JHU/APL Wave Glider
-
2018
-
Robert Gordon Sproul
|
|
|
Project Title: |
Wave Glider testing off San Diego CA |
Project Status: |
Submitted |
Principal Investigator: |
James Kresge, JHU/APL |
Project Institution: |
JHU/APL |
Project ID: |
105980 |
Version #: |
1 |
Date Submitted: |
12/1/2017 7:24:00 AM |
Created By: |
James Kresge |
Date Last Modified: |
12/1/2017 7:24:00 AM |
URI Serial #: |
None |
Funding Agencies: |
NAVY - PP394 - Funded |
Summary of Field Work: |
Delivery, assembly and checkout of 4-6 Wave Gliders with acoustic packages. Loading onto support ship for deployment off 1SD. Two weeks independent in water testing followed by recovery of Wave Gliders, disassembly packing and transportation back to Laurel |
Summary of Facility Requirements: |
No facility requirements, see other requirements |
Summary of other requirements and comments: |
Space for two 20 foot CONEX boxes with access at both ends, 240 VAC power if available but not a requirement. Lifting capability (crane or fork lift) to remove / lift CONEX boxes from / onto semi truck. Work space (area only) in vicinity of CONEX boxes. Charter of MV Sproul for one day each for deployment and retrieval of Wave Gliders in vicinity of 1SD |
|
Type of Request: |
Primary Ship Use |
Request Status: |
Submitted |
Request ID: |
1009660 |
Created By: |
James Kresge |
Date Last Modified: |
12/1/2017 7:24:00 AM |
Date Submitted: |
12/1/2017 7:24:00 AM |
|
Year: |
2018
|
Ship/Facility: |
Robert Gordon Sproul
|
Optimum Start Date:
|
2/8/2018 |
Dates to Avoid: |
One day use, primary launch day 2/8/18 with backup of 2/9/18 |
|
|
|
|
Earliest Start Date: |
2/8/2018 |
Multi-Ship Op: |
No |
Latest Start Date: |
2/9/2018 |
Other Ship(s): |
N/A |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
1 |
0 |
0 |
0 |
1 |
Repeating Cruise?
(within same year) |
No |
Interval: |
N/A |
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
N/A |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
Choice of launch dates coordinated with US Navy operation in the area. |
|
Short Description of Op Area
for use in schedules: |
1SD |
Description of Op Area: |
Launch Wave Gliders just to west of San Diego entrance buoy 1SD in low shipping density area |
Op Area Size/Dia.: |
1 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
32° 36' N
/
117° 18' W
map
|
|
|
Ending
|
32° 36' N
/
117° 18' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
US EEZ |
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
N/A |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
San Diego, CA, USA |
None, |
San Diego, CA, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
Same day in and out of Scripps San Diego |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
James Kresge, JHU/APL |
# in Science Party |
6 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
2 |
Explanation of Science Party Requirements and Technician Requirements |
Number to safely handle and deploy 4-6 Wave gliders from ship. Require one ship's personnel for crane operator and one for deck interface |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
Operator for crane on deck for deployment of Wave Gliders
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
N/A |
|