Project Title: |
Collaborative Research: An Observational and Modeling Study of the Physical Processes Driving Exchanges between the Shelf and the Deep Ocean At Cape Hatteras |
Project Status: |
Submitted |
Principal Investigator: |
Harvey Seim, UNC_CH |
Project Institution: |
UNC_CH |
Project ID: |
107065 |
Version #: |
1 |
Date Submitted: |
2/15/2021 11:05:00 PM |
Created By: |
Harvey Seim |
Date Last Modified: |
2/15/2021 11:05:00 PM |
URI Serial #: |
None |
Funding Agencies: |
NSF/OCE/PO - 1558920 - Funded |
Summary of Field Work: |
PEACH deployed a mooring area near Cape Hatteras NC in April 2017 and recovered most of the area in Nov 2018. Four (4) moorings failed to surface and we hope to recover these with the aid of a ROV. |
Summary of Facility Requirements: |
We hope to use Jason, aboard the R/V Thompson, to attempt recovery of the moorings. Two bottom pods are on the upper slope in 200-300 m depths, and two CPIESs are on the seaward side of the Gulf Stream in 2800-4000 m depths. |
Summary of other requirements and comments: |
Because there is no space for personnel on the cruise we will participate virtually on the recovery dives, hence solid communications allowing video is needed. |
|
Type of Request: |
Collaborative Ship Use |
Request Status: |
Submitted |
Request ID: |
1011492 |
Created By: |
Harvey Seim |
Date Last Modified: |
2/15/2021 11:05:00 PM |
Date Submitted: |
2/15/2021 11:05:00 PM |
|
Year: |
2021
|
Ship/Facility: |
Thomas G. Thompson
|
Optimum Start Date:
|
5/26/2021 |
Dates to Avoid: |
We should be available to participate remotely for any of these dates |
|
|
|
|
Earliest Start Date: |
5/26/2021 |
Multi-Ship Op: |
No |
Latest Start Date: |
6/19/2021 |
Other Ship(s): |
none |
|
Operating Days Needed: |
Science Days |
Mob Days |
De-Mob Days |
Estimated Transit Days |
Total Days |
2 |
0 |
0 |
0 |
2 |
Repeating Cruise?
(within same year) |
No |
Interval: |
|
# of Cruises: |
|
|
Description of Repeating cruise requirements: |
none |
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations: |
none |
|
Short Description of Op Area
for use in schedules: |
Cape Hatteras |
Description of Op Area: |
Offshore of North Carolina from the shelf break to the 4000 m isobath |
Op Area Size/Dia.: |
100 |
|
|
|
Lat/Long |
Marsden Grid |
Navy Op Area |
Beginning
|
34° 54' N
/
75° 18' W
map
|
|
|
Ending
|
35° 36' N
/
73° 46.8' W
map
|
|
|
|
Show Degrees Minutes |
|
|
|
|
Foreign Clearance Required? |
No |
Coastal States:
NONE |
Important Info on Foreign Research Clearances
|
|
Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
|
No |
If yes, have you applied for the necessary permits through your export control office?
|
No |
Questions about ITAR/EAR regulations?
|
Comments about foreign clearance requirements or description of any other special permitting requirements (e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.) |
none |
|
Requested Start Port |
Intermediate Port(s) |
Requested End Port |
Woods Hole, MA, USA |
None |
Gulfport, MS, USA |
Explanation/justification for requested ports and dates of intermediate stops or to list additional port stops |
These are the ports for Craig Young's planned cruise. |
Important Info on Working in Foreign Ports
|
|
|
Chief Scientist: |
Harvey Seim, UNC_CH |
# in Science Party |
1 |
# of different science teams |
1 |
# Marine Technicians to be
provided by ship operator:
(include in science party total)
|
1 |
Explanation of Science Party Requirements and Technician Requirements |
We are not planning to have anyone on board and will participate remotely (the system won't allow an entry of zero) |
|
Dynamic Positioning | ADCP | Multibeam | Seismic |
Dredging/Coring/Large Dia. Trawl Wire | Stern A-frame | Fiber Optic (.681) | 0.680 Coax Wire |
SCUBA Diving | Radioisotope use - briefly describe | NO Radioisotope use/Natural level work | Other Operator Provided Inst. - Describe |
0 PI-Provided Vans - briefly describe | MOCNESS | | |
|
Explain Instrumentation or Capability requirements that could affect choice of ship in scheduling. |
n/a
|
|
|
Explain Major Ancillary Facilities Requirements and list description and provider for "other" systems. |
n/a |
|