View Schedule

or schedule as:
the schedule as:
  2014 - Endeavor  
Endeavor Final Schedule 2014
Final - ID #12091    Version #3 - 1/6/2015

Scheduling Contact(s)
Thomas Glennon thomas_glennon*%*%*uri^%^%^edu (401) 465-3606
ash hayden ash_hayden*%*%*uri^%^%^edu (401) 874-6203

  Notes:   5/31/13 - McCorkle and Montoya cruises withdrawn, Ward added.
6/6/13 - Added Oppo cruise.
6/11/13 - Removed Holland from TBD
6/21/13 - Removed Keith(NOAA) and both D'Asaro cruises
7/10/13 - Added Loose (NonOp)
7/13/13 - Added Tominaga (NonOp)
7/16/13 - Neuer and Joye withdrawn.
7/19/13 - Added Keith/NOAA ECOMON pending
7/27/13 - Added Plueddemann/NOAA moved Coleman to TBD Non-Op
8/9/13 - Removed two transits plus mob/de-mob days in Norfolk for Van Avendonk April cruise, now mob/de-mob GSO.
8/27/13 - Removed McCorkle, Ryerson, Carpenter. Moved Orr from early Sept to late Oct to accommodate Van Avendonk 32 day(including 4 wx days) cruise.
9/10/13 - Keith NOAA 16 day cruise withdrawn.
12/13/13 - Added start of Smith(NSF) cruise 12/29/14; finish in 2015 with Lumpkin(NOAA).
2/3/14 - Added Keigwin cruise after Oppo, removed 11 day dead-head transit
2/12/14 - Removed Keigwin and added 11 day dead-head back to GSO
4/12/14 - 1st Van Avendonk cruise ETA change from 4/16 to 4/14
4/14/14 - Moved Keigwin from 2015 LOI to 2014 Secure Schedule after Oppo
5/24/14 - Added Lohmann and Seibel RIEP cruises
6/2/14 - Added Roman RIEP cruise (no STR yet)
6/16/14 - Keigwin arrival day changed from 6/18 to 6/16
6/25/14 - As requested by PI, Plueddeman cruise now 19 days vs. 23. Moved mob from 11/29 to 12/3.
7/9/14 - Removed 1 additional day from Plueddeman, now 18 days.
7/30/14 - Added OOI Pioneer cruise 9 days
9/16/14 - Orr cruise (10/15-27/14) postponed to June 2015
11/17/14 - Canceled OOI cruise due to wx; Knorr to finish in Dec 2014
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:18 Dec 2013
Dep:18 Dec 2013
Arr:08 Mar 2014
Unload:08 Mar 2014
 
Quonset Point, RI, USA
Quonset Point, RI, USA
 
 /
NA06
NA06
 
 
 
41N/72W
41N/72W
 
  Thomas Glennon
Maintenance
  0/0
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:14 Mar 2014
Dep:14 Mar 2014
Arr:28 Mar 2014
Unload:28 Mar 2014
 
Narragansett, RI, USA
Narragansett, RI, USA
 
 /
NA06
NA06
 
 
 
41N/72W
41N/72W
 
  Thomas Glennon
Available for Service
  0/0
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:31 Mar 2014
Dep:01 Apr 2014
Arr:14 Apr 2014
Unload:15 Apr 2014
 
Quonset Point, RI, USA
Narragansett, RI, USA
 
 /
NA06
NA06
 
 
 
41N/72W
41N/72W
 
  Harm Van Avendonk
  14/16
 
Project PI/Institution Project # Days/Agency/Status
ENAM CSE Harm Van Avendonk/UTIG 1249900 8/NSF-OCE-MGG/F
ENAM CSE Harm Van Avendonk/UTIG 1249900 7/NSF-EAR/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:28 Apr 2014
Dep:29 Apr 2014
Arr:22 May 2014
Unload:23 May 2014
 
Narragansett, RI, USA
Reykjavik, Iceland
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
  Bess B. Ward
  24/26
 
Project PI/Institution Project # Days/Agency/Status
Dimensions EukPhyto Bess B. Ward/Princeton 1136345 25/NSF-OCE-BIO/F
 
Notes: Mob in RI at GSO April 27-28(no op day); Depart April 29 = 1 op day; Transit 2334 nm to 1st site 47N/20W (April 30-8) at 10.5 knots = 9 op days; 7 days science + 4 transit between site 47N to 60N (May 9- 19) = 11 op days; Depart 60N/20W on May 20 = 1 op day; Transit from 60N to Reykjavik (May 21-22) = 2 op days; De-mob in Reykjavik May 23 = 1 op day; Total op days = 25

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:24 May 2014
Dep:24 May 2014
Arr:24 May 2014
Unload:24 May 2014
 
Reykjavik, Iceland
Reykjavik, Iceland
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
  Thomas Glennon
  0/0
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Non- Op Day

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:25 May 2014
Dep:26 May 2014
Arr:02 Jun 2014
Unload:03 Jun 2014
 
Reykjavik, Iceland
Reykjavik, Iceland
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
  Delia W. Oppo
  8/10
 
Project PI/Institution Project # Days/Agency/Status
I-S Overflow Delia W. Oppo/WHOI 1304291 10/NSF-OCE/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:04 Jun 2014
Dep:04 Jun 2014
Arr:16 Jun 2014
Unload:19 Jun 2014
 
Reykjavik, Iceland
Narragansett, RI, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
  Lloyd D. Keigwin
  13/14
 
Project PI/Institution Project # Days/Agency/Status
NAO 3k Lloyd D. Keigwin/WHOI 1405160 13/NSF-OCE-MGG/F
 
Notes: No science crew change out and no gear to unload/load on front end, therefore no mob day needed in Iceland. One day (arrival day) at each site surveying and coring = 14 total operating days. This would add only an additional 3 days to our previously scheduled 11 day dead-head transit from Iceland to GSO.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:23 Jun 2014
Dep:23 Jun 2014
Arr:06 Jul 2014
Unload:06 Jul 2014
 
Narragansett, RI, USA
Narragansett, RI, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
  Thomas Glennon
Available for Service
  0/0
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Jul 2014
Dep:08 Jul 2014
Arr:13 Jul 2014
Unload:14 Jul 2014
 
Narragansett, RI, USA
Narragansett, RI, USA
 
Nantucket canyo/
NA06
NA06
 
 
 
40N/68W
39N/72W
 
  John D. Kessler
  6/8

Ancil Facs: Radioisotope Lab Van
 
Project PI/Institution Project # Days/Agency/Status
methane oxidation John D. Kessler/U of R 1154040 6/NSF-OCE-CO/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Jul 2014
Dep:18 Jul 2014
Arr:06 Aug 2014
Unload:07 Aug 2014
 
Narragansett, RI, USA
Narragansett, RI, USA
 
west atlantic/
NA06
NA06
 
 
 
41N/70W
36N/76W
 
  Michael J. Behrenfeld
  20/22
 
Project PI/Institution Project # Days/Agency/Status
NASA bio-optics Michael J. Behrenfeld/OSU_Oregon State Not Specified 20/NASA/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:13 Aug 2014
Dep:13 Aug 2014
Arr:18 Aug 2014
Unload:18 Aug 2014
 
Narragansett, RI, USA
Narragansett, RI, USA
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
  Brad A. Seibel
  6/8
 
Project PI/Institution Project # Days/Agency/Status
Brad A. Seibel/USF_Tampa Not Specified 6/INST-URI-GSO/F
Pelagic Ecology Cour Brad A. Seibel/USF_Tampa Not Specified 0/OTHER/T

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 Aug 2014
Dep:21 Aug 2014
Arr:21 Aug 2014
Unload:22 Aug 2014
 
Narragansett, RI, USA
Narragansett, RI, USA
 
 /
NA06
NA06
 
 
 
41N/71W
41N/71W
 
  Rose M. Dufour
NSF Inspec
  0/2

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:22 Aug 2014
Dep:23 Aug 2014
Arr:28 Aug 2014
Unload:29 Aug 2014
 
Narragansett, RI, USA
Narragansett, RI, USA
 
 /
NA06
NA06
 
 
 
41N/71W
41N/71W
 
  Rainer Lohmann
  6/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 6/INST-URI-GSO/F
Estuarine C export Rainer Lohmann/URI_GSO Not Specified 0/OTHER/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:10 Sep 2014
Dep:12 Sep 2014
Arr:10 Oct 2014
Unload:12 Oct 2014
 
Quonset Point, RI, USA
Quonset Point, RI, USA
 
Mid-Atlantic US/
NA06
NA06
 
 
 
41N/71W
41N/71W
 
  Harm Van Avendonk
  29/33

Clearances: NONE(T)

Ancil Facs: Ocean Bottom Seismograph Instrument Pool (OBSIP)
 
Project PI/Institution Project # Days/Agency/Status
ENAM CSE Harm Van Avendonk/UTIG 1249900 17/NSF-OCE-MGG/F
ENAM CSE Harm Van Avendonk/UTIG 1249900 16/NSF-EAR/F

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Oct 2014
Dep:31 Oct 2014
Arr:05 Nov 2014
Unload:06 Nov 2014
 
Narragansett, RI, USA
Narragansett, RI, USA
 
 /
NA06
NA06
 
 
 
41N/71W
41N/71W
 
  Christopher Roman
  6/8

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 6/INST-URI-GSO/F
CR October Cruise Christopher Roman/URI_GSO Not Specified 0/INST/F
 
Notes: This cruise is funded by the RIEP .

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Nov 2014
Dep:07 Nov 2014
Arr:13 Nov 2014
Unload:13 Nov 2014
 
Narragansett, RI, USA
Narragansett, RI, USA
 
 /
NA06
NA06
 
 
 
41N/71W
41N/71W
 
  Thomas Glennon
Shipyard
  0/0

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Renew Radars

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:23 Nov 2014
Dep:23 Nov 2014
Arr:03 Dec 2014
Unload:03 Dec 2014
 
 
Narragansett, RI, USA
 
 /
NA06
NA06
 
 
 
41N/71W
41N/71W
 
  Thomas Glennon
Maintenance
  0/0

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Main Engine maintenance and regulatory inspections.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:04 Dec 2014
Dep:05 Dec 2014
Arr:21 Dec 2014
Unload:22 Dec 2014
 
Narragansett, RI, USA
Bridgetown, Barbados
 
 /
 
 
 
 
 
0N/0E
0N/0E
 
  Al Plueddemann
  17/19
 
Project PI/Institution Project # Days/Agency/Status
NTAS/MOVE Al Plueddemann/WHOI NA09OAR4320129 18/NOAA/F
 
Notes: Narragansett to first site 12N/50W is 2130 nm at 10.5 knots = 8 days 8 hrs.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:23 Dec 2014
Dep:23 Dec 2014
Arr:28 Dec 2014
Unload:28 Dec 2014
 
Bridgetown, Barbados
Bridgetown, Barbados
 
 /
NA06
NA06
 
 
 
41N/72W
41N/72W
 
  Bruce Corliss
Maintenance
  0/0
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 0/INST/P
 
Notes: Institutional funds to cover the difference in costs (additional berth days, OT for crew, security watches, etc.) for 6 “port days”.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:28 Dec 2014
Dep:29 Dec 2014
Arr:13 Feb 2015
Unload:14 Feb 2015
 
Bridgetown, Barbados
San Juan, Puerto Rico
 
 /
NA09
NA09
 
 
 
13N/60W
18N/66W
 
  Deborah Smith
  3/4

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Equatorial MAR Deborah Smith/NSF 1062165 4/NSF-EAR/F
 
Notes: This cruise (Smith/NSF - 22 days) will be combined with a NOAA cruise (Lumpkin/NOAA - 25 days) for a total of 47 operating days. After a port stop mid-way (1/12-15/15) in Cape Verde, both cruises de-mob San Juan 2/12/15.
Agency   Funded   Pending   Total
INST   18   0   18
NASA   20   0   20
NOAA   18   0   18
NSF   106   0   106
OTHER   0   0   0
Total  162 0 162
<
<