View Schedule

or schedule as:
the schedule as:
  2021 - Thomas G. Thompson  
Version 15
Final - ID #14636    Version #3 - 1/3/2022

Scheduling Contact(s)
Robert Kamphaus kamphaus*%*%*uw^%^%^edu (206) 685-5672
Elizabeth A. Rios Brenner ebrenner2156*%*%*att^%^%^net (760) 801-9650

  Notes:   2021 US Academic Research Fleet vessel schedules are subject to change as the COVID-19 pandemic evolves. Scheduled cruise Chief Scientists are urged to keep in close contact with the vessel operators to remain aware of any updates/changes.


To accommodate RR Elon's OBS cruise back to November. And relieve Gartman/Resing Sentry conflict.
8/6 Craig Young requires 5 additional dates of science and 2 additional days of transit.
Updated STR to follow.
8/25 Added one day each for Jason and Sentry engineering dive to Young.
9/3 Advance Young by 2 days. This allows for 7 full days of transit for Jason between Trude/Valentine on RR and Young on TGT. We anticipate an entirely new Jason team will sail on Young.
9/11 Moved transit to Darwin, Landry and IO projects to a new 2022 LOI.
9/15 Changed funding line for GO-SHIP
9/17 The UW funded Alaskan Fjords/Glaciers cruise has been canceled, formally scheduled in late 2020/early 2021.
10/6 Split out GO-FAR to estimate Panama canal crossing date (Pacific-Atlantic).
10/13 Split out transit Gulfport to San Diego to estimate Panama canal crossing date (Atlantic to Pacific).
11/20 Due to equipment shipping delays remove the 5 day EM-Evans component from the GOFAR cruise. Move the departure 5 days later.
11/25 Depart Seatte one day early for a one day non-op in San Diego
12/17-Move GO-SHIP intermediate port from Puerto Rico to US Virgin Islands. Transfer OOI-RCA and OOI-Endurance to TGT, in exchange of Ohman and Resing to RR. Add one day to the transit from Gulfport to Cristobal.
12/31 One additional day required for transit from Seattle to San Diego. The revised departure from Seattle is now 12 January.
1/15 Remove Wilcock/NSF from D. Kelley RCA OOI cruise.
1/26 Add an additional transit day from Seattle to San Diego to begin V. Armbrust's project plus one day for senior thesis instruction. Delay SEA-SAN transit and Armbrust start date to increase general upkeep and outfitting in October/Seattle.
1/28 Removed two ONR days from OOI-RCA
3/3. Arrival into Port Everglades, FL one day early. Added two days to Craig Young for H. Seim. Start Kelley in Seattle.
4/7 Added a mid cruise personnel transfer in Key West for Craig Young. Shawn Arellano will be chief scientist for first leg.
4/29 Withdraw InVADER Aaron Marburg/2/NASA/T from D. Kelley, OOI. Increase standby days to 2. Advance OOI Endurance by one day, add Sr. Thesis cruise HON-SAN 14 days.
5/4 Reduce OOI Endurance by one science day=15 science days.
5/7 Added Inspection in December - tentative dates.
5/17 Changed GOSHIPA22 arrival date--arrived one day early
6/8 Added dates for 4 OOI-RCA legs
7/2 ETA to Seattle is one day earlier than scheduled on 14 June. Canal crossing completed earlier than anticipated.
7/20 - changed TN-395 cruise type to At Sea For Science for cruise planner interface.
7/22 Split out TN-394 OOI Endurance into three legs.
8/16 TN-393B Arrival one day early. Port day 8/17 will be non-op.
8/31 Added two days for recovery efforts for ROV's Hercules and Argus for Ocean Exploration Trust
9/10 Adjustments to the schedule due to DG#4 oil cooler failure. Fram/OOI Endurance.
9/20 Extend 30 day general upkeep period in October to repair generator. Removed one instructional day for TN-396.
9/29 Add an additional instruction day to Sr. Thesis cruise TN-398
10/6 Add one mob day for G. Armbrust to transit, Seattle to SD.
10/28 Delay the schedule after the shipyard by three additional days, generator repair issues.
11/8. TGT out of the shipyard two days earlier than originally anticipated. Shipyard period reduced by two days, add two days to General Upkeep and Outfitting at Pier 91.
12/19 - adjustment to funded days for OOI-Endurance due to engine repair (24 hours in port) - RAK
  View Summary     Set Default Associated Cruises
Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:01 Jan 2021
Dep:01 Jan 2021
Arr:11 Jan 2021
Unload:11 Jan 2021
 
Seattle, WA, USA
Seattle, WA, USA
 
Seattle/
NP09
NP09
 
 
 
48N/122W
48N/122W
 
  Robert Kamphaus
Standby Days
  11/11

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Pre-cruise isolation (crew quarantine) prior to returning to operations.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:12 Jan 2021
Dep:12 Jan 2021
Arr:17 Jan 2021
Unload:17 Jan 2021
 
Seattle, WA, USA
San Diego, CA, USA
 
Sea-SAN/
NP09
NP09
 
 
 
48N/122W
33N/117W
 
  Robert Kamphaus
Transit Cruise
  6/6

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 6/NSF-OCE-MGG/F
 
Notes: TN-386

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:18 Jan 2021
Dep:18 Jan 2021
Arr:18 Jan 2021
Unload:18 Jan 2021
 
San Diego, CA, USA
San Diego, CA, USA
 
San Diego/
NP09
NP09
 
 
 
33N/117W
33N/117W
 
  Robert Kamphaus
General Upkeep and Outfitting
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Jan 2021
Dep:21 Jan 2021
Arr:25 Feb 2021
Unload:25 Feb 2021
 
San Diego, CA, USA
Balboa, Panama
 
Gofar TF, EPR/
SP03
SP03
 
 
 
5S/106W
4S/106W
 
  John A. Collins
  36/38

Clearances: NONE(T)

Ancil Facs: Ocean Bottom Seismograph Instrument Pool (OBSIP), Portable Winch
 
Project PI/Institution Project # Days/Agency/Status
Gofar TF Earthquakes Margaret Boettcher/UNH 1832830 38/NSF-OCE-MGG/F
 
Notes: TN-387 Deferred from 2020, Changed ChiSci from Rob Evans to John Collins. Reduced science days from 25 to 20 days. Defer EM component (R.Evans) to 2022. Feb 25th 1100 hrs - ETA Balboa 1800 hrs - POB time / Scheduled to commence BOOKED transit 2000 hrs - Scheduled to arrive first locks

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:26 Feb 2021
Dep:26 Feb 2021
Arr:03 Mar 2021
Unload:05 Mar 2021
 
Cristobal, Panama
Port Everglades, FL, USA
 
Gofar TF, EPR/
NA09
NA09
 
 
 
9N/80W
26N/80W
 
  John A. Collins
Transit Cruise
  6/8

Clearances: NONE(T)

Ancil Facs: Ocean Bottom Seismograph Instrument Pool (OBSIP), Portable Winch
 
Project PI/Institution Project # Days/Agency/Status
Gofar TF Earthquakes Margaret Boettcher/UNH 1832830 8/NSF-OCE-MGG/F
 
Notes: TN-387B Assumes Panama Canal crossing early evening on the 26th. No planned personnel disembarkment in Panama. Deferred from 2020 Arrival one day early.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Mar 2021
Dep:06 Mar 2021
Arr:06 Mar 2021
Unload:06 Mar 2021
 
Port Everglades, FL, USA
Port Everglades, FL, USA
 
in port/
NA09
NA09
 
 
 
26N/80W
26N/80W
 
  Robert Kamphaus
Standby Days
  1/1

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Crew change day.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Mar 2021
Dep:07 Mar 2021
Arr:11 Mar 2021
Unload:11 Mar 2021
 
Port Everglades, FL, USA
Woods Hole, MA, USA
 
North Atlantic/
NA09
NA06
 
 
 
26N/80W
42N/71W
 
  Robert Kamphaus
Transit Cruise
  5/5

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
US GO-SHIP Lynne D. Talley/SIO 1437015 5/NSF-OCE-PO/F
 
Notes: TN-388 A20/A22 4 days for additional transit days if starting from Ft. Lauderdale RT with WHOI as intermediate port stop. WHOI to WHOI more efficient for Young-Jason load out.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:12 Mar 2021
Dep:16 Mar 2021
Arr:16 Apr 2021
Unload:18 Apr 2021
 
Woods Hole, MA, USA
Charlotte Amalie, St. Thomas, Virgin Islands
 
North Atlantic/
NA06
NA09
 
 
 
43N/51W
7N/53W
 
  Ryan J. Woosley
  32/38

Clearances: France(A)
 
Project PI/Institution Project # Days/Agency/Status
US GO-SHIP Lynne D. Talley/SIO 1437015 38/NSF-OCE-PO/F
 
Notes: TN-389 A20. This was a replacement for a deferred 2020 GO-SHIP I05.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Apr 2021
Dep:20 Apr 2021
Arr:16 May 2021
Unload:19 May 2021
 
Charlotte Amalie, St. Thomas, Virgin Islands
Woods Hole, MA, USA
 
North Atlantic/
NA09
NA06
 
 
 
13N/70W
40N/70W
 
  Viviane Menezes
  27/31

Clearances: Bermuda(A), Dominican Republic(A), Netherlands(A)
 
Project PI/Institution Project # Days/Agency/Status
US GO-SHIP Lynne D. Talley/SIO 1437015 31/NSF-OCE-PO/F
 
Notes: TN-390 A22. This was a replacement for a deferred 2020 GO-SHIP I05. Arrived WHOI one day early.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:20 May 2021
Dep:20 May 2021
Arr:20 May 2021
Unload:20 May 2021
 
Woods Hole, MA, USA
Woods Hole, MA, USA
 
WHOI/
NA06
NA06
 
 
 
42N/71W
42N/71W
 
  Robert Kamphaus
Standby Days
  1/1

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:21 May 2021
Dep:25 May 2021
Arr:08 Jun 2021
Unload:08 Jun 2021
 
Woods Hole, MA, USA
Key West, FL, USA
 
GOM and WAM/
NA06
NA09
 
 
 
42N/71W
30N/89W
 
  Shawn Arellano
  15/19

Clearances: NONE(T), US EEZ(T)

Ancil Facs: Sentry, Jason
 
Project PI/Institution Project # Days/Agency/Status
seep larval dispersa Craig M. Young/OIMB 1851383 15/NSF-OCE-BIO/F
PEACH Harvey Seim/UNC_CH 1558920 2/NSF-OCE-PO/F
Sentry2021EngDives Sean Kelley/WHOI Not Specified 1/NSF-OCE-IPS/F
2021 Jason Eng Dives Matt Heintz/WHOI Not Specified 1/NSF-OCE-IPS/F
 
Notes: TN-391A Young requested Sentry. Increased science days by 5, increased transit by 2. Added two days for PEACH. Mid cruise small boat personnel transfer in Key West, arrived and departed the same day. The charge for the 8th was counted on this leg.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:08 Jun 2021
Dep:08 Jun 2021
Arr:18 Jun 2021
Unload:22 Jun 2021
 
Key West, FL, USA
Gulfport, MS, USA
 
GOM and WAM/
NA06
NA09
 
 
 
42N/71W
30N/89W
 
  Craig M. Young
  10/14

Clearances: NONE(T), US EEZ(T)

Ancil Facs: Sentry, Jason
 
Project PI/Institution Project # Days/Agency/Status
seep larval dispersa Craig M. Young/OIMB 1851383 14/NSF-OCE-BIO/F
Sentry2021EngDives Sean Kelley/WHOI Not Specified 0/NSF-OCE-IPS/F
2021 Jason Eng Dives Matt Heintz/WHOI Not Specified 0/NSF-OCE-IPS/F
 
Notes: TN-391B. Arrived two days early due to "Potential Tropical Cyclone Three" forming in the central Gulf of Mexico and forecast to make it too rough to work.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:23 Jun 2021
Dep:23 Jun 2021
Arr:29 Jun 2021
Unload:29 Jun 2021
 
Gulfport, MS, USA
Cristobal, Panama
 
transit/
NA09
NA09
 
 
 
30N/89W
9N/80W
 
  Robert Kamphaus
Transit Cruise
  7/7

Clearances: NONE(T), US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 7/NSF-OCE-BIO/F
 
Notes: TN-392A

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Jun 2021
Dep:30 Jun 2021
Arr:14 Jul 2021
Unload:14 Jul 2021
 
Balboa, Panama
Seattle, WA, USA
 
transit/
NA09
NP09
 
 
 
9N/80W
48N/122W
 
  Robert Kamphaus
Transit Cruise
  15/15

Clearances: NONE(T), US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Not Specified 10/NSF-OCE-PO/F
Not Specified 5/NSF-OCE-MGG/F
 
Notes: TN-392B June 29th, 2021 1010 hrs End of Sea Passage 1024 hrs Passed Breakwater 1040 hrs Anchored Cristobal Inner Roads 1314 hrs Pilot On Board 1340 hrs Heaved Anchor 1341 hrs Commenced Canal Transit 2344 hrs Completed Canal Transit June 30th, 2021 0043 hrs Sailed Balboa

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:15 Jul 2021
Dep:15 Jul 2021
Arr:29 Jul 2021
Unload:29 Jul 2021
 
Seattle, WA, USA
Seattle, WA, USA
 
In home port/
NP09
NP09
 
 
 
48N/122W
48N/122W
 
  Robert Kamphaus
Standby Days
  15/15

Clearances: NONE(T), US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:30 Jul 2021
Dep:01 Aug 2021
Arr:08 Aug 2021
Unload:08 Aug 2021
 
Seattle, WA, USA
Newport, OR, USA
 
See below/
NP09
NP09
 
 
 
46N/130W
46N/130W
 
  Michael F. Vardaro
  8/10

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI-RCA Deborah S. Kelley/UW A101403 10/NSF-OOI-OOI/F
Jason Not Specified 0/OTHER/P
 
Notes: TN-393A Wendi Ruef Co-Chief, James Tilley Co-Chief Axial Seamount, Slope Base and Endurance

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:09 Aug 2021
Dep:10 Aug 2021
Arr:16 Aug 2021
Unload:16 Aug 2021
 
Newport, OR, USA
Newport, OR, USA
 
See below/
NP09
NP09
 
 
 
46N/130W
46N/130W
 
  Orest Kawka
  7/8

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI-RCA Deborah S. Kelley/UW A101403 6/NSF-OOI-OOI/F
MARUM - M3 Deborah S. Kelley/UW A127457 1/OTHER/F
Pythias Revisited Deborah S. Kelley/UW 1658201 1/NSF-OCE-MGG/F
Jason Not Specified 0/OTHER/P
 
Notes: TN-393B Mike Vardaro Co-Chief, James Tilley Co-Chief. TGT arrived one day early due to generator problems. Reduced OOI charge by one day. Port day will be a non-op repair day-see below. Endurance/Hydrate/Slope

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Aug 2021
Dep:17 Aug 2021
Arr:17 Aug 2021
Unload:17 Aug 2021
 
Newport, OR, USA
Newport, OR, USA
 
See below/
NP09
NP09
 
 
 
46N/130W
46N/130W
 
  Robert Kamphaus
Overhaul or Repair
  1/1

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: TGT arrived into Newport 8/16 one day earlier than scheduled due to diesel generator problems (both DG #2 and DG #3). We hope to have DG #3 resolved within a day or so, it appears DG #2 may be a longer term repair.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:18 Aug 2021
Dep:19 Aug 2021
Arr:23 Aug 2021
Unload:23 Aug 2021
 
Newport, OR, USA
Newport, OR, USA
 
Slope Base/
NP09
NP09
 
 
 
46N/130W
46N/130W
 
  Orest Kawka
  5/6

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI-RCA Deborah S. Kelley/UW A101403 5/NSF-OOI-OOI/F
OOI Deborah S. Kelley/UW Not Specified 1/INST-UW/F
Jason Not Specified 0/OTHER/P
 
Notes: TN-393C James Tilley Co-Chief

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:24 Aug 2021
Dep:25 Aug 2021
Arr:03 Sep 2021
Unload:05 Sep 2021
 
Newport, OR, USA
Newport, OR, USA
 
Axial/
NP09
NP09
 
 
 
46N/130W
46N/130W
 
  Orest Kawka
  10/13

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
OOI-RCA Not Specified 9/INST-UW/F
Ocean Trust Not Specified 2/OTHER/F
Phase 2 Enhancements William W. Chadwick/OSU_HMSC 1928282 1/NSF-OCE-MGG/F
BOEM Deborah S. Kelley/UW Not Specified 1/BOEM/F
 
Notes: TN-393D Katie Bingham Co-Chief. 2 days added for ROV Hercules and Argus (Ocean Exploration Trust's dual-bodied system) rescue mission at Endeavour.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:06 Sep 2021
Dep:08 Sep 2021
Arr:09 Sep 2021
Unload:09 Sep 2021
 
Newport, OR, USA
Newport, OR, USA
 
NP9/
NP09
NP09
 
 
 
44N/124W
44N/124W
 
  Jonathan P. Fram
  2/4

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Endurance Array OM Edward P. Dever/OSU-CEOAS Not Specified 4/NSF-OOI-OOI/F
 
Notes: TN-394A Return to port due to DG#4 oil cooler failure. Arrival 9/9 1530

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:10 Sep 2021
Dep:10 Sep 2021
Arr:15 Sep 2021
Unload:15 Sep 2021
 
Newport, OR, USA
Newport, OR, USA
 
NP9/
NP09
NP09
 
 
 
44N/124W
44N/124W
 
  Jonathan P. Fram
  6/6

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Endurance Array OM Edward P. Dever/OSU-CEOAS Not Specified 6/NSF-OOI-OOI/F
 
Notes: TN-394B

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:16 Sep 2021
Dep:16 Sep 2021
Arr:18 Sep 2021
Unload:18 Sep 2021
 
Newport, OR, USA
Newport, OR, USA
 
NP9/
NP09
NP09
 
 
 
44N/124W
44N/124W
 
  Jonathan P. Fram
  3/3

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Endurance Array OM Edward P. Dever/OSU-CEOAS Not Specified 3/NSF-OOI-OOI/F
 
Notes: TN-394C

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:19 Sep 2021
Dep:19 Sep 2021
Arr:22 Sep 2021
Unload:23 Sep 2021
 
Newport, OR, USA
Newport, OR, USA
 
NP9/
NP09
NP09
 
 
 
44N/124W
44N/124W
 
  Jonathan P. Fram
  4/5

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Endurance Array OM Edward P. Dever/OSU-CEOAS Not Specified 5/NSF-OOI-OOI/F
 
Notes: TN-394D

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:24 Sep 2021
Dep:25 Sep 2021
Arr:01 Oct 2021
Unload:01 Oct 2021
 
Newport, OR, USA
Seattle, WA, USA
 
PNW/
NP09
NP09
 
 
 
45N/124W
48N/122W
 
  Jan Newton
  7/8

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Mooring/box coring Jan Newton/UW_APL Not Specified 6/INST-UW/F
1 Dever 2 Kelley Not Specified 2/NSF-OOI-OOI/F
 
Notes: TN-395 Newton Cha Ba Mooring and Andrea Ogsten box coring at Astoria Canyon

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:02 Oct 2021
Dep:02 Oct 2021
Arr:06 Nov 2021
Unload:06 Nov 2021
 
Seattle, WA, USA
Seattle, WA, USA
 
Homeport/
NP09
NP09
 
 
 
48N/122W
48N/122W
 
  Robert Kamphaus
Overhaul or Repair
  36/36

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: Z-Drive warranty work. Lube science wire. Diesel generator #2 repair, includes sea trials. Dock trials on 11/5 AM, transit ship canal + autopilot sea trial on 11/5 PM, and sea trials at Pier 91 on 11/6.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:07 Nov 2021
Dep:07 Nov 2021
Arr:09 Nov 2021
Unload:09 Nov 2021
 
Seattle, WA, USA
Seattle, WA, USA
 
Homeport/
NP09
NP09
 
 
 
47N/122W
47N/122W
 
  Robert Kamphaus
General Upkeep and Outfitting
  3/3

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
 
Notes: General Upkeep and Outfitting occurring at Pier 91.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:10 Nov 2021
Dep:11 Nov 2021
Arr:16 Nov 2021
Unload:16 Nov 2021
 
Seattle, WA, USA
San Diego, CA, USA
 
E. Pacific/
NP09
NP09
 
 
 
48N/122W
33N/117W
 
  E. Virginia Armbrust
  6/7

Clearances: US EEZ(T)
 
Project PI/Institution Project # Days/Agency/Status
Transit to San Diego Richard G. Keil/UW Not Specified 7/INST-UW/F
STEMSEAS Sharon Cooper/OL Not Specified 0/NSF-OCE-EDU/F
 
Notes: TN-396. STEMSEAS participation.

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Nov 2021
Dep:18 Nov 2021
Arr:15 Dec 2021
Unload:16 Dec 2021
 
San Diego, CA, USA
Honolulu, HI, USA
 
North Pacific/
NP09
NP12
 
 
 
33N/117W
21N/158W
 
  E. Virginia Armbrust
  28/30

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Gradients 4 E. Virginia Armbrust/UW Not Specified 20/OTHER/F
Not Specified 10/INST-UW/F
 
Notes: TN-397

Dates   Ports   Area/Navy Op   Lat/Lon   Chief Scientist   Activity/Total Days
Load:17 Dec 2021
Dep:18 Dec 2021
Arr:30 Dec 2021
Unload:31 Dec 2021
 
Honolulu, HI, USA
San Diego, CA, USA
 
Eastern Pacific/
NP12
NP09
 
 
 
21N/158W
33N/117W
 
  Mark J. Warner
  13/15

Clearances: NONE(T)
 
Project PI/Institution Project # Days/Agency/Status
Senior thesis cruise Richard G. Keil/UW Not Specified 15/INST-UW/F
 
Notes: TN-398 TGT will be due for annual ABS and USCG COI inspections. Currently 10 standby days in January 2022. GOFAR scheduled to sail 1/13/2022. Crew change 30 December.
Agency   Funded   Pending   Total
BOEM   1   0   1
INST   48   0   48
NSF   183   0   183
NSF-OOI   41   0   41
OTHER   23   0   23
Total  296 0 296
<
Day Type   Total
Transit Cruise   39
General Upkeep and Outfitting   4
Standby Days   28
Overhaul or Repair   37
At Sea for Science   219
Total  327
<
Load/Unload Days   Total
ChargeLoad   22
ChargeUnload   16
Total  38