for TN-332
12/7/15 - updated to reflect day lost during academic cruises due to bow thruster issue
10/27/15 - Revised Heintz/Zumberge/Wilcock cruise. Finished a day earlier than planned.
10/19/2015 - Added maintenance days
9/3/15 - Updated cruise numbers.
9/2/2015 - Updated USCG/ABS Inspection dates.
8/24/2015 - shifted Cascadia mobe day over to science day for Dever as more science time needed to work around partial de-mobe of JASON and size of moorings.
8/5/2015 - added one day of mobe to Cascadia cruise. More mobe time needed after JASON is partially demobed/mobed for the Dever mooring cruise.
7/27/2015 - changed Chief Scientist for TN-327 to Bill Chadwick
6/29/2015 - Updated funding for TN-325 transit and TN-326 RSN OOI-O&M cruise
6/24/2015 - Changed Chief Scientist for academic cruise to Craig Lee. Updated anticipated dates for USCG Inspection.
6/16/2015 - Schedule revised to add Axial Eruption Response work to Nooner cruise, add Endurance Array cruise, and to add additional cruise for JASON Engineering, Zumberge instrument deployment, and Wilcock instrument/benchmark deployments. Also, McGuire cruise postponed until 2016.
10/2/2014 - Deleted Terrill cruise & xsits. Cruise not funded.
10/13/2014 - Zumberge cruise deleted. PI won't be ready.
11/26/2014 - Added Ohman CCE-LTER cruise
12/8/2014 - Deleted Jenner TAO cruise, modified Ohman cruise, shifted SD-SEA xsit
12/17/2014 - Added Jenner TAO cruise back in, modified RSN cruise, modified SD-SEA xsit, changed end of year shipyard to regulatory drydocking
12/22/2014 - deleted Ohman cruise, adjusted Delaney/RSN cruise one day to allow full JASON mobe if needed.
1/30/15 - ROPOS indicated as ROV for RSN cruise. Changed port for conclusion of Kulin/ONC and start of McGuire/ACork cruises per request and agreement of Chief Scientists.
2/17/15 - Replaced 3 ONC days with 3 Di Iorio days for ONC cruise per PI request/ONC concurrence. Cruise duration remains the same.
2/19/15 - Moved RSN cruise, added Key Okmok MT OBS cruise and DH-Sea transit. Revised ONC to finish in Esquimalt & start ACORK from there per request & concurrence of Chief Scientists.
3/11/15 - Modified San Diego-Sea Xsit to add in ChaBa/NeMO work enroute incl port stop in Newport to unload mooring gear/personnel
3/12/15 - Modified Cascadia cruise to finish in Newport. Added Heintz/Zumberge/Wilcock cruise from Newport to Seattle finishing 19 Oct for JASON Engineering & instrument deployments.
3/18/15 - Modified RSN cruise details
3/30/15 - Added another day to the Heintz/Zumberge cruise
4/3/15 - adjusted funding sources for RSN & preceding transit per discussions with RSN & OCE
5/4/15 - Added 2 UW funded days to Zumberge/JASON cruise. Deleted October drydock maint period. D/D to be completed earlier within schedule so bow thruster repairs can be completed.
5/21/15 - updated dates of SD-Portland xsit, maintenance in Portland, and revised dates for Mickett cruise.
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:27 Dec 2014
Dep:27 Dec 2014
Arr:13 Jan 2015
Unload:13 Jan 2015
 
Seattle, WA, USA
Seattle, WA, USA
 
Station Papa/
NP06
NP06
 
 
 
50N/145W
50N/145W
 
  James M. Thomson
  18/18

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Phase-resolve brking James M. Thomson/UW_APL 1332719 13/NSF-OCE/F
 
Notes: TN-317

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:15 Jan 2015
Dep:15 Jan 2015
Arr:30 Jan 2015
Unload:30 Jan 2015
 
Seattle, WA, USA
Seattle, WA, USA
 
UW/
NP09
NP09
 
 
 
48N/122W
48N/122W
 
  Doug Russell
Maintenance
  16/16

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Maintenance Doug Russell/UW Not Specified 0/INST-UW/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:03 Feb 2015
Dep:03 Feb 2015
Arr:08 Feb 2015
Unload:08 Feb 2015
 
Seattle, WA, USA
San Diego, CA, USA
 
NE Pacific/
NP09
NP09
 
 
 
48N/122W
33N/117W
 
  Doug Russell
Transit
  6/6

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Reposition ship Not Specified 6/NSF-OCE/F
 
Notes: TN-318

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Feb 2015
Dep:13 Feb 2015
Arr:25 Mar 2015
Unload:27 Mar 2015
 
San Diego, CA, USA
San Diego, CA, USA
 
12N Pacific/
NP13
NP13
 
 
 
12N/117W
12N/117W
 
  Seafloor LLC
  41/47

Clearances: NONE(T)

Ancil Facs: Other ROV
 
Project PI/Institution Project # Days/Agency/Status
ABYSSLINE02 Seafloor LLC/SFI SRD-AB02 47/OTHER/F
 
Notes: TN-319

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:03 Apr 2015
Dep:06 Apr 2015
Arr:10 May 2015
Unload:12 May 2015
 
San Diego, CA, USA
San Diego, CA, USA
 
Equatorial PAC/
NP13
SP03
 
 
 
8N/110W
8S/95W
 
  Jeff Jenner
  35/40

Clearances: France(A)
 
Project PI/Institution Project # Days/Agency/Status
TAO Service Jeff Jenner/NOAA_NDBC Not Specified 40/NOAA-NWS-NDBC/F
 
Notes: TN-320

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:13 May 2015
Dep:13 May 2015
Arr:16 May 2015
Unload:16 May 2015
 
San Diego, CA, USA
Portland, OR, USA
 
NE Pacific/
NP09
NP09
 
 
 
32N/117W
48N/122W
 
 
Transit
  4/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Reposit for OOI Not Specified 4/NSF-OOI-OOI/F
 
Notes: TN-321

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 May 2015
Dep:17 May 2015
Arr:21 May 2015
Unload:21 May 2015
 
Portland, OR, USA
Portland, OR, USA
 
UW Dock/
NP09
NP09
 
 
 
48N/122W
48N/122W
 
  Doug Russell
Shipyard
  5/5

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
ABS Inspections Doug Russell/UW Not Specified 0/INST-UW/NonOp
 
Notes: Regulatory D/D inspection & bow thruster repair

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:22 May 2015
Dep:22 May 2015
Arr:25 May 2015
Unload:25 May 2015
 
Portland, OR, USA
Seattle, WA, USA
 
West Coast/
NP09
NP09
 
 
 
45N/124W
48N/122W
 
  John Mickett
  4/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Cha Ba/NEMO John Mickett/UW_APL Not Specified 4/INST-UW/F
 
Notes: TN-322

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:29 May 2015
Dep:29 May 2015
Arr:14 Jun 2015
Unload:16 Jun 2015
 
Seattle, WA, USA
Dutch Harbor, AK, USA
 
Papa/
NP09
NP09
 
 
 
48N/122W
48N/122W
 
  Uwe Send
  17/19

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI Papa Weller OOI Project Team/WHOI Not Specified 19/NSF-OOI-OOI/F
 
Notes: TN-323

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Jun 2015
Dep:18 Jun 2015
Arr:21 Jun 2015
Unload:22 Jun 2015
 
Dutch Harbor, AK, USA
Dutch Harbor, AK, USA
 
Umnak Island/
NP05
NP05
 
 
 
54N/169W
51N/167W
 
  Kerry Key
  4/6

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Okmok MT Kerry Key/LDEO 1456710 (GeoPrisms) 6/NSF-OCE-MGG/F
Okmok MT Kerry Key/LDEO Not Specified 0/NSF-OCE/F
 
Notes: TN-324

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:23 Jun 2015
Dep:23 Jun 2015
Arr:29 Jun 2015
Unload:29 Jun 2015
 
Dutch Harbor, AK, USA
Seattle, WA, USA
 
Gulf of Alaska/
NP05
NP09
 
 
 
54N/166W
48N/122W
 
 
Transit
  7/7

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Reposit for RSN Not Specified 5/NSF-OCE/F
Resposit for RSN Not Specified 2/INST-UW/F
 
Notes: TN-325

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:04 Jul 2015
Dep:04 Jul 2015
Arr:07 Aug 2015
Unload:07 Aug 2015
 
Seattle, WA, USA
Seattle, WA, USA
 
Cabled Array/
NP09
NP09
 
 
 
44N/125W
44N/125W
 
  Deborah S. Kelley
  35/35

Clearances: NONE(T)

Ancil Facs: Other ROV
 
Project PI/Institution Project # Days/Agency/Status
OOI-O&M Delaney OOI Project Team/UW Not Specified 30/NSF-OOI-OOI/F
MREFC-RSN Install Deborah S. Kelley/UW Not Specified 5/NSF-OCE-EDU/F
 
Notes: TN-326.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Aug 2015
Dep:14 Aug 2015
Arr:29 Aug 2015
Unload:29 Aug 2015
 
Seattle, WA, USA
Seattle, WA, USA
 
Axial Seamount/
NP09
NP09
 
 
 
46N/130W
46N/130W
 
  William W. Chadwick
  16/16

Clearances: NONE(T)

Ancil Facs: Sentry, Jason
 
Project PI/Institution Project # Days/Agency/Status
Axial Geodesy 2013 Scott L. Nooner/UNCW 1356216 8/NSF-OCE-MGG/F
NEMO Vents David Butterfield/UW Not Specified 5/NOAA/F
JASON Engineering Scott L. Nooner/UNCW Not Specified 3/NSF-OCE/F
Sentry at Axial William W. Chadwick/OSU_HMSC OCE-1356839 0/NSF-OCE-MGG/F
 
Notes: TN-327. Mobe JASON in Seattle 8/10-8/13

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Sep 2015
Dep:02 Sep 2015
Arr:18 Sep 2015
Unload:18 Sep 2015
 
Seattle, WA, USA
Esquimalt Harbor, Vancouver, Canada
 
Juan de Fuca/
NP09
NP09
 
 
 
49N/125W
48N/129W
 
  Ian Kulin
  17/17

Clearances: NONE(T)

Ancil Facs: Jason
 
Project PI/Institution Project # Days/Agency/Status
Ocean Networks CDN Kate Moran/UVic Not Specified 13/OTHER/F
Scintillation Exp Daniela Di Iorio/Georgia 1334124 3/NSF-OCE-OTIC/F
COVIS Russ Light/UW_APL 0824612 1/NSF-OCE-OTIC/F
 
Notes: TN-328

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Sep 2015
Dep:19 Sep 2015
Arr:20 Sep 2015
Unload:20 Sep 2015
 
Esquimalt Harbor, Vancouver, Canada
Newport, OR, USA
 
WA/OR coast/
NP09
NP09
 
 
 
48N/124W
45N/124W
 
  Doug Russell
Transit
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Reposit for Dever Not Specified 1/NSF-OCE/F
Reposit for Dever Not Specified 1/NSF-OOI-OOI/F
 
Notes: TN-329

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:21 Sep 2015
Dep:22 Sep 2015
Arr:27 Sep 2015
Unload:28 Sep 2015
 
Newport, OR, USA
Newport, OR, USA
 
Endurance Array/
NP09
NP09
 
 
 
44N/124W
44N/124W
 
  Edward P. Dever
  6/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Endurance Array Edward P. Dever/OSU-CEOAS Not Specified 5/NSF-OOI-OOI/F
Endurance Array Edward P. Dever/OSU-CEOAS Not Specified 3/NSF-OCE-IPS/F
 
Notes: TN-330

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:29 Sep 2015
Dep:01 Oct 2015
Arr:15 Oct 2015
Unload:16 Oct 2015
 
Newport, OR, USA
Newport, OR, USA
 
Cascadia/
NP09
NP09
 
 
 
44N/124W
47N/126W
 
  William Wilcock
  15/18

Clearances: NONE(T)

Ancil Facs: Jason
 
Project PI/Institution Project # Days/Agency/Status
Cascadia Initiative Douglas R. Toomey/Oregon 1139701 18/NSF-OCE-MGG/F
 
Notes: TN-331

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Oct 2015
Dep:17 Oct 2015
Arr:27 Oct 2015
Unload:27 Oct 2015
 
Newport, OR, USA
Seattle, WA, USA
 
WA/OR Coast/
NP09
NP09
 
 
 
45N/124W
48N/122W
 
  Matt Heintz
  11/11

Clearances: NONE(T)

Ancil Facs: Jason
 
Project PI/Institution Project # Days/Agency/Status
BPR & Benchmarks William Wilcock/UW Not Specified 5/INST-UW/F
JASON Eng Matt Heintz/WHOI Not Specified 4/NSF-OCE/F
SIOFS2013 Mark Zumberge/SIO 1235384 2/NSF-OCE-OTIC/F
 
Notes: TN-332. Engineering dives for JASON to prep for 2016 ops. Installation of Optical Strainmeter for Mark Zumberge. Recovery & installation of pressure logger and concrete benchmarks for William Wilcock. De-mobe JASON in Seattle 28-30 Oct.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Nov 2015
Dep:02 Nov 2015
Arr:03 Nov 2015
Unload:03 Nov 2015
 
Seattle, WA, USA
Seattle, WA, USA
 
Homeport/
NP09
NP09
 
 
 
48N/122W
48N/122W
 
  Doug Russell
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
USCG/ABS Inspections Doug Russell/UW Not Specified 0/INST-UW/NonOp

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:12 Nov 2015
Dep:12 Nov 2015
Arr:22 Nov 2015
Unload:22 Nov 2015
 
Seattle, WA, USA
Seattle, WA, USA
 
Puget Sound/
NP09
NP09
 
 
 
48N/122W
48N/122W
 
  Susan Hautala
  11/11

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
UW Academic Cruises Virginia Armbrust/UW Not Specified 11/INST-UW/F
 
Notes: TN-333. Schedule as follows: Nov 10: Tue - mob; Nov 11: Wed - Ocean 210, Curtis Deutsch (cx due to bow thruster issue); Nov 12: Thu - Ocean 230, Chuck Nittrouer; Nov 13-15: Fri-Sun - Ocean 452 Emily Roland / Miles Logsdon; Nov 16-20: Mon-Fri - Nanoos / IGERT / ChaBa, Jan Newton; Nov 21-22: Sat-Sun - Ocean 250 Marine Biology, Thomas Pool; Nov 23: - Mon demob

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:23 Nov 2015
Dep:23 Nov 2015
Arr:23 Nov 2015
Unload:23 Nov 2015
 
Seattle, WA, USA
Seattle, WA, USA
 
Seattle/
NP09
NP09
 
 
 
48N/122W
48N/122W
 
  Doug Russell
Available for Service
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Full Power Trial Doug Russell/UW Not Specified 0/INST-UW/NonOp
 
Notes: Outstanding insp item from 2014 INSURV - successfully completed.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:25 Nov 2015
Dep:25 Nov 2015
Arr:08 Dec 2015
Unload:08 Dec 2015
 
Seattle, WA, USA
Seattle, WA, USA
 
UW/
NP09
NP09
 
 
 
48N/122W
48N/122W
 
  Doug Russell
Maintenance
  14/14

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Maintenance Doug Russell/UW Not Specified 0/INST-UW/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:10 Dec 2015
Dep:10 Dec 2015
Arr:20 Dec 2015
Unload:20 Dec 2015
 
Seattle, WA, USA
Seattle, WA, USA
 
Puget Sound/
NP09
NP09
 
 
 
48N/122W
48N/122W
 
  Craig M. Lee
  11/11

Clearances: Canada(A)
 
Project PI/Institution Project # Days/Agency/Status
Senior Projects Crui Virginia Armbrust/UW Not Specified 11/INST-UW/F
 
Notes: TN-334

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:21 Dec 2015
Dep:21 Dec 2015
Arr:31 Dec 2015
Unload:31 Dec 2015
 
Seattle, WA, USA
Seattle, WA, USA
 
UW/
NP09
NP09
 
 
 
48N/122W
48N/122W
 
  Doug Russell
Maintenance
  11/11

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Maintenance Doug Russell/UW Not Specified 0/INST-UW/F
Agency   Funded   Pending   Total
INST   33   0   33
NOAA   45   0   45
NSF   78   0   78
NSF-OOI   59   0   59
OTHER   60   0   60
Total  275 0 275
<
<