Ship Time Request System
Search Public Records
Funded Projects
Funded Requests
Published Schedules
Search Funded Projects/Requests
All Ports
All Ancillary Facilities
UNOLS Equipment Inventory
All Ships
Help
Suggestions/Request Help
Frequently Asked Questions
Log In
View Schedule
or
schedule as:
Expanded (Text)
Condensed (Text)
Expanded (PDF)
Send schedule email to:
*
One or more invalid email addresses
Note for recipient(s):
the schedule as:
Excel XML
CSV
Google Earth Map (KML)
ICal Calendar
2014
-
Endeavor
Endeavor Final Schedule 2014
Final
- ID #
12091
Version #
3
-
1/6/2015
Scheduling Contact(s)
Thomas Glennon
thomas_glennon*%*%*uri^%^%^edu
(401) 465-3606
ash hayden
ash_hayden*%*%*uri^%^%^edu
(401) 874-6203
Notes:
5/31/13 - McCorkle and Montoya cruises withdrawn, Ward added.
6/6/13 - Added Oppo cruise.
6/11/13 - Removed Holland from TBD
6/21/13 - Removed Keith(NOAA) and both D'Asaro cruises
7/10/13 - Added Loose (NonOp)
7/13/13 - Added Tominaga (NonOp)
7/16/13 - Neuer and Joye withdrawn.
7/19/13 - Added Keith/NOAA ECOMON pending
7/27/13 - Added Plueddemann/NOAA moved Coleman to TBD Non-Op
8/9/13 - Removed two transits plus mob/de-mob days in Norfolk for Van Avendonk April cruise, now mob/de-mob GSO.
8/27/13 - Removed McCorkle, Ryerson, Carpenter. Moved Orr from early Sept to late Oct to accommodate Van Avendonk 32 day(including 4 wx days) cruise.
9/10/13 - Keith NOAA 16 day cruise withdrawn.
12/13/13 - Added start of Smith(NSF) cruise 12/29/14; finish in 2015 with Lumpkin(NOAA).
2/3/14 - Added Keigwin cruise after Oppo, removed 11 day dead-head transit
2/12/14 - Removed Keigwin and added 11 day dead-head back to GSO
4/12/14 - 1st Van Avendonk cruise ETA change from 4/16 to 4/14
4/14/14 - Moved Keigwin from 2015 LOI to 2014 Secure Schedule after Oppo
5/24/14 - Added Lohmann and Seibel RIEP cruises
6/2/14 - Added Roman RIEP cruise (no STR yet)
6/16/14 - Keigwin arrival day changed from 6/18 to 6/16
6/25/14 - As requested by PI, Plueddeman cruise now 19 days vs. 23. Moved mob from 11/29 to 12/3.
7/9/14 - Removed 1 additional day from Plueddeman, now 18 days.
7/30/14 - Added OOI Pioneer cruise 9 days
9/16/14 - Orr cruise (10/15-27/14) postponed to June 2015
11/17/14 - Canceled OOI cruise due to wx; Knorr to finish in Dec 2014
View Summary
Set Default
Associated Cruises
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
18 Dec 2013
Dep:
18 Dec 2013
Arr:
08 Mar 2014
Unload:
08 Mar 2014
Quonset Point, RI, USA
Quonset Point, RI, USA
/
NA06
NA06
41N/72W
41N/72W
Thomas Glennon
Maintenance
0/0
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Mar 2014
Dep:
14 Mar 2014
Arr:
28 Mar 2014
Unload:
28 Mar 2014
Narragansett, RI, USA
Narragansett, RI, USA
/
NA06
NA06
41N/72W
41N/72W
Thomas Glennon
Available for Service
0/0
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
31 Mar 2014
Dep:
01 Apr 2014
Arr:
14 Apr 2014
Unload:
15 Apr 2014
Quonset Point, RI, USA
Narragansett, RI, USA
/
NA06
NA06
41N/72W
41N/72W
Harm Van Avendonk
14/16
Project
PI/Institution
Project #
Days/Agency/Status
ENAM CSE
Harm Van Avendonk
/
UTIG
1249900
8/NSF-OCE-MGG/F
ENAM CSE
Harm Van Avendonk
/
UTIG
1249900
7/NSF-EAR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
28 Apr 2014
Dep:
29 Apr 2014
Arr:
22 May 2014
Unload:
23 May 2014
Narragansett, RI, USA
Reykjavik, Iceland
/
0N/0E
0N/0E
Bess B. Ward
24/26
Project
PI/Institution
Project #
Days/Agency/Status
Dimensions EukPhyto
Bess B. Ward
/
Princeton
1136345
25/NSF-OCE-BIO/F
Notes:
Mob in RI at GSO April 27-28(no op day); Depart April 29 = 1 op day; Transit 2334 nm to 1st site 47N/20W (April 30-8) at 10.5 knots = 9 op days; 7 days science + 4 transit between site 47N to 60N (May 9- 19) = 11 op days; Depart 60N/20W on May 20 = 1 op day; Transit from 60N to Reykjavik (May 21-22) = 2 op days; De-mob in Reykjavik May 23 = 1 op day; Total op days = 25
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
24 May 2014
Dep:
24 May 2014
Arr:
24 May 2014
Unload:
24 May 2014
Reykjavik, Iceland
Reykjavik, Iceland
/
0N/0E
0N/0E
Thomas Glennon
0/0
Project
PI/Institution
Project #
Days/Agency/Status
Notes:
Non- Op Day
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
25 May 2014
Dep:
26 May 2014
Arr:
02 Jun 2014
Unload:
03 Jun 2014
Reykjavik, Iceland
Reykjavik, Iceland
/
0N/0E
0N/0E
Delia W. Oppo
8/10
Project
PI/Institution
Project #
Days/Agency/Status
I-S Overflow
Delia W. Oppo
/
WHOI
1304291
10/NSF-OCE/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
04 Jun 2014
Dep:
04 Jun 2014
Arr:
16 Jun 2014
Unload:
19 Jun 2014
Reykjavik, Iceland
Narragansett, RI, USA
/
0N/0E
0N/0E
Lloyd D. Keigwin
13/14
Project
PI/Institution
Project #
Days/Agency/Status
NAO 3k
Lloyd D. Keigwin
/
WHOI
1405160
13/NSF-OCE-MGG/F
Notes:
No science crew change out and no gear to unload/load on front end, therefore no mob day needed in Iceland. One day (arrival day) at each site surveying and coring = 14 total operating days. This would add only an additional 3 days to our previously scheduled 11 day dead-head transit from Iceland to GSO.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
23 Jun 2014
Dep:
23 Jun 2014
Arr:
06 Jul 2014
Unload:
06 Jul 2014
Narragansett, RI, USA
Narragansett, RI, USA
/
0N/0E
0N/0E
Thomas Glennon
Available for Service
0/0
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
07 Jul 2014
Dep:
08 Jul 2014
Arr:
13 Jul 2014
Unload:
14 Jul 2014
Narragansett, RI, USA
Narragansett, RI, USA
Nantucket canyo/
NA06
NA06
40N/68W
39N/72W
John D. Kessler
6/8
Ancil Facs:
Radioisotope Lab Van
Project
PI/Institution
Project #
Days/Agency/Status
methane oxidation
John D. Kessler
/
U of R
1154040
6/NSF-OCE-CO/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
17 Jul 2014
Dep:
18 Jul 2014
Arr:
06 Aug 2014
Unload:
07 Aug 2014
Narragansett, RI, USA
Narragansett, RI, USA
west atlantic/
NA06
NA06
41N/70W
36N/76W
Michael J. Behrenfeld
20/22
Project
PI/Institution
Project #
Days/Agency/Status
NASA bio-optics
Michael J. Behrenfeld
/
OSU_Oregon State
Not Specified
20/NASA/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
13 Aug 2014
Dep:
13 Aug 2014
Arr:
18 Aug 2014
Unload:
18 Aug 2014
Narragansett, RI, USA
Narragansett, RI, USA
/
0N/0E
0N/0E
Brad A. Seibel
6/8
Project
PI/Institution
Project #
Days/Agency/Status
Brad A. Seibel
/
USF_Tampa
Not Specified
6/INST-URI-GSO/F
Pelagic Ecology Cour
Brad A. Seibel
/
USF_Tampa
Not Specified
0/OTHER/T
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
20 Aug 2014
Dep:
21 Aug 2014
Arr:
21 Aug 2014
Unload:
22 Aug 2014
Narragansett, RI, USA
Narragansett, RI, USA
/
NA06
NA06
41N/71W
41N/71W
Rose M. Dufour
NSF Inspec
0/2
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
22 Aug 2014
Dep:
23 Aug 2014
Arr:
28 Aug 2014
Unload:
29 Aug 2014
Narragansett, RI, USA
Narragansett, RI, USA
/
NA06
NA06
41N/71W
41N/71W
Rainer Lohmann
6/8
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Not Specified
6/INST-URI-GSO/F
Estuarine C export
Rainer Lohmann
/
URI_GSO
Not Specified
0/OTHER/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
10 Sep 2014
Dep:
12 Sep 2014
Arr:
10 Oct 2014
Unload:
12 Oct 2014
Quonset Point, RI, USA
Quonset Point, RI, USA
Mid-Atlantic US/
NA06
NA06
41N/71W
41N/71W
Harm Van Avendonk
29/33
Clearances:
NONE(T)
Ancil Facs:
Ocean Bottom Seismograph Instrument Pool (OBSIP)
Project
PI/Institution
Project #
Days/Agency/Status
ENAM CSE
Harm Van Avendonk
/
UTIG
1249900
17/NSF-OCE-MGG/F
ENAM CSE
Harm Van Avendonk
/
UTIG
1249900
16/NSF-EAR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
30 Oct 2014
Dep:
31 Oct 2014
Arr:
05 Nov 2014
Unload:
06 Nov 2014
Narragansett, RI, USA
Narragansett, RI, USA
/
NA06
NA06
41N/71W
41N/71W
Christopher Roman
6/8
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Not Specified
6/INST-URI-GSO/F
CR October Cruise
Christopher Roman
/
URI_GSO
Not Specified
0/INST/F
Notes:
This cruise is funded by the RIEP .
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
07 Nov 2014
Dep:
07 Nov 2014
Arr:
13 Nov 2014
Unload:
13 Nov 2014
Narragansett, RI, USA
Narragansett, RI, USA
/
NA06
NA06
41N/71W
41N/71W
Thomas Glennon
Shipyard
0/0
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Notes:
Renew Radars
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
23 Nov 2014
Dep:
23 Nov 2014
Arr:
03 Dec 2014
Unload:
03 Dec 2014
Narragansett, RI, USA
/
NA06
NA06
41N/71W
41N/71W
Thomas Glennon
Maintenance
0/0
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Notes:
Main Engine maintenance and regulatory inspections.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
04 Dec 2014
Dep:
05 Dec 2014
Arr:
21 Dec 2014
Unload:
22 Dec 2014
Narragansett, RI, USA
Bridgetown, Barbados
/
0N/0E
0N/0E
Al Plueddemann
17/19
Project
PI/Institution
Project #
Days/Agency/Status
NTAS/MOVE
Al Plueddemann
/
WHOI
NA09OAR4320129
18/NOAA/F
Notes:
Narragansett to first site 12N/50W is 2130 nm at 10.5 knots = 8 days 8 hrs.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
23 Dec 2014
Dep:
23 Dec 2014
Arr:
28 Dec 2014
Unload:
28 Dec 2014
Bridgetown, Barbados
Bridgetown, Barbados
/
NA06
NA06
41N/72W
41N/72W
Bruce Corliss
Maintenance
0/0
Project
PI/Institution
Project #
Days/Agency/Status
Not Specified
0/INST/P
Notes:
Institutional funds to cover the difference in costs (additional berth days, OT for crew, security watches, etc.) for 6 “port days”.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
28 Dec 2014
Dep:
29 Dec 2014
Arr:
13 Feb 2015
Unload:
14 Feb 2015
Bridgetown, Barbados
San Juan, Puerto Rico
/
NA09
NA09
13N/60W
18N/66W
Deborah Smith
3/4
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Equatorial MAR
Deborah Smith
/
NSF
1062165
4/NSF-EAR/F
Notes:
This cruise (Smith/NSF - 22 days) will be combined with a NOAA cruise (Lumpkin/NOAA - 25 days) for a total of 47 operating days. After a port stop mid-way (1/12-15/15) in Cape Verde, both cruises de-mob San Juan 2/12/15.
Agency
Funded
Pending
Total
INST
18
0
18
NASA
20
0
20
NOAA
18
0
18
NSF
106
0
106
OTHER
0
0
0
Total
162
0
162
<
<