For all NEW or RESUBMITTED Projects/Ship Time Requests, go to https://mfp.us and create a new SME. Some STRs for projects starting in 2022 and beyond have already been moved to Marine Facilities Planning (mfp.us). Check your MFP Science Portal for any projects that might already be moved. If you need to make edits to projects that begin in 2022 and beyond, please contact mfp@unols.org for assistance. Be sure to indicate the Project and STR IDs that you would like to edit. For more information on getting into MFP, see the More Information button below.

  Pythias Revisited  -  2020  -  Roger Revelle  
  Project Information  
Project Title: Collaborative Research: Pythia's Oasis - Access to Deep
Subduction Zone Fluids
Project Status: Submitted
Principal Investigator: Deborah S. Kelley, UW Project Institution: UW
Project ID: 106799 Version #: 1
Date Submitted: 3/4/2020 12:43:00 AM Created By: Deborah S. Kelley
Date Last Modified: 7/19/2021 9:43:00 PM URI Serial #: None
Funding Agencies: NSF/OCE/MGG - 1658201 - Funded
Summary of Field Work: This request is for 1 day of Jason time added onto the Regional Cabled Array Maintenance cruise summer 2020 to conduct seafloor survey work with the ROV Jason of the novel Pythias Oasis site, which was not completed due to a delay in getting a required Sentry high resolution bathymetric map of the site during the Pythias Oasis 2019 expedition. The main goal is to survey a long linear depression on Pythias Ridge that was not surveyed by Jason in 2019, but which clearly shows up as a major feature on the high resolution bathymetry. In addition, a "moat" surrounding a significant collapse zone will be surveyed.
Summary of Facility Requirements: This work will require use of the remotely operated vehicle Jason that will be hosted on the R/V Revelle required for the RCA work.
Summary of other requirements and comments:  
Ship Request Identification
Type of Request: Primary Ship Use Request Status: Submitted
Request ID: 1011036 Created By: Deborah S. Kelley
Date Last Modified: 3/4/2020 12:43:00 AM Date Submitted: 3/4/2020 12:43:00 AM
Requested Ship, Operating Days and Dates
Year: 2020 Ship/Facility: Roger Revelle
Optimum Start Date: 7/9/2020 Dates to Avoid: This work will occur on one of the RCA 3-4 legs; specific scheduling is now underway.
 
 
Earliest Start Date: 7/9/2020 Multi-Ship Op: No
Latest Start Date: 7/16/2020 Other Ship(s):

Operating Days Needed: Science Days Mob Days De-Mob Days Estimated Transit Days Total Days
1 0 0 0 1
Repeating Cruise?
(within same year)
No Interval:   # of Cruises:  

Description of Repeating cruise requirements: N/A
Justification/Explanation for ship choice, dates,
conflicts, number of days & multi-ship operations:
Approved by NSF-MGG as an add-on day to the RCA work, so needs to be scheduled during this summers Operations and Maintenance expedition.
Work Area for Cruise
Short Description of Op Area
for use in schedules:
Cascadia Margin
Description of Op Area: Site is ~ 80 km west of Newport Oregon
Op Area Size/Dia.: 2
 
  Lat/Long Marsden Grid Navy Op Area
Beginning
44.46667° N / 125.08333° W map
157 map
NP09 map
Ending
44.46667° N / 125.08333° W map
157 map
NP09 map
  Show Degrees Minutes    
Foreign Clearance and Permitting Requirements
Foreign Clearance Required? No Coastal States:
 Important Info on Foreign Research Clearances  

Are you or any member in your science party bringing in any science equipment items which are regulated for export by the International Traffic in Arms Regulations (ITAR) and/or the Export Administration Regulations (EAR)?
No If yes, have you applied for the necessary permits through your export control office? No
 Questions about ITAR/EAR regulations?

Comments about foreign clearance requirements or
description of any other special permitting requirements
(e.g., MMPA, ESA, IHA, Marine Sanctuaries, etc.)
N/A
Port Calls
Requested Start Port Intermediate Port(s) Requested End Port
Newport, OR, USA None Newport, OR, USA
Explanation/justification for requested
ports and dates of intermediate stops
or to list additional port stops
Newport is the mobilizaton and demobe port for the RCA cruise.

 Important Info on Working in Foreign Ports

 
Science Party
Chief Scientist: Deborah S. Kelley, UW
# in Science Party 36 # of different science teams 2 # Marine Technicians to be
provided by ship operator:
(include in science party total)
3
Explanation of Science Party Requirements and Technician Requirements The 2 teams include the UW RCA team and the Jason team,
Instrumentation Requirements That Impact Scheduling Decisions
Selected Dynamic PositioningSelected ADCPSelected MultibeamUnselected Seismic
Unselected Dredging/Coring/Large Dia. Trawl WireUnselected Stern A-frameUnselected Fiber Optic (.681)Unselected 0.680 Coax Wire
Unselected SCUBA DivingUnselected Radioisotope use - briefly describeUnselected NO Radioisotope use/Natural level workUnselected Other Operator Provided Inst. - Describe
0 PI-Provided Vans - briefly describe Unselected MOCNESS  
Explain Instrumentation or Capability
requirements that could affect choice
of ship in scheduling.

We will utilize the multibeam system for imaging of bubble plumes issuing from Pythias Oasis.

Major Ancillary Facilities (that require coordination of schedules with ship schedule)
Aircraft
Unselected Helicopter Ops (USCG)Unselected Twin OtterUnselected Unmanned Aerial Systems (UAS) 
Autonomous Underwater Vehicle (AUV)
Unselected Other AUVUnselected Sentry  
Coring Facility
Unselected Jumbo Piston CoringUnselected Large Gravity Core Unselected MC800 multicorer w/ MISO camera/telemetryUnselected OSU Coring Facility (MARSSAM)
Unselected Other Large Coring FacilityUnselected WHOI Long Core  
Human Occupied Vehicle (HOV)
Unselected AlvinUnselected Clelia (HBOI)Unselected JSL I & II (HBOI)Unselected Other HOV
Other Facility
Unselected MISO Facility - deep-sea imagingUnselected Other FacilityUnselected Potential Fields Pool Equipment 
Remotely Operated Vehicle (ROV)
Selected JasonUnselected Other ROV  
Seismic Facility
Unselected Ocean Bottom Seismograph Instrument Center (OBSIC)Unselected Ocean Bottom Seismograph Instrument Pool (OBSIP)Unselected Ocean-Bottom Seismometer Program (UTIG)Unselected Other Seismic/OBS Facility
Unselected PASSCALUnselected Portable MCS groupUnselected Portable MCS/SCS groupUnselected U.S. Geological Survey Ocean Bottom Seismometer Facility (USGS at WHOI)
Towed Underwater Vehicle
Unselected ARGO IIUnselected Hawaii MR1 (HMRG)Unselected IMI12 (HMRG)Unselected IMI120 (HMRG - formerly DSL 120A)
Unselected IMI30 (HMRG)Unselected Other Towed Underwater VehicleUnselected Towfish 
UNOLS Van Pool
Unselected AUV Lab Van #1Unselected Clean Lab VanUnselected Cold Lab VanUnselected General Purpose Lab Van
Unselected Radioisotope Lab VanUnselected Wet Lab Van  
UNOLS Winch Pool
Unselected Mooring SpoolerUnselected Portable WinchUnselected Turn Table 
Explain Major Ancillary Facilities
Requirements and list description
and provider for "other" systems.
Jason will be required to conduct imaging of the seafloor and associated seep sites.

Expand request schedules  Associated Schedules

Expand request history Ship Request History