|
Project Title: |
Optical Oceanography and Air-Sea Interaction |
Project Status: |
Submitted |
Principal Investigator: |
Eric Terrill, SIO |
Project Institution: |
SIO |
Project ID: |
104090 |
Version #: |
3 |
Date Submitted: |
10/25/2013 1:29:00 PM |
Created By: |
Lisa Hazard |
Date Last Modified: |
10/10/2014 4:25:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NAVY/ONR/OAS - N00014-14-1-0060 - Funded |
Summary of Field Work: |
Transit offshore California between San Diego and San Clemente Island for Unmanned Underwater Vehicle (UUV) and mooring operations. The ship’s meteorological sensors will be complemented by deployment of small meteorological and wave measurement buoys. |
Summary of Facility Requirements: |
Vessel with over-the-side access to sea surface. A-frame, knuckle crane, small boat operations. Unique to R/V Sproul: proximity to the water's edge for deployment and recovery operations of unmanned vehicle |
Summary of other requirements and comments: |
|
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1007358 |
Created By: |
Lisa Hazard |
Date Last Modified: |
10/10/2014 4:25:00 PM |
Date Submitted: |
10/10/2014 4:25:00 PM |
|
Year: |
2015
|
Ship/Facility: |
Robert Gordon Sproul
|
Optimum Start Date:
|
6/1/2015 |
Dates to Avoid: |
|
|
|
|
|
Earliest Start Date: |
2/1/2015 |
Multi-Ship Op: |
No |
Latest Start Date: |
11/1/2015 |
Other Ship(s): |
|
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
8 |
0 |
0 |
0 |
8 |
Repeating Cruise?
(within same year) |
Yes |
Interval: |
2-3 months |
# of Cruises: |
4 |
|
Description of Repeating cruise requirements: |
intermittent 1-2 day trips throughout 2015. This request is for qty. 4 cruises of 1-2 days each for a total of 8 days |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
Unique to R/V Sproul: proximity to the water's edge for deployment and recovery operations of unmanned vehicle as well as ease of deployment and recovery for mooring operations. |
|
Short Description of Op Area
for use in schedules: |
Offshore CA |
Description of Op Area: |
Transit between San Diego and San Clemente Island |
Op Area Size/Dia.: |
TBD |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
32° 42' N
/
117° 13.8' W
map
|
|
|
Ending
|
32° 42' N
/
117° 13.8' E
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
|
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
|
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
None |
None |
None |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
|
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Eric Terrill, SIO |
# in Science Party |
5 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
over-the-side deployment of Unmanned Underwater Vehicle (UUV) and meteorological mooring |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
|
|