View Schedule

or schedule as:
the schedule as:
  2021 - Kilo Moana  
Kilo Moana 2021- Version 12
Secure - ID #14434    Version #12 - 6/25/2021

Scheduling Contact(s)
Anita Lopez alopez8*%*%*hawaii^%^%^edu (808) 224-2680

  Notes:   Updated: 6/7/2021
6/7: Updated cruise ID's
2/4: Pushed back HOT 328 cruise to accommodate for CTD LARS Testing and contractor quarantine.
1/8: Added Taylor REU ROV Cruise, Moved Carter from Feb to Dec.
5/19 Removed Wommack moved Laske and Carter
Swap Taylor and Howe due to Naval activity at ACO
Schedule is subject to change due to COVID-19 pandemic issues.

Wommack removed. Renumbered expeditions
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jan 2021
Dep:01 Jan 2021
Arr:07 Jan 2021
Unload:07 Jan 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
NP12/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Anita Lopez
Available for Service
  7/7

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:08 Jan 2021
Dep:11 Jan 2021
Arr:15 Jan 2021
Unload:15 Jan 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
Station ALOHA/
NP12
NP12
 
 
 
23N/158W
23N/158W
 
  Angelicque White
  5/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
HOT 2018-2023 Angelicque White/UH_SOEST 1756517 6/NSF-OCE-BIO/F
 
Notes: KM-21-01 HOT 326 (1)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:16 Jan 2021
Dep:16 Jan 2021
Arr:11 Feb 2021
Unload:11 Feb 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
NP12/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Anita Lopez
Available for Service
  27/27

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:12 Feb 2021
Dep:15 Feb 2021
Arr:19 Feb 2021
Unload:19 Feb 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
Station ALOHA/
NP12
NP12
 
 
 
23N/158W
23N/158W
 
  Angelicque White
  5/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
HOT 2018-2023 Angelicque White/UH_SOEST 1756517 6/NSF-OCE-BIO/F
 
Notes: KM-21-02 HOT 327 (2)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 Feb 2021
Dep:20 Feb 2021
Arr:21 Feb 2021
Unload:21 Feb 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
NP12/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Anita Lopez
Available for Service
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:22 Feb 2021
Dep:22 Feb 2021
Arr:02 Mar 2021
Unload:02 Mar 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
NP12/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Anita Lopez
Overhaul or Repair
  9/9

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: DG Overhaul

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:03 Mar 2021
Dep:03 Mar 2021
Arr:04 Mar 2021
Unload:04 Mar 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
NP12/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Anita Lopez
Available for Service
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:05 Mar 2021
Dep:05 Mar 2021
Arr:19 Mar 2021
Unload:19 Mar 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
pacific/
NP12
NP12
 
 
 
20N/155W
20N/155W
 
  Anita Lopez
Standby Days
  15/15

Clearances: US EEZ(S)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: 3/5: Crew Change + Quarantine

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 Mar 2021
Dep:20 Mar 2021
Arr:20 Mar 2021
Unload:20 Mar 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
NP10/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Anita Lopez
Available for Service
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:21 Mar 2021
Dep:22 Mar 2021
Arr:26 Mar 2021
Unload:26 Mar 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
hawaii/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Angelicque White
  5/6

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
HOT 2018-2023 Angelicque White/UH_SOEST 1756517 6/NSF-OCE-BIO/F
 
Notes: KM-21-03 HOT 328 (3)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:27 Mar 2021
Dep:27 Mar 2021
Arr:08 Apr 2021
Unload:08 Apr 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
NP12/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Anita Lopez
Available for Service
  13/13

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Apr 2021
Dep:12 Apr 2021
Arr:16 Apr 2021
Unload:16 Apr 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
hawaii/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Angelicque White
  5/8

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
HOT 2018-2023 Angelicque White/UH_SOEST 1756517 6/NSF-OCE-BIO/F
 
Notes: KM-21-04 HOT 329 (4)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Apr 2021
Dep:17 Apr 2021
Arr:13 May 2021
Unload:13 May 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
honolulu/
NP12
NP12
 
 
 
21N/157W
21N/157W
 
  Anita Lopez
Available for Service
  27/27

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 May 2021
Dep:15 May 2021
Arr:19 May 2021
Unload:19 May 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
hawaii/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Angelicque White
  5/6

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
HOT 2018-2023 Angelicque White/UH_SOEST 1756517 6/NSF-OCE-BIO/F
 
Notes: KM-21-05 HOT 330 (5)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:24 May 2021
Dep:24 May 2021
Arr:29 May 2021
Unload:29 May 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
NP12/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Brian Taylor
  6/6

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
SOEST REU Brian Taylor/UH_Manoa Not Specified 6/INST/F
 
Notes: KM-21-06 Brian Taylor REU cruise w/ ROV Luukai

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 May 2021
Dep:30 May 2021
Arr:02 Jun 2021
Unload:03 Jun 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
Station Aloha/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Bruce M. Howe
  4/15

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
ACO Continuing O&M Bruce M. Howe/UH_SOEST 1926188 9/NSF-OCE-OTIC/F
 
Notes: KM-21-07 w/ ROV Lu'ukai, Deferred from 2020.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:04 Jun 2021
Dep:04 Jun 2021
Arr:04 Jun 2021
Unload:04 Jun 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
NP12/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Anita Lopez
Available for Service
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:05 Jun 2021
Dep:06 Jun 2021
Arr:17 Jun 2021
Unload:18 Jun 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
North Pacific/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Tracy Villareal
  12/14

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
TEP and migrators Tracy Villareal/UTMSI 1923667 14/NSF-OCE-BIO/F
 
Notes: KM-21-08

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Jun 2021
Dep:21 Jun 2021
Arr:25 Jun 2021
Unload:25 Jun 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
hawaii/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Angelicque White
  5/7

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
HOT 2018-2023 Angelicque White/UH_SOEST 1756517 6/NSF-OCE-BIO/F
 
Notes: KM-21-09 HOT 331 (6)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:26 Jun 2021
Dep:26 Jun 2021
Arr:04 Jul 2021
Unload:04 Jul 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
pacific/
NP12
NP12
 
 
 
20N/154W
20N/154W
 
  Anita Lopez
Available for Service
  9/9

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Wommack cancelled, project to be conducted off the east coast

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:05 Jul 2021
Dep:06 Jul 2021
Arr:11 Jul 2021
Unload:12 Jul 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
Hawaii/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Michael Gonsior
  6/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Picocyanobacteria Michael Gonsior/UMD_CBL 1829888 8/NSF-OCE-CO/F
 
Notes: KM-21-10, Deferred from 2020

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:13 Jul 2021
Dep:13 Jul 2021
Arr:13 Jul 2021
Unload:13 Jul 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
NP12/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Anita Lopez
Standby Days
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Crew Change Day

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Jul 2021
Dep:15 Jul 2021
Arr:19 Jul 2021
Unload:19 Jul 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
hawaii/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Angelicque White
  5/6

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
HOT 2018-2023 Angelicque White/UH_SOEST 1756517 6/NSF-OCE-BIO/F
 
Notes: KM-21-11 HOT 332 (7)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 Jul 2021
Dep:21 Jul 2021
Arr:04 Aug 2021
Unload:05 Aug 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
Station Aloha/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Angelicque White
  15/17

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
SCOPE: 2020-2024 David Karl/UH_SOEST Not Specified 17/OTHER/F
 
Notes: KM-21-12

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Aug 2021
Dep:06 Aug 2021
Arr:08 Aug 2021
Unload:08 Aug 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
NP15/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Anita Lopez
Available for Service
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Aug 2021
Dep:13 Aug 2021
Arr:27 Sep 2021
Unload:29 Sep 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
NWHI/Emperors/
NP08
NP11
 
 
 
36N/171E
25N/172W
 
  Amy Baco-Taylor
  46/52

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Defying Dissolution Amy Baco-Taylor/FSU 1851365 51/NSF-OCE-BIO/F
Luukai Maintenance Anita Lopez/UH Not Specified 1/INST/F
 
Notes: KM-21-13 w/ ROV Lu'ukai, Deferred from 2020

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Sep 2021
Dep:01 Oct 2021
Arr:05 Oct 2021
Unload:05 Oct 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
hawaii/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Angelicque White
  5/6

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
HOT 2018-2023 Angelicque White/UH_SOEST 1756517 6/NSF-OCE-BIO/F
 
Notes: KM-21-14 HOT 333 (8)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Oct 2021
Dep:09 Oct 2021
Arr:27 Oct 2021
Unload:28 Oct 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
NP12/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Anita Lopez
  19/23

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
DORD Not Specified 23/OTHER/F
 
Notes: KM-21-15 DORD

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:29 Oct 2021
Dep:30 Oct 2021
Arr:03 Nov 2021
Unload:03 Nov 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
hawaii/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Angelicque White
  5/6

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
HOT 2018-2023 Angelicque White/UH_SOEST 1756517 6/NSF-OCE-BIO/F
 
Notes: KM-21-16 HOT 334 (9)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:04 Nov 2021
Dep:06 Nov 2021
Arr:28 Nov 2021
Unload:29 Nov 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
Open Ocean/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  M. Gabriele Laske
  23/26

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Pacific Anisotropy M. Gabriele Laske/SIO 1830959 26/NSF-OCE-MGG/F
 
Notes: KM-21-17

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Nov 2021
Dep:30 Nov 2021
Arr:30 Nov 2021
Unload:30 Nov 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
NP12/
NP12
NP12
 
 
 
21N/157W
21N/157W
 
  Anita Lopez
Available for Service
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Dec 2021
Dep:02 Dec 2021
Arr:06 Dec 2021
Unload:06 Dec 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
hawaii/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Angelicque White
  5/6

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
HOT 2018-2023 Angelicque White/UH_SOEST 1756517 6/NSF-OCE-BIO/F
 
Notes: KM-21-18 HOT 335 (10)

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Dec 2021
Dep:07 Dec 2021
Arr:08 Dec 2021
Unload:08 Dec 2021
 
Honolulu, HI, USA
Honolulu, HI, USA
 
Hawaii/
NP12
NP12
 
 
 
21N/158W
21N/158W
 
  Glenn Carter
  2/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
HWCP Glenn Carter/UH_SOEST Not Specified 2/INST/F
HWCP Glenn Carter/UH_SOEST Not Specified 0/OTHER/F
 
Notes: KM-21-19 Deferred from 2020.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Dec 2021
Dep:13 Dec 2021
Arr:31 Dec 2021
Unload:31 Dec 2021
 
Honolulu, HI, USA
Apra Harbor, Guam
 
Mariana/Wake Is/
NP10
NP10
 
 
 
13N/145E
13N/145E
 
  Jasper Konter
  19/23

Clearances: Japan(T), Marshall Islands(T), US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Cretaceous APM&LIPs Jasper Konter/UH_SOEST 1912934 20/NSF-OCE-MGG/F
 
Notes: KM-21-20: Transit to Guam ; KM-21-21: Konter Cruise.
Agency   Funded   Pending   Total
INST   9   0   9
NSF   188   0   188
OTHER   40   0   40
Total  237 0 237
<
Day Type   Total
Available for Service   93
Standby Days   16
Overhaul or Repair   9
At Sea for Science   202
Total  320
<
Load/Unload Days   Total
ChargeLoad   27
ChargeUnload   8
NonChargeLoad   16
Total  51