Ship Time Request System
Search Public Records
Funded Projects
Funded Requests
Published Schedules
Search Funded Projects/Requests
All Ports
All Ancillary Facilities
UNOLS Equipment Inventory
All Ships
Help
Suggestions/Request Help
Frequently Asked Questions
Log In
View Schedule
or
schedule as:
Expanded (Text)
Condensed (Text)
Expanded (PDF)
Send schedule email to:
*
One or more invalid email addresses
Note for recipient(s):
the schedule as:
Excel XML
CSV
Google Earth Map (KML)
ICal Calendar
2018
-
Robert Gordon Sproul
Final
- ID #
13537
Version #
4
-
6/19/2019
Scheduling Contact(s)
Hannah Delapp
shipsked*%*%*ucsd^%^%^edu
(858) 534-2841
Notes:
11/3/17Added 3 days for M. Alford
added one additional day for T. Rathburn
11/21/17 Carry forward one Terrill and three Jaffe ONR funded days from 2017.
Removed three Alford/ONR days. Converted into two days to be combined with SR UC funded cruise.
12/7 Added two cruises for Kresge, JHU-APL and one cruise for J. Warrick BOEM funding.
12/11 Reduce total number of days allocated for Kresge.
12/18 Add a day for Andy Adamez/Trident Research
12/21 Reduce Baumann-Pickering's January cruise by 2 days and reschedule to a later day in January.
1/12 Parse out Hamme/Rauhauser cruise to daily operations.
1/22 Edit Kresge cruises.
1/23 Delay January Baumann-Pickering cruise by two days and replace chief scientist.
1/30 Scheduled UC Funded cruises for Hastings, Rouse,Taylor, Gallimore, Pagniello and
Doran. Baumann Pickering delayed her cruises from January to March and May to July.
2/7 Due to US Department of State direction to the Navy to delay testing for approximately 5 weeks, the Kresge and Adamez cruises have been delayed. The cruises may be rescheduled if time is available.TBD
2/8 Shipyard will be moved to November/December. Re-scheduled Kresge. Scheduled Levin/Allen, advance Pagniello.
Added Terrill days to Gallimore. Reduce Rauhauser by one day. Scheduled second Gray/Rathburn cruise.
2/23 Removed Warrick/BOEM cruise.
3/9 Increase U Send's April recovery cruise to three days.
3/19 Add maintenance days in Mar/Apr for STS
3/26 A 28-day maintenance period has been added in August.
4/10 Defer Camile Pagniello's May cruise, will be rescheduled in September.
4/27 Schedule Jaffe cruises in July, re-schedule Allen/Levin class cruises, add SPAWAR cruises in September. Add Lucas cruise in November.
5/21 delay Gallimore by one day, shift Constable to the weekend 16-17 June
6/11 Advanced Doran July cruise by one day.
6/27 UC Ships funded a second day for Greg Rouse
7/5 Delay Baumann's cruise by one day due to weather.
7/12 Cancelled three cruises for SPAWAR/Rauhauser. The science program had delays, could not accommodate slip due to scheduled shipyard period.
7/23 G. Rouse's class cruise 7/22 was canceled due to trawl winch problems.
7/25 Edited schedule to reflect actual mob/demob and accurate "standby days".
7/26 Added two days for UC Ship funded class SIO136 Semmens in October. Rescheduled G. Rouse's class cruise to 2 September.
9/20 Scheduled a cruise, Sophia Merrifield with Terrill's existing non-scheduled funding.
10/17 Edit Jaffe ONR funding, add a day for Jaffe/Lucas in November
12/11 Carried forward 5 days for E. Terrill-Expeditionary into 2019
View Summary
Set Default
Associated Cruises
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
01 Jan 2018
Dep:
01 Jan 2018
Arr:
25 Feb 2018
Unload:
25 Feb 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
56/56
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
26 Feb 2018
Dep:
26 Feb 2018
Arr:
26 Feb 2018
Unload:
26 Feb 2018
San Diego, CA, USA
San Diego, CA, USA
Imperial Beach/
NP09
NP09
33N/117W
33N/117W
Ernest Rauhauser
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
AUWS
Not Specified
1/NAVY-ONR-OAS/F
AUWS
Lonnie Hamme
/
SPAWAR
Not Specified
0/NAVY/F
Notes:
Program manager is Emily Medina Code 32 Funds will be transfer to Tim Schnoor.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
27 Feb 2018
Dep:
27 Feb 2018
Arr:
27 Feb 2018
Unload:
27 Feb 2018
San Diego, CA, USA
San Diego, CA, USA
Imperial Beach/
NP09
NP09
33N/117W
33N/117W
Ernest Rauhauser
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
AUWS
Not Specified
1/NAVY-ONR-OAS/F
AUWS
Lonnie Hamme
/
SPAWAR
Not Specified
0/NAVY/F
Notes:
Program manager is Emily Medina Code 32 Funds will be transfer to Tim Schnoor.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
28 Feb 2018
Dep:
28 Feb 2018
Arr:
28 Feb 2018
Unload:
28 Feb 2018
San Diego, CA, USA
San Diego, CA, USA
Imperial Beach/
NP09
NP09
33N/117W
33N/117W
Ernest Rauhauser
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
AUWS
Not Specified
1/NAVY-ONR-OAS/F
AUWS
Lonnie Hamme
/
SPAWAR
Not Specified
0/NAVY/F
Notes:
Program manager is Emily Medina Code 32 Funds will be transfer to Tim Schnoor.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
01 Mar 2018
Dep:
01 Mar 2018
Arr:
01 Mar 2018
Unload:
01 Mar 2018
San Diego, CA, USA
San Diego, CA, USA
Imperial Beach/
NP09
NP09
33N/117W
33N/117W
Ernest Rauhauser
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
AUWS
Not Specified
1/NAVY-ONR-OAS/F
AUWS
Lonnie Hamme
/
SPAWAR
Not Specified
0/NAVY/F
Notes:
Program manager is Emily Medina Code 32 Funds will be transfer to Tim Schnoor.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
02 Mar 2018
Dep:
02 Mar 2018
Arr:
02 Mar 2018
Unload:
03 Mar 2018
San Diego, CA, USA
San Diego, CA, USA
Imperial Beach/
NP09
NP09
33N/117W
33N/117W
Ernest Rauhauser
1/2
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
AUWS
Not Specified
1/NAVY-ONR-OAS/F
AUWS
Lonnie Hamme
/
SPAWAR
Not Specified
0/NAVY/F
Notes:
Program manager is Emily Medina Code 32 Funds will be transfer to Tim Schnoor.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
04 Mar 2018
Dep:
04 Mar 2018
Arr:
08 Mar 2018
Unload:
08 Mar 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
5/5
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
09 Mar 2018
Dep:
10 Mar 2018
Arr:
10 Mar 2018
Unload:
11 Mar 2018
San Diego, CA, USA
San Diego, CA, USA
off San Diego/
NP09
NP09
33N/117W
33N/118W
Philip Hastings
1/3
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Biology of Fishes
Philip Hastings
/
SIO
Not Specified
1/INST-UCSD-SIO/F
Notes:
Class cruise-weekend only. Alternate date 2/24
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
12 Mar 2018
Dep:
13 Mar 2018
Arr:
16 Mar 2018
Unload:
17 Mar 2018
San Diego, CA, USA
San Diego, CA, USA
CCE mooring/
NP09
NP09
33N/117W
33N/117W
Simone Baumann-Pickering
4/6
Clearances:
US EEZ(T)
Ancil Facs:
Portable Winch
Project
PI/Institution
Project #
Days/Agency/Status
DSL & Cetaceans
Simone Baumann-Pickering
/
SIO
Not Specified
3/NAVY-ONR/F
Notes:
Carry forward from 2017 1800 departure/arrival Early arrival, carry forward one day to July cruise. R/V Robert G. Sproul operates on a 24 hour day, therefore sea days and charge days (Op days) may not be the same.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
18 Mar 2018
Dep:
18 Mar 2018
Arr:
20 Mar 2018
Unload:
20 Mar 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
3/3
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
21 Mar 2018
Dep:
21 Mar 2018
Arr:
21 Mar 2018
Unload:
21 Mar 2018
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
33N/117W
33N/117W
James Kresge
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
JHU/APL Wave Glider
James Kresge
/
JHU/APL
PP394
1/NAVY/F
Notes:
JHU has issued a PO. Was scheduled for 2/8
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
22 Mar 2018
Dep:
22 Mar 2018
Arr:
26 Mar 2018
Unload:
26 Mar 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
5/5
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
27 Mar 2018
Dep:
27 Mar 2018
Arr:
29 Mar 2018
Unload:
29 Mar 2018
San Diego, CA, USA
San Diego, CA, USA
homeport/
NP09
NP09
33N/117W
33N/117W
Lee Ellett
Maintenance
3/3
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
30 Mar 2018
Dep:
30 Mar 2018
Arr:
30 Mar 2018
Unload:
30 Mar 2018
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
33N/117W
33N/117W
James Kresge
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
JHU/APL Wave Glider
James Kresge
/
JHU/APL
PP394
1/NAVY/F
Notes:
JHU has issued a PO. Was scheduled for 2/20
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
31 Mar 2018
Dep:
31 Mar 2018
Arr:
12 Apr 2018
Unload:
12 Apr 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Lee Ellett
Maintenance
13/13
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
13 Apr 2018
Dep:
13 Apr 2018
Arr:
13 Apr 2018
Unload:
13 Apr 2018
San Diego, CA, USA
San Diego, CA, USA
Off Del Mar, CA/
NP09
NP09
33N/117W
33N/117W
Uwe Send
0/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Del Mar mooring (R)
Uwe Send
/
SIO
Not Specified
0/INST-UCSD-SIO/F
Notes:
Load out on the 13th, 14-15 Lay days.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Apr 2018
Dep:
14 Apr 2018
Arr:
15 Apr 2018
Unload:
15 Apr 2018
San Diego, CA, USA
San Diego, CA, USA
Off Del Mar, CA/
NP09
NP09
33N/117W
33N/117W
Uwe Send
Standby Days
2/2
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Del Mar mooring (R)
Uwe Send
/
SIO
Not Specified
0/INST-UCSD-SIO/NonOp
Notes:
Load out on the 13th, 14-15 Lay days.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
16 Apr 2018
Dep:
16 Apr 2018
Arr:
19 Apr 2018
Unload:
20 Apr 2018
San Diego, CA, USA
San Diego, CA, USA
Off Del Mar, CA/
NP09
NP09
33N/117W
33N/117W
Uwe Send
4/5
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Del Mar mooring (R)
Uwe Send
/
SIO
Not Specified
3/INST-UCSD-SIO/F
Notes:
Load out on the 13th, 14-15 Lay days. R/V Robert G. Sproul operates on a 24 hour day, therefore sea days and charge days (Op days) may not be the same.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
21 Apr 2018
Dep:
21 Apr 2018
Arr:
26 Apr 2018
Unload:
26 Apr 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
6/6
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
27 Apr 2018
Dep:
27 Apr 2018
Arr:
27 Apr 2018
Unload:
27 Apr 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Outreach
1/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
28 Apr 2018
Dep:
28 Apr 2018
Arr:
29 Apr 2018
Unload:
29 Apr 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
2/2
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
30 Apr 2018
Dep:
02 May 2018
Arr:
08 May 2018
Unload:
08 May 2018
San Diego, CA, USA
San Diego, CA, USA
Santa Barbara/
NP09
NP09
34N/120W
34N/120W
Joan M. Bernhard
7/9
Clearances:
US EEZ(T)
Ancil Facs:
Cold Lab Van
Project
PI/Institution
Project #
Days/Agency/Status
Foram hypoxia
Joan M. Bernhard
/
WHOI
1557430
6/NSF-BIO-IOS/F
Notes:
R/V Robert G. Sproul operates on a 24 hour day, therefore sea days and charge days (Op days) may not be the same.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
09 May 2018
Dep:
09 May 2018
Arr:
10 May 2018
Unload:
10 May 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
2/2
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
11 May 2018
Dep:
12 May 2018
Arr:
12 May 2018
Unload:
13 May 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego Troug/
NP09
NP09
33N/118W
33N/118W
Jennifer Taylor
1/3
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Biomechanics cruise
Jennifer Taylor
/
SIO
Not Specified
1/INST-UCSD-SIO/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 May 2018
Dep:
15 May 2018
Arr:
16 May 2018
Unload:
16 May 2018
San Diego, CA, USA
San Diego, CA, USA
Off Del Mar, CA/
NP09
NP09
33N/117W
33N/117W
Matthias Lankhorst
2/3
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Del Mar mooring (D)
Uwe Send
/
SIO
Not Specified
1/INST-UCSD-SIO/F
Notes:
R/V Robert G. Sproul operates on a 24 hour day, therefore sea days and charge days (Op days) may not be the same.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
17 May 2018
Dep:
17 May 2018
Arr:
29 May 2018
Unload:
29 May 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
13/13
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
30 May 2018
Dep:
30 May 2018
Arr:
06 Jun 2018
Unload:
07 Jun 2018
San Diego, CA, USA
San Diego, CA, USA
Near Del Mar/
NP09
NP09
33N/117W
33N/117W
Eric Gallimore
8/9
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
AUV Mag Autonomy
Eric Gallimore
/
WHOI
UC Ship Funds
4/INST-UCSD-SIO/F
Expeditionary
Eric Terrill
/
SIO
N00014-12-G-0136 / 0012
2/NAVY-ONR/F
Optics
Eric Terrill
/
SIO
N00014-14-1-0060
1/NAVY-ONR-OAS/F
Notes:
R/V Robert G. Sproul operates on a 24 hour day, therefore sea days and charge days (Op days) may not be the same.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
08 Jun 2018
Dep:
08 Jun 2018
Arr:
13 Jun 2018
Unload:
13 Jun 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
6/6
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Jun 2018
Dep:
16 Jun 2018
Arr:
17 Jun 2018
Unload:
17 Jun 2018
San Diego, CA, USA
San Diego, CA, USA
Del Mar Seep/
NP09
NP09
33N/118W
33N/118W
Steven Constable
2/4
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
DUESI tests
Steven Constable
/
SIO
Not Specified
2/OTHER/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
18 Jun 2018
Dep:
18 Jun 2018
Arr:
20 Jun 2018
Unload:
20 Jun 2018
San Diego, CA, USA
San Diego, CA, USA
Offshore SCF/
NP09
NP09
33N/119W
33N/119W
Adrian Doran
3/3
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
CABOOSE
Adrian Doran
/
UCSD
Not Specified
2/INST-UCSD-SIO/F
Notes:
R/V Robert G. Sproul operates on a 24 hour day, therefore sea days and charge days (Op days) may not be the same.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
21 Jun 2018
Dep:
21 Jun 2018
Arr:
01 Jul 2018
Unload:
01 Jul 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
11/11
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
02 Jul 2018
Dep:
02 Jul 2018
Arr:
02 Jul 2018
Unload:
02 Jul 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Outreach
1/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
03 Jul 2018
Dep:
03 Jul 2018
Arr:
04 Jul 2018
Unload:
04 Jul 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
2/2
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
05 Jul 2018
Dep:
05 Jul 2018
Arr:
06 Jul 2018
Unload:
06 Jul 2018
San Diego, CA, USA
San Diego, CA, USA
CCE mooring/
NP09
NP09
33N/117W
33N/117W
Simone Baumann-Pickering
0/2
Clearances:
NONE(T)
Ancil Facs:
Portable Winch
Project
PI/Institution
Project #
Days/Agency/Status
DSL & Cetaceans
Simone Baumann-Pickering
/
SIO
Not Specified
0/NAVY-ONR/F
Notes:
Load out days
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
07 Jul 2018
Dep:
07 Jul 2018
Arr:
07 Jul 2018
Unload:
07 Jul 2018
San Diego, CA, USA
San Diego, CA, USA
CCE mooring/
NP09
NP09
33N/117W
33N/117W
Simone Baumann-Pickering
Standby Days
1/1
Clearances:
NONE(T)
Ancil Facs:
Portable Winch
Project
PI/Institution
Project #
Days/Agency/Status
DSL & Cetaceans
Simone Baumann-Pickering
/
SIO
Not Specified
0/NAVY-ONR/NonOp
Notes:
Delayed saiing due to weather concerns.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
08 Jul 2018
Dep:
08 Jul 2018
Arr:
12 Jul 2018
Unload:
12 Jul 2018
San Diego, CA, USA
San Diego, CA, USA
CCE mooring/
NP09
NP09
33N/117W
33N/117W
Simone Baumann-Pickering
5/5
Clearances:
US EEZ(T)
Ancil Facs:
Portable Winch
Project
PI/Institution
Project #
Days/Agency/Status
DSL & Cetaceans
Simone Baumann-Pickering
/
SIO
Not Specified
4/NAVY-ONR/F
Notes:
Carry forward from 2017 R/V Robert G. Sproul operates on a 24 hour day, therefore sea days and charge days (Op days) may not be the same.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
13 Jul 2018
Dep:
13 Jul 2018
Arr:
15 Jul 2018
Unload:
15 Jul 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
3/3
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
16 Jul 2018
Dep:
17 Jul 2018
Arr:
17 Jul 2018
Unload:
17 Jul 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Jules S. Jaffe
1/2
Clearances:
US EEZ(T)
Ancil Facs:
Other AUV
Project
PI/Institution
Project #
Days/Agency/Status
Laser Line Scan
Jules S. Jaffe
/
SIO
Not Specified
1/NAVY-ONR/F
Notes:
Student cruise.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
18 Jul 2018
Dep:
18 Jul 2018
Arr:
18 Jul 2018
Unload:
19 Jul 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Jules S. Jaffe
1/2
Clearances:
US EEZ(T)
Ancil Facs:
Other AUV
Project
PI/Institution
Project #
Days/Agency/Status
Laser Line Scan
Jules S. Jaffe
/
SIO
Not Specified
1/NAVY-ONR/F
Notes:
Testing a plankton towed microscope.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
20 Jul 2018
Dep:
21 Jul 2018
Arr:
21 Jul 2018
Unload:
22 Jul 2018
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
33N/117W
33N/117W
Greg Rouse
1/3
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
2018 SIO295
Greg Rouse
/
SIO
Not Specified
1/INST-UCSD-SIO/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
23 Jul 2018
Dep:
23 Jul 2018
Arr:
24 Jul 2018
Unload:
25 Jul 2018
San Diego, CA, USA
San Diego, CA, USA
San Clemente Ba/
NP09
NP09
32N/118W
32N/118W
Douglas Bartlett
2/3
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Pressure Effects
Douglas Bartlett
/
SIO
NA17OAR0110212
1/NOAA-OE/F
Notes:
Index # CIMBSHP 8 PM departure, 8 PM arrival. R/V Robert G. Sproul operates on a 24 hour day, therefore sea days and charge days (Op days) may not be the same.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
26 Jul 2018
Dep:
26 Jul 2018
Arr:
26 Jul 2018
Unload:
26 Jul 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
1/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
27 Jul 2018
Dep:
28 Jul 2018
Arr:
28 Jul 2018
Unload:
29 Jul 2018
San Diego, CA, USA
San Diego, CA, USA
USD series site/
NP09
NP09
33N/117W
33N/117W
Sarah Gray
1/3
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Ocean Geopaths
Anthony Rathburn
/
CSUB
1700942
1/NSF/GEO-ICER/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
30 Jul 2018
Dep:
30 Jul 2018
Arr:
31 Jul 2018
Unload:
31 Jul 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
2/2
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
01 Aug 2018
Dep:
02 Aug 2018
Arr:
02 Aug 2018
Unload:
03 Aug 2018
San Diego, CA, USA
San Diego, CA, USA
La Jolla/
NP09
NP09
33N/117W
33N/117W
Camille Pagniello
1/3
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Kelp APE
Camille Pagniello
/
SIO
Not Specified
1/INST-UCSD-SIO/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
04 Aug 2018
Dep:
04 Aug 2018
Arr:
30 Aug 2018
Unload:
30 Aug 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Stephen Z. Kelety
Maintenance
27/27
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Notes:
Engine tune-up.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
31 Aug 2018
Dep:
01 Sep 2018
Arr:
01 Sep 2018
Unload:
01 Sep 2018
San Diego, CA, USA
San Diego, CA, USA
La Jolla/
NP09
NP09
33N/117W
33N/117W
Camille Pagniello
1/2
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Kelp APE
Camille Pagniello
/
SIO
Not Specified
1/INST-UCSD-SIO/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
02 Sep 2018
Dep:
02 Sep 2018
Arr:
02 Sep 2018
Unload:
02 Sep 2018
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
33N/117W
33N/117W
Greg Rouse
1/1
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
2018 SIO295
Greg Rouse
/
SIO
Not Specified
1/INST-UCSD-SIO/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
03 Sep 2018
Dep:
03 Sep 2018
Arr:
03 Sep 2018
Unload:
03 Sep 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
1/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
04 Sep 2018
Dep:
04 Sep 2018
Arr:
04 Sep 2018
Unload:
04 Sep 2018
San Diego, CA, USA
San Diego, CA, USA
Off San Diego/
NP09
NP09
33N/117W
33N/117W
Greg Rouse
0/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
2018 SIO295
Greg Rouse
/
SIO
Not Specified
0/INST-UCSD-SIO/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
05 Sep 2018
Dep:
05 Sep 2018
Arr:
05 Sep 2018
Unload:
05 Sep 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Paul Roberts
1/1
Clearances:
US EEZ(T)
Ancil Facs:
Other AUV
Project
PI/Institution
Project #
Days/Agency/Status
UW AUV Imaging Proj.
Jules S. Jaffe
/
SIO
Not Specified
1/NAVY-ONR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
06 Sep 2018
Dep:
06 Sep 2018
Arr:
06 Sep 2018
Unload:
06 Sep 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Outreach
1/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
07 Sep 2018
Dep:
07 Sep 2018
Arr:
20 Sep 2018
Unload:
20 Sep 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
14/14
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
21 Sep 2018
Dep:
22 Sep 2018
Arr:
23 Sep 2018
Unload:
23 Sep 2018
San Diego, CA, USA
San Diego, CA, USA
USD series site/
NP09
NP09
33N/117W
33N/117W
Sarah Gray
2/3
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Ocean Geopaths
Anthony Rathburn
/
CSUB
1700942
1/NSF/GEO-ICER/F
Notes:
R/V Robert G. Sproul operates on a 24 hour day, therefore sea days and charge days (Op days) may not be the same.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
24 Sep 2018
Dep:
24 Sep 2018
Arr:
04 Oct 2018
Unload:
04 Oct 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
11/11
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
05 Oct 2018
Dep:
06 Oct 2018
Arr:
06 Oct 2018
Unload:
06 Oct 2018
San Diego, CA, USA
San Diego, CA, USA
S.CA Bight/
NP09
NP09
33N/117W
33N/117W
Andrew E. Allen
1/2
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
SIO280_2018
Andrew E. Allen
/
UCSD
Not Specified
1/INST-UCSD-SIO/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
07 Oct 2018
Dep:
07 Oct 2018
Arr:
07 Oct 2018
Unload:
08 Oct 2018
San Diego, CA, USA
San Diego, CA, USA
S.CA Bight/
NP09
NP09
33N/117W
33N/117W
Andrew E. Allen
1/2
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
SIO280_2018
Andrew E. Allen
/
UCSD
Not Specified
1/INST-UCSD-SIO/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
09 Oct 2018
Dep:
09 Oct 2018
Arr:
12 Oct 2018
Unload:
13 Oct 2018
San Diego, CA, USA
San Diego, CA, USA
Offshore CA/
NP09
NP09
33N/117W
33N/117W
Sophia Merrifield
4/5
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Expeditionary
Eric Terrill
/
SIO
N00014-12-G-0136 / 0012
3/NAVY-ONR/F
Notes:
R/V Robert G. Sproul operates on a 24 hour day, therefore sea days and charge days (Op days) may not be the same.
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
14 Oct 2018
Dep:
14 Oct 2018
Arr:
14 Oct 2018
Unload:
14 Oct 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Standby Days
1/1
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
15 Oct 2018
Dep:
15 Oct 2018
Arr:
16 Oct 2018
Unload:
17 Oct 2018
San Diego, CA, USA
San Diego, CA, USA
Offshore SCF/
NP09
NP09
33N/119W
33N/119W
Adrian Doran
2/3
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
CABOOSE
Adrian Doran
/
UCSD
Not Specified
2/INST-UCSD-SIO/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
18 Oct 2018
Dep:
18 Oct 2018
Arr:
25 Oct 2018
Unload:
25 Oct 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
8/8
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
26 Oct 2018
Dep:
27 Oct 2018
Arr:
27 Oct 2018
Unload:
27 Oct 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Brice Semmens
1/2
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
SIO136 cruise
Brice Semmens
/
SIO
Not Specified
1/INST-UCSD-SIO/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
28 Oct 2018
Dep:
28 Oct 2018
Arr:
28 Oct 2018
Unload:
29 Oct 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Simone Baumann-Pickering
1/2
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
SIO136 cruise
Brice Semmens
/
SIO
Not Specified
1/INST-UCSD-SIO/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
30 Oct 2018
Dep:
30 Oct 2018
Arr:
01 Nov 2018
Unload:
01 Nov 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Bruce Appelgate
Available for Service
3/3
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
02 Nov 2018
Dep:
03 Nov 2018
Arr:
03 Nov 2018
Unload:
03 Nov 2018
San Diego, CA, USA
San Diego, CA, USA
Local San Diego/
NP09
NP09
32N/119W
32N/119W
Andrew J. Lucas
1/2
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
SIO60
Andrew J. Lucas
/
SIO
Not Specified
1/INST-UCSD-SIO/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
04 Nov 2018
Dep:
04 Nov 2018
Arr:
04 Nov 2018
Unload:
05 Nov 2018
San Diego, CA, USA
San Diego, CA, USA
San Diego/
NP09
NP09
33N/117W
33N/117W
Andrew J. Lucas
1/2
Clearances:
US EEZ(T)
Project
PI/Institution
Project #
Days/Agency/Status
Laser Line Scan
Jules S. Jaffe
/
SIO
Not Specified
1/NAVY-ONR/F
Dates
Ports
Area/Navy Op
Lat/Lon
Chief Scientist
Activity/Total Days
Load:
06 Nov 2018
Dep:
06 Nov 2018
Arr:
31 Dec 2018
Unload:
18 Jan 2019
San Diego, CA, USA
San Diego, CA, USA
shipyard/
NP09
NP09
33N/117W
33N/117W
Stephen Z. Kelety
Maintenance
56/56
Clearances:
NONE(T)
Project
PI/Institution
Project #
Days/Agency/Status
Agency
Funded
Pending
Total
INST
23
0
23
NAVY
24
0
24
NOAA
1
0
1
NSF
6
0
6
NSF/GEO
2
0
2
OTHER
2
0
2
Total
58
0
58
<
Day Type
Total
Available for Service
45
Standby Days
113
Maintenance
99
At Sea for Science
68
Outreach
3
Total
328
<
Load/Unload Days
Total
NonChargeLoad
20
NonChargeUnload
17
Total
37