View Schedule
or
schedule as:
Expanded (Text)
Condensed (Text)
Expanded (PDF)
Send schedule email to:
*
One or more invalid email addresses
Note for recipient(s):
the schedule as:
Excel XML
CSV
Google Earth Map (KML)
ICal Calendar
2011
-
Atlantis
2011 Final
Final
- ID #
11329
Version #
3
-
1/10/2012
Scheduling Contact(s)
Kerry Strom
kstrom*%*%*whoi^%^%^edu
(508) 289-3938
Notes:
1/3/12: Updated arrival Port Everglades to Dec 31. End 2011
12/12/11: Update arrival into Piraeus Greece Dec 8.
11/22/11: Update RV Atlantis arrival Piraeus Greece Nov 21
10/19/11: Added 3 days onto Nooner/Webb cruise. Shifted all subsequent transits and cruises 3 days later. Oct 29 will be Panama Canal transit.
Sept 29: Changed German mob / demob port to Port Everglades. Added 2 days onto German cruise, 1 for Jason Engineering dive and 1 for transit (this will show in 2012 schedule).
Aug 31: Johnson / Tivey cruise arrived 2 days early = 8/24. Added two Demob days onto their schedule 8/25 & 8/26.
Aug 11: Edited Chadwick charge days between all co-Pi's.
Aug 9: reconciled 2 op days on Fisher cruise from 21 to 23 = 219 total op days for 2011.
August 2: Changed FISHER departure date to June 29.
June 10: M.Zumberge droped out 2011 CHADWICK cruise. 1 dive day reduced = able to add in the 2nd mob day as originally scheduled. NO Change to NSF charge days. New Departure July 19.
May 25: Changed June 13 - 17 San Diego port call. Added multibeam test and transit days to Astoria. Change of mob port for Fisher/Cowen/Becker in Astoria June 24- 27.
May 24: Added one extra mobilization day that was lost due to A.Devol cruise being postponed to 2012. (we were using his 2nd demob day due to short turn around time in port).
May 19: Jax ETD May 25. Sea trial May 24. Fuel and Final departure May 25 for San Diego. ETA SD June 13
May 3: Added 3 days for multibeam test (separated out from transit) - dates tbd.
May 2, 2011: Canceled DEVOL cruise & removed 3 days for multibeam transit. New op days 213.
Shifted Nooner to Oct 4 2011 / added Edgcomb and transit to C.German cruise. rescheduled Geotraces onto Knorr
3/30: Changed transit dates from Jax to San Digeo April 23 2011 - 23 days for multibeam testing.
3/17: May 4 -16 port call identified as Maintenance/A Frame mods
2/16/11: Added NSF Inspection May 3 -4
2/9/11: Changed departure date for Chadwick cruise to July 18.
1/4/11: Combined 4 day transit from GLFPT to JAX with SY period, combined Geotraces MOB with Transit to CV
1/4/11: Removed Schopfel cruise / 16 days ONR
11/24: Jenkins/Geotraces cruise added
11/04/10: Added Manzanillio Mx port stop to chng out science June 1 -2 / DEVOL
10/29/10: Removed HROV days, ports & dates after Valentine TBD
10/29/10: Added transit days to Jason JdF cruises for transit from station to port
NOTE: A-FRAME MOD PORT TBD
View Summary
Set Default
Associated Cruises
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
01 Jan 2011
Dep:
01 Jan 2011
Arr:
24 May 2011
Unload:
24 May 2011
Jacksonville, FL, USA
Jacksonville, FL, USA
/
0N/0E
0N/0E
Maintenance
143/143
Project
PI/Institution
Project #
Days/Agency/Status
Shipyard
Not Specified
0/OTHER/F
Notes:
Shipyard period starts Dec 21 - May 24.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
19 Mar 2011
Dep:
20 Mar 2011
Arr:
20 Mar 2011
Unload:
20 Mar 2011
Jacksonville, FL, USA
Jacksonville, FL, USA
/
0N/0E
0N/0E
0/1
Project
PI/Institution
Project #
Days/Agency/Status
Load Jason
Not Specified
1/NSF-OCE-EDU/F
Notes:
Jason was loaded Mar 20 then off loaded Mar 21 due to vessel bow thruster failure.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
25 May 2011
Dep:
25 May 2011
Arr:
13 Jun 2011
Unload:
13 Jun 2011
Jacksonville, FL, USA
San Diego, CA, USA
/
0N/0E
0N/0E
Transit
20/20
Project
PI/Institution
Project #
Days/Agency/Status
deadhead transit
Not Specified
20/NSF-OCE-EDU/F
Notes:
Jax to San Diego = 20 days Jax to Cristobal = 6 Panama Canal = 1 Panama to SD = 12 3 days added for multibeam testing = 23 days total ** 5/2//11: took out 3 multibeam test days. Used in transit from SD to Astoria June 17 - 23.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Jun 2011
Dep:
14 Jun 2011
Arr:
16 Jun 2011
Unload:
16 Jun 2011
San Diego, CA, USA
San Diego, CA, USA
/
0N/0E
0N/0E
3/3
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
17 Jun 2011
Dep:
17 Jun 2011
Arr:
23 Jun 2011
Unload:
23 Jun 2011
San Diego, CA, USA
Astoria, OR, USA
/
0N/0E
0N/0E
7/7
Project
PI/Institution
Project #
Days/Agency/Status
Multibeam Testing
Not Specified
3/NSF-OCE-EDU/F
JFR flank hydrogeo
Andrew T. Fisher
/
UCSC
1031808
2/NSF-OCE-ODP/F
1024C dive
Keir Becker
/
RSMAS
OCE-0726887
1/NSF-OCE-ODP/F
Microbial Ecology
James Cowen
/
UH_SOEST
MCB 0604014
1/NSF-BIO-MCB/F
Notes:
This is a transit using the following cruise transit days 4 (Fishers 4 transit days from SD to site) + 3 NSF days to test and train on the new EM122 multibeam. 7 total days (4 transit + 3 testing) split between NSF, Fisher, Cowen, Becker. Adjusts total days on the next cruise (FISHER/COWEN/BECKER)
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
24 Jun 2011
Dep:
29 Jun 2011
Arr:
14 Jul 2011
Unload:
16 Jul 2011
Astoria, OR, USA
Astoria, OR, USA
/
0N/0E
0N/0E
Andrew T. Fisher
16/23
Project
PI/Institution
Project #
Days/Agency/Status
JFR flank hydrogeo
Andrew T. Fisher
/
UCSC
1031808
19/NSF-OCE-ODP/F
1024C dive
Keir Becker
/
RSMAS
OCE-0726887
2/NSF-OCE-ODP/F
Microbial Ecology
James Cowen
/
UH_SOEST
MCB 0604014
2/NSF-BIO-MCB/F
JASON
Not Specified
0/OTHER/F
Notes:
Aug 9: reconciled 2 missing op days. Miss calculated when mob port was changed to Astoria. New total op days is 23. 1074nm from San Diego to dive site/4 days transit/1 day arriv.dpt/ 1 day to Astoria: Total 6 days transit Andy Fisher 11, Keir Becker 1, Jim Cowen 1 total science days: 13 I'm attaching the recently-released IODP drilling schedule. With respect to scheduling for Summer 2011 Juan de Fuca flank activities (OCE-1031808 and linked), the primary potential for conflict is with 3-4 among our collaborator group associated with IODP Expedition 336, North Atlantic Microbiology. Although that expedition begins around 9/17/11, many of the co-PIs for that program will be working down to the last minute to prepare engineering and scientific equipment and shipping it out to make IODP deadlines. For that reason, it will be best for us to have our Atlantis/Jason JdF flank program scheduled as early in our weather window as possible - June start will be ideal. We realize that you are balancing the needs of many groups. Thanks for your efforts in support of all of this work.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
17 Jul 2011
Dep:
19 Jul 2011
Arr:
01 Aug 2011
Unload:
03 Aug 2011
Astoria, OR, USA
Astoria, OR, USA
/
NP09
NP09
46N/130W
46N/130W
William W. Chadwick
14/18
Ancil Facs:
Other ROV
Project
PI/Institution
Project #
Days/Agency/Status
Monitoring inflation
William W. Chadwick
/
OSU_HMSC
0725605
6/NSF-OCE-MGG/F
High Rise Res
Marv Lilley
/
UW
0819004
5/NSF-OCE-MGG/F
VENTS
Robert W. Embley
/
PMEL
Not Specified
3/NOAA/F
Collaborative resear
Raymond W. Lee
/
WSU
0623554
3/NSF-OCE-BIO/F
Tongi U - Dr. Zhou
Not Specified
1/OTHER/F
PGPR at Axial
Mark A. Zumberge
/
SIO
ARRA 0851540
0/NSF-OCE-OTIC/F
Notes:
Aug 11: With Zumberge out of cruise - updated charge day allocations among CO-PI's. (BC6, ML 5, BE 3, RL 3, Zhou 1) 3 Lilley, 1 Zumberge (Glenn Sasagawa, gsasagawa@ucsd.edu is contact), 2 Lee, 2 Embley (Dave Butterfield will be PI on this), 3 Chadwick/ 11 science/ transit: 1 day Astoria to JDF, 2 days JdF to Astoria. 6/10: Zumberge droped out 2011 cruise. Increases charge time to other users.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
04 Aug 2011
Dep:
06 Aug 2011
Arr:
24 Aug 2011
Unload:
28 Aug 2011
Astoria, OR, USA
Astoria, OR, USA
/
0N/0E
0N/0E
Harlan P. Johnson
19/25
Project
PI/Institution
Project #
Days/Agency/Status
RAVEN
Harlan P. Johnson
/
UW
1037870
14/NSF-OCE-MGG/F
CORK-OTS
Maurice A. Tivey
/
WHOI
0926849
4/NSF-OCE-OTIC/F
HSOpticalComms
Norman Farr
/
WHOI
0942835
3/NSF-OCE-OTIC/F
HSOpticalComms
Norman Farr
/
WHOI
0942835
3/NSF-OCE-OTIC/F
2010 Jason Engineeri
Andrew D. Bowen
/
WHOI
Not Specified
1/NSF-OCE/F
JASON
Not Specified
0/OTHER/P
Notes:
8/31: Early Arrival into Astoria - 8/24 due to medical. Added 2 days onto demob (4 total). Includes 10 days for Johnson, 3 days funded for Tivey and 4 for Farr ( Farr has 2 in 2010, 2 in 2011), 1 Jason Eng dive/ 3 transit. total 18 ops days. 3 transit
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
29 Aug 2011
Dep:
31 Aug 2011
Arr:
08 Sep 2011
Unload:
10 Sep 2011
Astoria, OR, USA
San Francisco, CA, USA
/
0N/0E
0N/0E
Lisa A. Levin
9/13
Project
PI/Institution
Project #
Days/Agency/Status
Structure, Function
Lisa A. Levin
/
SIO
0826254
13/NSF-OCE-BIO/F
JASON
Not Specified
0/OTHER/P
Notes:
Orphan and Rathburn are also PIs on this cruise. Astoria to Hydrate: ~50-80nm. N Sta to San Fran (244nm, 1day) total transit 2 days plus 1 day arri.dpt: 3 days. 6 science days with Jason Late July early Aug. is fine with me. I anticipate being in Namibia/africa until either the end of June or mid July in 2011. We ideally need the cruise before mid Sept. when school starts and the weather is crappy (school may star earlier for Rathburn or Orphan).
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
11 Sep 2011
Dep:
13 Sep 2011
Arr:
29 Sep 2011
Unload:
01 Oct 2011
San Francisco, CA, USA
San Diego, CA, USA
/
0N/0E
0N/0E
David L. Valentine
17/21
Project
PI/Institution
Project #
Days/Agency/Status
Petroleum Weathering
David L. Valentine
/
UCSB
0961725
21/NSF-OCE-CO/F
JASON/Sentry
Not Specified
0/OTHER/P
Notes:
12 dives, 4 transit, 1 water making (2009 cruise: 12 dives, 3 transit, 1 water making) an additional transit day was added in 2011 to accommodate using Jason and navigating inshore tethered to the vehicle.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
02 Oct 2011
Dep:
04 Oct 2011
Arr:
28 Oct 2011
Unload:
29 Oct 2011
San Diego, CA, USA
Balboa, Panama
EPR 9N/
NP13
NP13
10N/104W
9N/104W
Scott L. Nooner
25/28
Ancil Facs:
Jason
Project
PI/Institution
Project #
Days/Agency/Status
EPR BPRs
Spahr C. Webb
/
LDEO
NSF 0426575
16/NSF-OCE-MGG/F
Establishing a lo
Scott L. Nooner
/
UNCW
0647840
11/NSF-OCE-MGG/F
2010 Jason Engineeri
Andrew D. Bowen
/
WHOI
Not Specified
1/NSF-OCE/F
JASON
Not Specified
0/OTHER/P
Notes:
10/18/11: Added 3 days to the October cruise. Oct 4 - 28. Oct 29 will be canal transit. EPR to San Diego 1578nm/5.9D 2 Days Nooner, 6 days Webb included days added for Recovery of stuck BPR's/Webb, 1 day eng dive. 1 day transit between stations, 2 days transit Manz to EPR, 6 days EPR to SD= 9 days transit. **NEW MARCH 29*** San Diego to station = 1544 nm to northern station = 5.8 days transit South Station to Panama (Balboa) = 1545nm = 6 day transit + 1 between stations = 13 transit days total.. 9 day science. Science disembark in Panama.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
30 Oct 2011
Dep:
30 Oct 2011
Arr:
21 Nov 2011
Unload:
21 Nov 2011
Balboa, Panama
Piraievs, Greece
/
0N/0E
0N/0E
Transit
23/23
Project
PI/Institution
Project #
Days/Agency/Status
Transit to Edgcomb
Not Specified
23/NSF-OCE-EDU/F
Notes:
11/22: Updated Atlantis arrival into Greece on Nov 21 (23 days transit) 10/27 = Canal transit - Cristobal to Piraeus = 5886nm = 22.3/22d + 1d = 23 days + 1 P Canal = 24 days
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
22 Nov 2011
Dep:
25 Nov 2011
Arr:
08 Dec 2011
Unload:
11 Dec 2011
Piraievs, Greece
Piraievs, Greece
/
0N/0E
0N/0E
14/20
Project
PI/Institution
Project #
Days/Agency/Status
Pickled Protists
Virginia P. Edgcomb
/
WHOI
0849578
15/NSF-OCE-BIO/F
Bodysnatchers
Joan M. Bernhard
/
WHOI
1061391
5/NSF-OCE-BIO/F
Notes:
12/12/11: Cruise finished on Dec 8 (one day early). Departure remains Dec 12. 11/22: added 1 more mob date (11/22) to cruise. J. Bernahard added onto cruise Jan 2011. 3 days sci. Cruise has been switched to Atlantis March 2011.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
12 Dec 2011
Dep:
12 Dec 2011
Arr:
31 Dec 2011
Unload:
31 Dec 2011
Piraievs, Greece
Port Everglades, FL, USA
/
0N/0E
0N/0E
Transit
20/20
Project
PI/Institution
Project #
Days/Agency/Status
Transit
Not Specified
20/NSF-OCE-EDU/F
Notes:
1/3/12: Changed arrival to Dec 31st. (old schedule had Jan 1 {21 day transit}). 9/29/11: Changed port stop to Port Everglades; transit 5353nm @ 11Kt = 20.3/20days + 1= 21 days total transit. Transit to Key West for Chris German/Jason ops cruise 5504nm = 21 + 1 =22 days transit 2011 op year count 12/15 - 12/31 = 17 days
Agency
Funded
Pending
Total
NOAA
3
0
3
NSF
215
0
215
OTHER
1
0
1
Total
219
0
219
<
<